Z Zomefy

RERA registered P52100045525 Active

Anshul Casa I-Building

Wakad, Pune · Residential / Group Housing by Sai Siddhi Promoters and Builders

Official record Updated from the register 07 October 2026. Anything filed since then is not here yet.

In short

Anshul Casa I-Building in Wakad is MahaRERA-registered (P52100045525) and still under construction, with possession filed for March 2027. Buyers have already registered 25 sales here at a median ₹8,684 per sq ft of carpet — not an asking price. About 45% of the 56 units are sold. 2 complaints sit on the filing. Sai Siddhi Promoters and Builders is the promoter.

Stock image, not a photograph of Anshul Casa I-Building Stock image
Where
Wakad
pincode 411057
Sold here at
₹8,684
per sq ft, 25 registered sales
Available
3 BHK
2 left · 967 sq ft
Now due
Mar 2027
9 months later than first promised
A stock photograph, not Anshul Casa I-Building. We have no picture of this site yet.

Where this is

Wakad, PCMC, Pune, 411057

Village
Wakad
Taluka
Mulshi
Pincode
411057

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 56 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 28 units · none available

28 units 789 sq ft 73.28 sq m as filed

3 BHK 28 units · 2 available

14 units 967 sq ft 89.82 sq m as filed
14 units 1041 sq ft 96.74 sq m as filed
Units sold

25 / 56

Selling steadily

45% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 28 flats · none available

789 sq ft carpet as drawn

Carpet, filed
789 sq ft
Built-up
about 947 sq ft
Super built-up
about 1,105 sq ft
Every room in this flat

Living and dining about 230 sq ft, Master bedroom about 153 sq ft, Second bedroom about 123 sq ft, Kitchen about 92 sq ft, Bath about 54 sq ft, Balcony about 54 sq ft, Second bath about 46 sq ft, Passage about 38 sq ft.

3 BHK 28 flats · 2 available

967 sq ft carpet as drawn, from 967–1,041 sq ft filed in this configuration

Carpet, filed
967 sq ft
Built-up
about 1,160 sq ft
Super built-up
about 1,354 sq ft
Every room in this flat

Living and dining about 238 sq ft, Master bedroom about 159 sq ft, Second bedroom about 127 sq ft, Third bedroom about 103 sq ft, Kitchen about 95 sq ft, Bath about 55 sq ft, Balcony about 55 sq ft, Second bath about 48 sq ft, Passage about 48 sq ft, Third bath about 40 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹8,684 per sq ft of carpet, median of 25 registered sales
Range across those sales ₹7,777 to ₹16,914 per sq ft
Sold and booked 25 sold, 0 booked
Still available 2 flats, 789–1041 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jun 2026
Current status Due Mar 2027

Revised projection

The completion date has moved from June 2026 to March 2027, 9 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S. No. 226/1B, 226/1C/1,2,3, CTS No 2149 Part is the plot this project is built on, as filed
Revenue village Wakad
TalukaMulshi
Street, as filed Wakad
Bounded north by D P Road
Bounded east by S No 216
Bounded south by By Nisarg Srushti Society
Bounded west by By Part of S No 228 and Part of S No 226

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerSai Siddhi Promoters and Builders
Registered officeShop No 3, 1, Tukaram Complex, Vishal Nagar, Next To Ashoka Hotel, Pimple Nilakh, Pune 411027

Professionals named on the filing

Architect Fourth Dimension Architects Pvt.Ltd CA/95/18785
Engineer Virendra Nikhare
Chartered Accountant Sac & Co LLP 154711

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

2 cases against this project, 0 with an order on record, filed between Jul 2026 and Aug 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12604857 Aug 2026 No order on record
CC12604770 Jul 2026 No order on record

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

9 May 2022 is when an advocate last certified the title to this land
Title report Title Search Report Annexure.pdf 9 May 2022
Promoter's declaration, Form B Form B.pdf 9 May 2022

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100045525
Promoter Sai Siddhi Promoters and Builders
Project typeResidential / Group Housing · Building development
LocalityWakad — Mulshi taluka, pincode 411057
Applied on09 May 2022
Registered on24 May 2022
Completion, as first filed30 June 2026
Due31 March 2027 9 months later
Units declared56
Units sold 25 of 56 sold (45%), 31 still unsold
Complaints2 on record with MahaRERA
Certificate on file Extension certificate, issued 12 August 2026
Application referenceREA52100107945
Current statusActive
Record last changed 12 August 2026 · 2 months ago

Where the sold count comes from, and whether it holds up. 25 of 56 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 56 flats and reaches the same answer — 25 sold, every one with money recorded as received against a named flat, and 2 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 12 August 2026.

Common questions

Is Anshul Casa I-Building registered with MahaRERA?
Yes. It is registered as P52100045525, filed on 24 May 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Anshul Casa I-Building due to be handed over?
The promoter has told MahaRERA March 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Anshul Casa I-Building been delayed?
Yes. The first date filed was June 2026. It now stands at March 2027, 9 months later.
What did buyers actually pay in Anshul Casa I-Building?
A median of ₹8,684 per square foot of carpet, across 25 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Anshul Casa I-Building?
2 of 56 were still unsold at the promoter's last filing, in 3 BHK, from 967 sq ft of carpet.
Are there complaints against Anshul Casa I-Building?
2 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Anshul Casa I-Building?
Sai Siddhi Promoters and Builders, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 07 October 2026. The authority's own page for P52100045525 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Wakad

Stock image, not a photograph of Kings County Phase - I Stock image
Registered here
₹11,451
On offer
3, 4 BHK
Under construction

Kings County Phase - I

King'S Marque Group · Wakad

43 sold
Slipped 4 months
Due
Apr 2028
Units
152
Carpet
642–1,371
Sold at
₹1.2 crore
P52100055635
Stock image, not a photograph of Kohinoor Regalia Towers Stock image
Registered here
₹13,391
On offer
2, 3 BHK
Under construction

Kohinoor Regalia Towers

Godiva Buildcon Private Limited · Wakad

13 sold
Slipped 4 months
Due
Oct 2030
Units
148
Carpet
686–9,460
Sold at
₹1.3 crore
PR1260002500271