RERA registered P52100022864 Active
Green Mint
Sus, Pune · Residential / Group Housing by Sunil Vishwanath Salunke
Official record Updated from the register 10 October 2026. Anything filed since then is not here yet.
In short
Green Mint in Sus is MahaRERA-registered (P52100022864) and still under construction, with possession filed for December 2026. Buyers have already registered 22 sales here at a median ₹6,411 per sq ft of carpet — not an asking price. About 73% of the 30 units are sold. Sunil Vishwanath Salunke is the promoter.
- Sold here at
- ₹6,411
- per sq ft, 22 registered sales
- Available
- Shops
- 4 left · 187–250 sq ft
- Now due
- Dec 2026
- 3 years later than first promised
Where this is
Sus, PMRDA, Pune, 411021
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 30 units are filed unit by unit with the authority, the highest on floor 6. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 Room Kitchen 1 unit · all sold
2 BHK 16 units · all sold
3 BHK 5 units · all sold
Shops 8 units · 4 available
22 / 30
73% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 Room Kitchen 1 unit · none available
403 sq ft carpet as drawn
- Carpet, filed
- 403 sq ft
- Built-up
- about 484 sq ft
- Super built-up
- about 564 sq ft
Every room in this unit
Living and sleeping about 242 sq ft, Kitchen about 81 sq ft, Bath about 44 sq ft, Balcony about 36 sq ft.
2 BHK 16 units · none available
805 sq ft carpet as drawn, from 773–919 sq ft filed in this configuration
- Carpet, filed
- 805 sq ft
- Built-up
- about 966 sq ft
- Super built-up
- about 1,127 sq ft
Every room in this unit
Living and dining about 234 sq ft, Master bedroom about 156 sq ft, Second bedroom about 125 sq ft, Kitchen about 94 sq ft, Bath about 55 sq ft, Balcony about 55 sq ft, Second bath about 47 sq ft, Passage about 39 sq ft.
3 BHK 5 units · none available
948 sq ft carpet as drawn, from 919–948 sq ft filed in this configuration
- Carpet, filed
- 948 sq ft
- Built-up
- about 1,138 sq ft
- Super built-up
- about 1,327 sq ft
Every room in this unit
Living and dining about 233 sq ft, Master bedroom about 155 sq ft, Second bedroom about 124 sq ft, Third bedroom about 101 sq ft, Kitchen about 93 sq ft, Bath about 54 sq ft, Balcony about 54 sq ft, Second bath about 47 sq ft, Passage about 47 sq ft, Third bath about 39 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹5,712 to ₹8,283 per sq ft |
|---|---|
| Sold and booked | 22 sold, 0 booked |
| Still available | 4 units, 187–948 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2023 to December 2026, 3 years later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Sus |
|---|---|
| Taluka | Mulshi |
| Street, as filed | Pashan Sus Road |
| Bounded north by | Pashan Sus Road |
| Bounded east by | Internal Road |
| Bounded south by | Wing B of Green Promise Building |
| Bounded west by | S No 83 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Sunil Vishwanath Salunke |
|---|---|
| Registered office | A-13, Mont Vert -2, Sus Road, Near Reliance Fresh, Pashan, Pune 411021 |
Professionals named on the filing
| Architect | Manoj Tatooskar CA/91/13744 |
|---|---|
| Architect | Vinod and Associates |
| Engineer | Rahul Dhansheti |
| Engineer | Umesh Dhotre |
| Chartered Accountant | L G Shinde & Co. 131598 |
| Chartered Accountant | L G Shinde & Company |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Title Search Report.pdf | 18 October 2019 |
|---|---|
| Promoter's declaration, Form B Form B -.pdf | 26 February 2025 1 older version on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100022864 |
| Promoter | Sunil Vishwanath Salunke |
| Project type | Residential / Group Housing · Building development |
| Locality | Sus — Mulshi taluka, pincode 411021 |
| Applied on | 21 October 2019 |
| Registered on | 30 October 2019 |
| Completion, as first filed | 30 December 2023 |
| Due | 29 December 2026 3 years later |
| Units declared | 30 |
| Units sold | 22 of 30 sold (73%), 8 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 08 September 2021 |
| Application reference | REA52100063337 |
| Current status | Active |
| Record last changed | 11 August 2025 · 14 months ago |
Where the sold count comes from, and whether it holds up. 22 of 30 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 30 units and reaches the same answer — 22 sold, every one with money recorded as received against a named unit, and 4 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 11 August 2025.
Common questions
- Is Green Mint registered with MahaRERA?
- Yes. It is registered as P52100022864, filed on 30 October 2019, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Green Mint due to be handed over?
- The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Green Mint been delayed?
- Yes. The first date filed was December 2023. It now stands at December 2026, 3 years later.
- What did buyers actually pay in Green Mint?
- A median of ₹6,411 per square foot of carpet, across 22 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Green Mint?
- 4 of 30 were still unsold at the promoter's last filing, in Shops, from 187–250 sq ft of carpet.
- Are there complaints against Green Mint?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Green Mint?
- Sunil Vishwanath Salunke, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 10 October 2026. The authority's own page for P52100022864 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Sus
Stock image
- Registered here
- ₹6,789
- On offer
- 1 RK
- Due
- May 2028
- Units
- 145
- Carpet
- 184–241
- Sold at
- ₹16.2 lakh
Stock image
- Nearby
- ₹6,449–9,339
- On offer
- 1, 2, 3 BHK + shops
- Due
- Apr 2031
- Units
- 115
- Carpet
- 380–844
- Typical unit
- ~₹43.2 lakh
Stock image
- Nearby
- ₹10,253
- On offer
- 4 BHK
- Due
- Dec 2028
- Units
- 6
- Carpet
- 1,538
- Typical flat
- ~₹1.6 crore