RERA registered P52100006115 Active
Aarohi TB
Sus, Pune · Residential / Group Housing by Teirth Developers and Suyojit Infrastructure Ltd
Official record Updated from the register 12 September 2026. Anything filed since then is not here yet.
In short
Aarohi TB in Sus is MahaRERA-registered (P52100006115) and still under construction, with possession filed for December 2028. No sales are registered in this project yet. Units the same size elsewhere in Sus have registered at ₹10,253 per sq ft of carpet — the neighbourhood, not this building. About 33% of the 6 units are sold. Teirth Developers and Suyojit Infrastructure Ltd is the promoter.
- Nearby at
- ₹10,253
- per sq ft, same sizes in Sus
- Available
- 4 BHK
- 4 left · 1,538 sq ft
- Now due
- Dec 2028
- 7 years later than first promised
Where this is
Sus, PMRDA, Pune, 411021
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 6 flats are filed unit by unit with the authority, the highest on floor 2. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
4 BHK 6 units · 4 available
2 / 6
33% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
4 BHK 6 flats · 4 available
1,538 sq ft carpet as drawn, from 1,538–4,401 sq ft filed in this configuration
- Carpet, filed
- 1,538 sq ft
- Built-up
- about 1,846 sq ft
- Super built-up
- about 2,153 sq ft
Every room in this flat
Living and dining about 342 sq ft, Master bedroom about 228 sq ft, Second bedroom about 182 sq ft, Third bedroom about 148 sq ft, Kitchen about 137 sq ft, Fourth bedroom about 137 sq ft, Bath about 80 sq ft, Balcony about 80 sq ft, Passage about 80 sq ft, Second bath about 68 sq ft, Third bath about 57 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What flats like these cost nearby
No sale has been registered at Aarohi TB yet. 2 agreements have been filed, which is too few to divide into a rate anyone should act on.
| On sale here | Registered in Sus | Which for this size is |
|---|---|---|
| 4 BHK 1,538–4,401 sq ft | ₹10,253/sq ft 33 sales, 3 projects | ₹1.6 crore–₹4.5 crore middle half ₹8,810–11,437/sq ft |
Each rate is what buyers contracted to pay for the same configuration in Sus, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Sus.
The state values these at ₹5,184 per sq ft of carpet — one rate across all 4 still available, which values each of them at ₹79.7 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Revised projection
The completion date has moved from December 2021 to December 2028, 7 years later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Sus |
|---|---|
| Taluka | Mulshi |
| Street, as filed | SUS |
| Bounded north by | Survey No 127 |
| Bounded east by | Remaining Land of Survey no 123 |
| Bounded south by | Survey No 124 |
| Bounded west by | Survey No 136 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Teirth Developers and Suyojit Infrastructure Ltd |
|---|---|
| Registered office | 102, Sai Empire, Baner Road, Near Icici Bank, Baner, Pune 411021 |
Professionals named on the filing
| Architect | Amiet Naik 1053/03 |
|---|---|
| Engineer | Pramod Bansilal Gandhi |
| Engineer | Suhas Joshi |
| Chartered Accountant | JSU Associates 166880 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report SERCH,TITLE REPORT -TDSI (JV).pdf | 31 July 2017 |
|---|---|
| Promoter's declaration, Form B TDSI(JV) -31 Dec -2020-min.pdf | 31 July 2017 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100006115 |
| Promoter | Teirth Developers and Suyojit Infrastructure Ltd |
| Project type | Residential / Group Housing · Building development |
| Locality | Sus — Mulshi taluka, pincode 411021 |
| Applied on | 31 July 2017 |
| Registered on | 14 August 2017 |
| Completion, as first filed | 30 December 2021 |
| Due | 31 December 2028 7 years later |
| Units declared | 6 |
| Units sold | 2 of 6 sold (33%), 4 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 12 August 2026 |
| Application reference | REA52100017687 |
| Current status | Active |
| Record last changed | 12 August 2026 · 33 days ago |
Where the sold count comes from, and whether it holds up. 2 of 6 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 6 flats and reaches the same answer — 2 sold, 1 of them with money recorded as received against a named flat, and 4 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 12 August 2026.
Common questions
- Is Aarohi TB registered with MahaRERA?
- Yes. It is registered as P52100006115, filed on 14 August 2017, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Aarohi TB due to be handed over?
- The promoter has told MahaRERA December 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Aarohi TB been delayed?
- Yes. The first date filed was December 2021. It now stands at December 2028, 7 years later.
- What does a flat in Aarohi TB cost?
- Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Sus have registered at ₹10,253 per square foot of carpet — the neighbourhood, not this building.
- How many flats are left in Aarohi TB?
- 4 of 6 were still unsold at the promoter's last filing, in 4 BHK, from 1,538 sq ft of carpet.
- Are there complaints against Aarohi TB?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Aarohi TB?
- Teirth Developers and Suyojit Infrastructure Ltd, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 12 September 2026. The authority's own page for P52100006115 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Sus
Stock image
- Registered here
- ₹9,391
- On offer
- 2, 3 BHK
- Due
- Dec 2027
- Units
- 84
- Carpet
- 948–1,166
- Sold at
- ₹1 crore
Stock image
- Registered here
- ₹9,524
- On offer
- 2, 3 BHK
- Due
- Dec 2027
- Units
- 84
- Carpet
- 948–1,166
- Sold at
- ₹1 crore
Stock image
- Registered here
- ₹8,343
- On offer
- 1, 2 BHK
- Due
- Jun 2030
- Units
- 193
- Carpet
- 492–807
- Sold at
- ₹65.8 lakh