In short

Kumar Palmcrest A6 in Pisoli is MahaRERA-registered (P52100081089) and still under construction, with possession filed for July 2029. No sales are registered in this project yet. Units the same size elsewhere in Pisoli have registered at ₹6,977 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. Kumar Properties And Promoters Private Limited is the promoter.

Stock image, not a photograph of Kumar Palmcrest A6 Stock image
Where
Pisoli
pincode 411048
Nearby at
₹6,977
per sq ft, same sizes in Pisoli
Available
2 BHK
65 left · 780 sq ft
Now due
Jul 2029
4 months later than first promised
A stock photograph, not Kumar Palmcrest A6. We have no picture of this site yet.

Where this is

Pisoli, PMC, Pune, 411048

Village
Pisoli
Taluka
Haveli
Pincode
411048

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 65 flats are filed unit by unit with the authority, the highest on floor 11. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 65 units · all available

65 units 780 sq ft 72.48 sq m as filed
Units sold

0 / 65

Pre-launch / early phase

0% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 65 flats · 65 available

780 sq ft carpet as drawn

Carpet, filed
780 sq ft
Built-up
about 936 sq ft
Super built-up
about 1,092 sq ft
Every room in this flat

Living and dining about 227 sq ft, Master bedroom about 151 sq ft, Second bedroom about 121 sq ft, Kitchen about 91 sq ft, Bath about 53 sq ft, Balcony about 53 sq ft, Second bath about 45 sq ft, Passage about 38 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What flats like these cost nearby

No sale has been registered at Kumar Palmcrest A6 yet. The promoter has filed no agreement values, so nothing below is this project's own price.

₹6,977 per sq ft of carpet, median of 629 registered sales of the same configuration in Pisoli
On sale here Registered in Pisoli Which for this size is
2 BHK 780 sq ft ₹6,977/sq ft 629 sales, 10 projects ₹54.4 lakh middle half ₹5,648–7,399/sq ft

Each rate is what buyers contracted to pay for the same configuration in Pisoli, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Pisoli.

The state values these at ₹5,146 per sq ft of carpet — one rate across all 65 still available, which values each of them at ₹40.1 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Timeline audit

Original proposed Mar 2029
Current status Due Jul 2029

Revised projection

The completion date has moved from March 2029 to July 2029, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

32/8/1 32/8/2 32/5B/1 is the plot this project is built on, as filed
Revenue village Pisoli
TalukaHaveli
Street, as filed VIR SAVARKAR ROAD
Bounded north by SIDE MARGINE AND ADJ S NO 32 HISSA NO 5A
Bounded east by SIDE MARGINE AND ADJ S NO 32 HISSA NO 5A
Bounded south by ADJ BUILDING A5
Bounded west by SIDE MARGINE AND ADJ S NO 32 HISSA NO 5A

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerKumar Properties And Promoters Private Limited
Registered office2413, Kumar Capital, East Street, Pool Gate, Camp, Pune 411001

Professionals named on the filing

Architect Mangesh Gotal CA/2005/36501
Architect Parvez Jamadar 356
Architect Sameer Valimbe CA/92/14618
Engineer Abhijeet Shekhar
Engineer Mr Abhijeet Shekhar
Chartered Accountant Spak & Co. 172292
Chartered Accountant Supriya Abhijit Mundada 156545
Chartered Accountant Supriya Abhijit Mundada 156545
Chartered Accountant Supriya Abhijit Mundada 156545

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

22 January 2026 is when an advocate last certified the title to this land
Title report organized (5)_compressed.pdf 22 January 2026
Promoter's declaration, Form B Affidavit cum Declaration.PDF 6 February 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100081089
Promoter Kumar Properties And Promoters Private Limited
Project typeResidential / Group Housing · Building development
LocalityPisoli — Haveli taluka, pincode 411048
Applied on13 February 2025
Registered on30 January 2026
Completion, as first filed31 March 2029
Due31 July 2029 4 months later
Units declared65
Units sold None sold yet, all 65 on the market
Complaints0 on record with MahaRERA
Application referenceREA52100167862
Current statusActive
Record last changed 30 January 2026 · 8 months ago

Nothing has sold yet. The promoter's quarterly progress report says none of the 65 flats are gone, and the unit-by-unit list they file separately says the same: all 65 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 30 January 2026.

Common questions

Is Kumar Palmcrest A6 registered with MahaRERA?
Yes. It is registered as P52100081089, filed on 30 January 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Kumar Palmcrest A6 due to be handed over?
The promoter has told MahaRERA July 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Kumar Palmcrest A6 been delayed?
Yes. The first date filed was March 2029. It now stands at July 2029, 4 months later.
What does a flat in Kumar Palmcrest A6 cost?
Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Pisoli have registered at ₹6,977 per square foot of carpet — the neighbourhood, not this building.
How many flats are left in Kumar Palmcrest A6?
65 of 65 were still unsold at the promoter's last filing, in 2 BHK, from 780 sq ft of carpet.
Are there complaints against Kumar Palmcrest A6?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Kumar Palmcrest A6?
Kumar Properties And Promoters Private Limited, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100081089 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Pisoli