Aapla Ghar Moshi Annex Phase I

Kharabwadi, Pune · Residential / Group Housing by Maple Shelters Pvt. Ltd.

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Aapla Ghar Moshi Annex Phase I in Kharabwadi is MahaRERA-registered (P52100002998) and still under construction, with possession filed for December 2027. Buyers have already registered 260 sales here at a median ₹4,763 per sq ft of carpet — not an asking price. About 95% of the 296 units are sold. 6 complaints sit on the filing. Maple Shelters Pvt. Ltd. is the promoter.

Stock image, not a photograph of Aapla Ghar Moshi Annex Phase I Stock image
Where
Kharabwadi
pincode 410501
Sold here at
₹4,763
per sq ft, 260 registered sales
Available
1, 2 BHK
16 left · 234–426 sq ft
Now due
Dec 2027
4 years later than first promised
A stock photograph, not Aapla Ghar Moshi Annex Phase I. We have no picture of this site yet.

Where this is

Kharabwadi, PMRDA, Pune, 410501

Village
Kharabwadi (CT)
Taluka
Khed
Pincode
410501
Coordinates
18.736983, 73.796021

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 296 units are filed unit by unit with the authority, the highest on floor 11. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 216 units · 4 available

152 units 234 sq ft 21.74 sq m as filed
24 units 346 sq ft 32.14 sq m as filed
24 units 350 sq ft 32.51 sq m as filed
8 units 356 sq ft 33.08 sq m as filed
8 units 361 sq ft 33.52 sq m as filed

2 BHK 60 units · 12 available

44 units 426 sq ft 39.58 sq m as filed
8 units 616 sq ft 57.19 sq m as filed
8 units 630 sq ft 58.52 sq m as filed

Shops 20 units · all sold

6 units 737 sq ft 68.46 sq m as filed
6 units 767 sq ft 71.26 sq m as filed
6 units 802 sq ft 74.49 sq m as filed
2 units 1097 sq ft 101.94 sq m as filed
Units sold

280 / 296

Nearly sold out

95% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

1 BHK 216 units · 4 available

234 sq ft carpet as drawn, from 234–361 sq ft filed in this configuration

Carpet, filed
234 sq ft
Built-up
about 281 sq ft
Super built-up
about 328 sq ft
Every room in this unit

Living and dining about 88 sq ft, Master bedroom about 58 sq ft, Kitchen about 35 sq ft, Bath about 20 sq ft, Balcony about 20 sq ft, Passage about 12 sq ft.

2 BHK 60 units · 12 available

426 sq ft carpet as drawn, from 426–630 sq ft filed in this configuration

Carpet, filed
426 sq ft
Built-up
about 511 sq ft
Super built-up
about 596 sq ft
Every room in this unit

Living and dining about 124 sq ft, Master bedroom about 83 sq ft, Second bedroom about 66 sq ft, Kitchen about 50 sq ft, Bath about 29 sq ft, Balcony about 29 sq ft, Second bath about 25 sq ft, Passage about 21 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹4,763 per sq ft of carpet, median of 260 registered sales
Range across those sales ₹3,180 to ₹5,781 per sq ft
Sold and booked 279 sold, 1 booked
Still available 16 units, 234–1097 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

20 further sales are set aside. They divide out beyond ₹11,907 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.

Timeline audit

Original proposed Dec 2023
Current status Due Dec 2027

Revised projection

The completion date has moved from December 2023 to December 2027, 4 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

184 and others is the plot this project is built on, as filed
Revenue village Kharabwadi (CT) · shown on this site as Kharabwadi
TalukaKhed
Street, as filed Kharabwadi
Bounded north by Adjacent Plot A and B
Bounded east by Ramaning part of Gat No 184 and others
Bounded south by Internal Road
Bounded west by remaining part of 184 and others and RP road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerMaple Shelters Pvt. Ltd.
Registered office702 7th Floor, Bhamburda, City Square, University Road, Behind The Pride Hotel, Shivajinagar, Pune 411005

Professionals named on the filing

Architect Jay aeram Architectural and interior consultant 15811
Architect Jay aeram Architectural and interior consultant 15811
Architect Jay aeram Architectural and interior consultant 15811
Architect Jay aeram Architectural and interior consultant 15811
Engineer Rajesh Chaudhari
Chartered Accountant Agrawal Oswal & Associates 197137
Chartered Accountant Shweta Agrawal 180701

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

6 cases against this project, 6 with an order on record, filed between May 2019 and Jun 2021. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC005000000085660 Jun 2021 Order passed Jun 2021
CC005000000085536 May 2021 Order passed May 2021
CC005000000033605 Nov 2019 Order passed Nov 2019
CC005000000022856 May 2019 Order passed May 2019
CC005000000022991 May 2019 Order passed May 2019
CC005000000022992 May 2019 Order passed May 2019

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

28 July 2017 is when an advocate last certified the title to this land
Title report Athavale 1.pdf 28 July 2017 3 older versions on file
Promoter's declaration, Form B Form B 04032024.pdf 4 March 2024 2 older versions on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100002998
Promoter Maple Shelters Pvt. Ltd.
Project typeResidential / Group Housing · Building development
LocalityKharabwadi — Khed taluka, pincode 410501
Applied on29 July 2017
Registered on04 August 2017
Completion, as first filed30 December 2023
Due31 December 2027 4 years later
Units declared296
Units sold 280 of 296 sold (95%), 16 still unsold
Complaints6 on record with MahaRERA
Certificate on file Original registration certificate, issued 10 September 2021
Application referenceREA52100011928
Current statusActive
Record last changed 18 March 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 280 of 296 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 296 units and reaches the same answer — 279 sold, 275 of them with money recorded as received against a named unit, 1 booked with a price agreed but nothing received yet, and 16 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 18 March 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Aapla Ghar Moshi Annex Phase I registered with MahaRERA?
Yes. It is registered as P52100002998, filed on 04 August 2017, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Aapla Ghar Moshi Annex Phase I due to be handed over?
The promoter has told MahaRERA December 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Aapla Ghar Moshi Annex Phase I been delayed?
Yes. The first date filed was December 2023. It now stands at December 2027, 4 years later.
What did buyers actually pay in Aapla Ghar Moshi Annex Phase I?
A median of ₹4,763 per square foot of carpet, across 260 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Aapla Ghar Moshi Annex Phase I?
16 of 296 were still unsold at the promoter's last filing, in 1, 2 BHK, from 234–426 sq ft of carpet.
Are there complaints against Aapla Ghar Moshi Annex Phase I?
6 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Aapla Ghar Moshi Annex Phase I?
Maple Shelters Pvt. Ltd., as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100002998 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Kharabwadi

Stock image, not a photograph of Ghanwat Icon Stock image
Valued from
₹4,129
On offer
Hall + shops
Under construction

Ghanwat Icon

Shivam Developers Pvt Ltd · Kharabwadi

3 sold
Due
Dec 2027
Units
39
Carpet
108–3,964
Typical unit
~₹12.3 lakh
P52100080877