Life Republic Sector R22/22nd Avenue - Atmos/Phase-II in Jambe is MahaRERA-registered (P52100056082) and still under construction, with possession filed for April 2029. Buyers have already registered 443 sales here at a median ₹9,894 per sq ft of carpet — not an asking price. About 92% of the 483 units are sold. 1 complaint sits on the filing. Kolte-Patil Developers Limited is the promoter.

Stock image, not a photograph of Life Republic Sector R22/22nd Avenue - Atmos/Phase-II Stock image
Where
Jambe
pincode 411057
Sold here at
₹9,894
per sq ft, 443 registered sales
Available
2, 3 BHK
40 left · 669–945 sq ft
Now due
Apr 2029
4 months later than first promised
A stock photograph, not Life Republic Sector R22/22nd Avenue - Atmos/Phase-II. We have no picture of this site yet.

Where this is

Jambe, PMRDA, Pune, 411057

Street map of Jambe centred on the coordinate filed for Life Republic Sector R22/22nd Avenue - Atmos/Phase-II, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Jambe
Taluka
Mulshi
Pincode
411057
Coordinates
18.636996, 73.724288

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 483 flats are filed unit by unit with the authority, the highest on floor 22. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 209 units · 8 available

54 units 682 sq ft 63.37 sq m as filed
76 units 687 sq ft 63.86 sq m as filed
19 units 697 sq ft 64.71 sq m as filed
38 units 707 sq ft 65.67 sq m as filed
22 units 909 sq ft 84.41 sq m as filed

3 BHK 229 units · 31 available

80 units 669 sq ft 62.15 sq m as filed
42 units 906 sq ft 84.19 sq m as filed
45 units 923 sq ft 85.76–85.77 sq m as filed
22 units 927 sq ft 86.11 sq m as filed
21 units 933 sq ft 86.66 sq m as filed
16 units 934 sq ft 86.76 sq m as filed
3 units 945 sq ft 87.75 sq m as filed

Configuration not filed 45 units · 1 available

20 units 822 sq ft 76.32 sq m as filed
19 units 835 sq ft 77.62 sq m as filed
3 units 911 sq ft 84.66 sq m as filed
3 units 930 sq ft 86.36 sq m as filed
Units sold

443 / 483

Nearly sold out

92% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 209 flats · 8 available

687 sq ft carpet as drawn, from 682–909 sq ft filed in this configuration

Carpet, filed
687 sq ft
Built-up
about 824 sq ft
Super built-up
about 962 sq ft
Every room in this flat

Living and dining about 200 sq ft, Master bedroom about 133 sq ft, Second bedroom about 107 sq ft, Kitchen about 80 sq ft, Bath about 47 sq ft, Balcony about 47 sq ft, Second bath about 40 sq ft, Passage about 33 sq ft.

3 BHK 229 flats · 31 available

669 sq ft carpet as drawn, from 669–945 sq ft filed in this configuration

Carpet, filed
669 sq ft
Built-up
about 803 sq ft
Super built-up
about 937 sq ft
Every room in this flat

Living and dining about 165 sq ft, Master bedroom about 110 sq ft, Second bedroom about 88 sq ft, Third bedroom about 71 sq ft, Kitchen about 66 sq ft, Bath about 38 sq ft, Balcony about 38 sq ft, Second bath about 33 sq ft, Passage about 33 sq ft, Third bath about 27 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹9,894 per sq ft of carpet, median of 443 registered sales
Range across those sales ₹9,041 to ₹11,106 per sq ft
Sold and booked 325 sold, 118 booked
Still available 40 flats, 669–945 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2028
Current status Due Apr 2029

Revised projection

The completion date has moved from December 2028 to April 2029, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

101 Parts, 100/2 Parts, 100/1/1 Parts, 99/1/2 Parts is the plot this project is built on, as filed
Revenue village Jambe
TalukaMulshi
Street, as filed Jambe
Bounded north by Township Boundary and irrigation canal
Bounded east by Township Boundary SNo 99parts 30Mtr DP RD canal
Bounded south by Township Boundary and S No 101 Part
Bounded west by Township Boundary S No 103 Part

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerKolte-Patil Developers Limited
Registered office7th Floor And 8th Floor, Cts No. 14 (P), City Bay, Dhole Patil Road, 17 Boat Club Road, Pune 411001

Professionals named on the filing

Architect Kolhatkar and Gowaikar CA/1986/09890
Engineer Gaurag Joshi
Engineer JW Consultant LLP
Engineer Prashant Shete
Chartered Accountant CA Vidhi S Shah & Associates 604690

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
SM12600083 Jan 2026 Order passed Jan 2026

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

25 April 2024 is when an advocate last certified the title to this land
Title report Title revise R22 phase 2_compressed.pdf 25 April 2024
Promoter's declaration, Form B Form B.pdf 4 April 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100056082
Promoter Kolte-Patil Developers Limited
Project typeResidential / Group Housing · Building development
LocalityJambe — Mulshi taluka, pincode 411057
Applied on10 April 2024
Registered on10 May 2024
Completion, as first filed31 December 2028
Due30 April 2029 4 months later
Units declared483
Units sold 443 of 483 sold (92%), 40 still unsold
Complaints1 on record with MahaRERA
Certificate on file Corrected certificate, issued 06 February 2026
Application referenceREA52100157109
Current statusActive
Record last changed 10 May 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 443 of 483 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 483 flats and reaches the same answer — 325 sold, every one with money recorded as received against a named flat, 118 booked with a price agreed but nothing received yet, and 40 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 10 May 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Life Republic Sector R22/22nd Avenue - Atmos/Phase-II registered with MahaRERA?
Yes. It is registered as P52100056082, filed on 10 May 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Life Republic Sector R22/22nd Avenue - Atmos/Phase-II due to be handed over?
The promoter has told MahaRERA April 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Life Republic Sector R22/22nd Avenue - Atmos/Phase-II been delayed?
Yes. The first date filed was December 2028. It now stands at April 2029, 4 months later.
What did buyers actually pay in Life Republic Sector R22/22nd Avenue - Atmos/Phase-II?
A median of ₹9,894 per square foot of carpet, across 443 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Life Republic Sector R22/22nd Avenue - Atmos/Phase-II?
40 of 483 were still unsold at the promoter's last filing, in 2, 3 BHK, from 669–945 sq ft of carpet.
Are there complaints against Life Republic Sector R22/22nd Avenue - Atmos/Phase-II?
1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Life Republic Sector R22/22nd Avenue - Atmos/Phase-II?
Kolte-Patil Developers Limited, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100056082 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Jambe