RERA registered P52100052969 Active
Skyi Iris, RaceCourse Phase I
Wanowrie, Pune · Residential / Group Housing by Enerrgia Skyi Landmarks
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Skyi Iris, RaceCourse Phase I in Wanowrie is MahaRERA-registered (P52100052969) and still under construction, with possession filed for October 2027. No sales are registered in this project yet. Units the same size elsewhere in Wanowrie have registered at ₹14,363 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. Enerrgia Skyi Landmarks is the promoter.
- Nearby at
- ₹14,363
- per sq ft, same sizes in Wanowrie
- Available
- 3 BHK
- 40 left · 952 sq ft
- Now due
- Oct 2027
- 4 months later than first promised
Where this is
Wanowrie, PMC, Pune, 411040
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 40 flats are filed unit by unit with the authority, the highest on floor 10. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
3 BHK 40 units · all available
0 / 40
0% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
3 BHK 40 flats · 40 available
952 sq ft carpet as drawn
- Carpet, filed
- 952 sq ft
- Built-up
- about 1,142 sq ft
- Super built-up
- about 1,333 sq ft
Every room in this flat
Living and dining about 234 sq ft, Master bedroom about 156 sq ft, Second bedroom about 125 sq ft, Third bedroom about 101 sq ft, Kitchen about 94 sq ft, Bath about 55 sq ft, Balcony about 55 sq ft, Second bath about 47 sq ft, Passage about 47 sq ft, Third bath about 39 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What flats like these cost nearby
No sale has been registered at Skyi Iris, RaceCourse Phase I yet. The promoter has filed no agreement values, so nothing below is this project's own price.
| On sale here | Registered in Wanowrie | Which for this size is |
|---|---|---|
| 3 BHK 952 sq ft | ₹14,363/sq ft 136 sales, 9 projects | ₹1.4 crore middle half ₹11,197–17,604/sq ft |
Each rate is what buyers contracted to pay for the same configuration in Wanowrie, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Wanowrie.
The state values these at ₹11,731 per sq ft of carpet — one rate across all 40 still available, which puts the smallest at ₹1.1 crore and the largest at ₹1.1 crore. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Revised projection
The completion date has moved from June 2027 to October 2027, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | wanwadi · shown on this site as Wanowrie |
|---|---|
| Taluka | Haveli |
| Street, as filed | Wanawadi |
| Bounded north by | CTS No 938 |
| Bounded east by | CTS No 936 |
| Bounded south by | adjacent CTS no |
| Bounded west by | Road |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Enerrgia Skyi Landmarks |
|---|---|
| Registered office | Office No 102, Survey 274/1, Skyi Songbirds, Four Season Road, Behind Daulat Lawns, Bhugaon, Pune 412115 |
Professionals named on the filing
| Architect | ANA Consortium Pvt Ltd |
|---|---|
| Architect | Dhananjay S Deshmukh CA/2013/58471 |
| Architect | Spcm & Associates 12682 |
| Engineer | Sandeep Rangdal & Asso |
| Engineer | Sandip Rangdal & Assoociates |
| Chartered Accountant | A S Jinturkar & Co 163038 |
| Chartered Accountant | R V Porval and Associates |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Legal Title Report.pdf | 12 September 2023 |
|---|---|
| Promoter's declaration, Form B Promoter Declaration.pdf | 15 September 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100052969 |
| Promoter | Enerrgia Skyi Landmarks |
| Project type | Residential / Group Housing · Building development |
| Locality | Wanowrie — Haveli taluka, pincode 411040 |
| Applied on | 20 September 2023 |
| Registered on | 06 October 2023 |
| Completion, as first filed | 30 June 2027 |
| Due | 30 October 2027 4 months later |
| Units declared | 40 |
| Units sold | None sold yet, all 40 on the market |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 30 November 2023 |
| Application reference | REA52100146773 |
| Current status | Active |
| Record last changed | 17 November 2023 · over 2 years ago 2 years untouched |
Nothing has sold yet. The promoter's quarterly progress report says none of the 40 flats are gone, and the unit-by-unit list they file separately says the same: all 40 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 17 November 2023.
MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.
Common questions
- Is Skyi Iris, RaceCourse Phase I registered with MahaRERA?
- Yes. It is registered as P52100052969, filed on 06 October 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Skyi Iris, RaceCourse Phase I due to be handed over?
- The promoter has told MahaRERA October 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Skyi Iris, RaceCourse Phase I been delayed?
- Yes. The first date filed was June 2027. It now stands at October 2027, 4 months later.
- What does a flat in Skyi Iris, RaceCourse Phase I cost?
- Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Wanowrie have registered at ₹14,363 per square foot of carpet — the neighbourhood, not this building.
- How many flats are left in Skyi Iris, RaceCourse Phase I?
- 40 of 40 were still unsold at the promoter's last filing, in 3 BHK, from 952 sq ft of carpet.
- Are there complaints against Skyi Iris, RaceCourse Phase I?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Skyi Iris, RaceCourse Phase I?
- Enerrgia Skyi Landmarks, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100052969 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Wanowrie
Stock image
- Registered here
- ₹10,246
- On offer
- 1, 2, 3 BHK
- Due
- Jun 2027
- Units
- 116
- Carpet
- 463–1,101
- Sold at
- ₹76 lakh
Stock image
- Registered here
- ₹11,072
- On offer
- 2, 3 BHK
- Due
- Jan 2028
- Units
- 72
- Carpet
- 799–1,180
- Sold at
- ₹1 crore
Stock image
- Nearby
- ₹10,523–14,363
- On offer
- 1, 2, 3 BHK
- Due
- Oct 2029
- Units
- 22
- Carpet
- 660–1,175
- Typical flat
- ~₹1.1 crore