Z Zomefy

RERA registered P52100004947 Active

Kshrugal Buildcon

Wanowrie, Pune · Residential / Group Housing by Kuldip Ramesh Baagwe

Official record Updated from the register 10 October 2026. Anything filed since then is not here yet.

In short

Kshrugal Buildcon in Wanowrie is MahaRERA-registered (P52100004947) and still under construction, with possession filed for August 2027. Buyers have already registered 8 sales here at a median ₹9,580 per sq ft of carpet — not an asking price. About 89% of the 9 units are sold. Kuldip Ramesh Baagwe is the promoter.

Stock image, not a photograph of Kshrugal Buildcon Stock image
Where
Wanowrie
pincode 411040
Sold here at
₹9,580
per sq ft, 8 registered sales
Available
2 BHK
1 left · 597 sq ft
Now due
Aug 2027
6.7 years later than first promised
A stock photograph, not Kshrugal Buildcon. We have no picture of this site yet.

Where this is

Wanowrie, PMC, Pune, 411040

Village
wanwadi
Taluka
Haveli
Pincode
411040
Coordinates
18.510857, 73.901673

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 9 flats are filed unit by unit with the authority, the highest on floor 3. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 9 units · 1 available

1 unit 596 sq ft 55.37 sq m as filed
1 unit 597 sq ft 55.46 sq m as filed
1 unit 602 sq ft 55.93 sq m as filed
3 units 614 sq ft 57.04 sq m as filed
1 unit 615 sq ft 57.14 sq m as filed
1 unit 639 sq ft 59.37 sq m as filed
1 unit 642 sq ft 59.64 sq m as filed
Units sold

8 / 9

Nearly sold out

89% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 9 flats · 1 available

614 sq ft carpet as drawn, from 596–642 sq ft filed in this configuration

Carpet, filed
614 sq ft
Built-up
about 737 sq ft
Super built-up
about 860 sq ft
Every room in this flat

Living and dining about 179 sq ft, Master bedroom about 119 sq ft, Second bedroom about 95 sq ft, Kitchen about 72 sq ft, Bath about 42 sq ft, Balcony about 42 sq ft, Second bath about 36 sq ft, Passage about 30 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹9,580 per sq ft of carpet, median of 8 registered sales
Range across those sales ₹7,902 to ₹10,987 per sq ft
Sold and booked 6 sold, 2 booked
Still available 1 flat, 596–642 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2020
Current status Due Aug 2027

Revised projection

The completion date has moved from December 2020 to August 2027, 6.7 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

995 is the plot this project is built on, as filed
Revenue village wanwadi · shown on this site as Wanowrie
TalukaHaveli
Street, as filed WANOWRIE
Bounded north by 37
Bounded east by 18
Bounded south by 37
Bounded west by 21

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerKuldip Ramesh Baagwe
Registered office402, 00, Orchid, Camp Road, Nearquater Gate Pumdjee Park, New Nana Peth, Pune 411002

Professionals named on the filing

Architect Nisar Pathan CA/92/15310
Engineer Aqueel MH
Chartered Accountant Dilip Jain 108309
Chartered Accountant Jatin Oswal 177189
Chartered Accountant Mahavir Parakh 141288

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

29 July 2017 is when an advocate last certified the title to this land
Title report Title Search Report compressed.pdf 29 July 2017
Promoter's declaration, Form B Form B.pdf 29 July 2017

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100004947
Promoter Kuldip Ramesh Baagwe
Project typeResidential / Group Housing · Building development
LocalityWanowrie — Haveli taluka, pincode 411040
Applied on31 July 2017
Registered on09 August 2017
Completion, as first filed05 December 2020
Due15 August 2027 6.7 years later
Units declared9
Units sold 8 of 9 sold (89%), 1 still unsold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 18 August 2026
Application referenceREA52100015846
Current statusActive
Record last changed 18 August 2026 · 2 months ago

Where the sold count comes from, and whether it holds up. 8 of 9 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 9 flats and reaches the same answer — 6 sold, every one with money recorded as received against a named flat, 2 booked with a price agreed but nothing received yet, and 1 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 18 August 2026.

Common questions

Is Kshrugal Buildcon registered with MahaRERA?
Yes. It is registered as P52100004947, filed on 09 August 2017, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Kshrugal Buildcon due to be handed over?
The promoter has told MahaRERA August 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Kshrugal Buildcon been delayed?
Yes. The first date filed was December 2020. It now stands at August 2027, 6.7 years later.
What did buyers actually pay in Kshrugal Buildcon?
A median of ₹9,580 per square foot of carpet, across 8 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Kshrugal Buildcon?
1 of 9 were still unsold at the promoter's last filing, in 2 BHK, from 597 sq ft of carpet.
Are there complaints against Kshrugal Buildcon?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Kshrugal Buildcon?
Kuldip Ramesh Baagwe, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 10 October 2026. The authority's own page for P52100004947 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Wanowrie

Stock image, not a photograph of Empress Greens Stock image
Nearby
₹14,363–16,575
On offer
3, 4 BHK
Under construction

Empress Greens

Anand Landmarks · Wanowrie

0 sold

1 complaint

Slipped 4.2 years
Due
Jun 2030
Units
24
Carpet
1,098–1,398
Typical flat
~₹1.9 crore
P52100051728
Stock image, not a photograph of Gold Crest Stock image
Nearby
₹10,435–14,363
On offer
2, 3 BHK
Under construction

Gold Crest

Golden Magnum · Wanowrie

0 sold
Slipped 4 months
Due
Apr 2027
Units
26
Carpet
818–1,272
Typical flat
~₹1.6 crore
P52100053975