RERA registered P52100078873 Active
Nyati Elenor
Wanowrie, Pune · Others by Nyati Builders Private Limited
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Nyati Elenor in Wanowrie is MahaRERA-registered (P52100078873) and still under construction, with possession filed for February 2030. Buyers have already registered 99 sales here at a median ₹16,563 per sq ft of carpet — not an asking price. 4 complaints sit on the filing. Nyati Builders Private Limited is the promoter.
- Sold here at
- ₹16,563
- per sq ft, 99 registered sales
- Available
- 1 BHK, 3 BHK, 4 BHK, 5 BHK, Duplex
- 150 left · 1,520–3,586 sq ft
- Now due
- Feb 2030
- 4 months later than first promised
Where this is
Wanowrie, Pune, 411040
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 256 units are filed unit by unit with the authority, the highest on floor 32. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 1 unit · all available
3 BHK 132 units · 92 available
1 unit has no usable carpet area on file, so it is counted above but not drawn.
4 BHK 104 units · 48 available
5 BHK 7 units · all available
Duplex 6 units · 2 available
Shops 6 units · all sold
10 / 256
4% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 4 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 1 unit · 1 available
1,631 sq ft carpet as drawn
- Carpet, filed
- 1,631 sq ft
- Built-up
- about 1,957 sq ft
- Super built-up
- about 2,283 sq ft
Every room in this unit
Living and dining about 612 sq ft, Master bedroom about 408 sq ft, Kitchen about 245 sq ft, Bath about 143 sq ft, Balcony about 143 sq ft, Passage about 82 sq ft.
3 BHK 132 units · 92 available
1,521 sq ft carpet as drawn, from 1,520–2,015 sq ft filed in this configuration
- Carpet, filed
- 1,521 sq ft
- Built-up
- about 1,825 sq ft
- Super built-up
- about 2,129 sq ft
Every room in this unit
Living and dining about 374 sq ft, Master bedroom about 249 sq ft, Second bedroom about 199 sq ft, Third bedroom about 162 sq ft, Kitchen about 150 sq ft, Bath about 87 sq ft, Balcony about 87 sq ft, Second bath about 75 sq ft, Passage about 75 sq ft, Third bath about 62 sq ft.
4 BHK 104 units · 48 available
2,045 sq ft carpet as drawn, from 2,045–2,424 sq ft filed in this configuration
- Carpet, filed
- 2,045 sq ft
- Built-up
- about 2,454 sq ft
- Super built-up
- about 2,863 sq ft
Every room in this unit
Living and dining about 454 sq ft, Master bedroom about 303 sq ft, Second bedroom about 242 sq ft, Third bedroom about 197 sq ft, Kitchen about 182 sq ft, Fourth bedroom about 182 sq ft, Bath about 106 sq ft, Balcony about 106 sq ft, Passage about 106 sq ft, Second bath about 91 sq ft, Third bath about 76 sq ft.
5 BHK 7 units · 7 available
2,453 sq ft carpet as drawn, from 2,453–2,463 sq ft filed in this configuration
- Carpet, filed
- 2,453 sq ft
- Built-up
- about 2,944 sq ft
- Super built-up
- about 3,434 sq ft
Every room in this unit
Living and dining about 501 sq ft, Master bedroom about 334 sq ft, Second bedroom about 267 sq ft, Third bedroom about 217 sq ft, Kitchen about 200 sq ft, Fourth bedroom about 200 sq ft, Fifth bedroom about 184 sq ft, Passage about 133 sq ft, Bath about 117 sq ft, Balcony about 117 sq ft, Second bath about 100 sq ft, Third bath about 83 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹14,316 to ₹23,692 per sq ft |
|---|---|
| Sold and booked | 55 sold, 51 booked |
| Still available | 150 units, 905–3586 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. 1 sale is left out of the median because the filed area or price is not credible — the register is typed in by promoters and some entries are wrong. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from October 2029 to February 2030, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Bibwewadi Munjeri · shown on this site as Wanowrie |
|---|---|
| Taluka | Haveli |
| Street, as filed | Munjeri |
| Bounded north by | Adj Plot G Out of the said Sanctioned Layout |
| Bounded east by | Adj Plot A Of the said Sanctioned Layout |
| Bounded south by | 12 M Wide Internal Road And thereafter Plot B |
| Bounded west by | By the Kondhwa Lullanagar Main DP Road And Ring Ro |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Nyati Builders Private Limited |
|---|---|
| Registered office | 7th Floor East Wing, East Wing, Nyati Unitree, Pune Nagar Road, Nyati Tiara, Cts. No. 1995(P)+1996B, Yerwada, Pune 411006 |
| Registered agents | 34 licensed agents may sell this project |
Professionals named on the filing
| Architect | Ar. NACHIKET NATU & ASSOCIATES CA/2010/48746 |
|---|---|
| Architect | VK:a Architecture CA/2002/29235 |
| Engineer | Nitin Nalawade |
| Engineer | Samishthi Techno Service Consultants LLP. PMC Lic No 795 |
| Engineer | Vijay Khaire |
| Engineer | Vishwanath Dhande AM-1747965 |
| Chartered Accountant | Milani & Associates 132864 |
| Chartered Accountant | Milani Gattani & Co 142946 |
| Chartered Accountant | P N Thombre & Associates 634859 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
4 cases against this project, 4 with an order on record, filed between Apr 2026 and Jun 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| SM12600445 | Jun 2026 | Order passed Jun 2026 |
| SM12600249 | Apr 2026 | Order passed Apr 2026 |
| SM12600254 | Apr 2026 | Order passed Apr 2026 |
| SM12600242 | Apr 2026 | Order passed Apr 2026 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report 1 Copy of the legal title report.pdf | 21 December 2024 |
|---|---|
| Promoter's declaration, Form B Form B.pdf | 6 December 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100078873 |
| Promoter | Nyati Builders Private Limited |
| Project type | Others · Building development |
| Locality | Wanowrie — Haveli taluka, pincode 411040 |
| Applied on | 07 December 2024 |
| Registered on | 17 January 2025 |
| Completion, as first filed | 30 October 2029 |
| Due | 28 February 2030 4 months later |
| Units declared | 256 |
| Units sold | 10 of 256 sold (4%), 246 still unsoldfilings disagree |
| Complaints | 4 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 20 August 2026 |
| Application reference | REA52100165917 |
| Current status | Active |
| Record last changed | 20 June 2025 · 15 months ago |
Where the sold count comes from, and whether it holds up. 10 of 256 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 10 of 256 sold, leaving 246. The unit-by-unit list they file separately covers 256 units and marks 55 sold with 150 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 20 June 2025.
Common questions
- Is Nyati Elenor registered with MahaRERA?
- Yes. It is registered as P52100078873, filed on 17 January 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Nyati Elenor due to be handed over?
- The promoter has told MahaRERA February 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Nyati Elenor been delayed?
- Yes. The first date filed was October 2029. It now stands at February 2030, 4 months later.
- What did buyers actually pay in Nyati Elenor?
- A median of ₹16,563 per square foot of carpet, across 99 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Nyati Elenor?
- 150 of 256 were still unsold at the promoter's last filing, in 1, 3, 4, 5 BHK + duplex, from 1,520–3,586 sq ft of carpet.
- Are there complaints against Nyati Elenor?
- 4 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Nyati Elenor?
- Nyati Builders Private Limited, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100078873 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Wanowrie
Stock image
- Nearby
- ₹10,523–14,363
- On offer
- 1, 2, 3 BHK
- Due
- Oct 2029
- Units
- 22
- Carpet
- 660–1,175
- Typical flat
- ~₹1.1 crore
Stock image
- Registered here
- ₹12,499
- On offer
- 1, 2, 3 BHK
- Due
- Apr 2028
- Units
- 94
- Carpet
- 530–1,028
- Sold at
- ₹98 lakh
Stock image
- Nearby
- ₹10,523
- On offer
- 1, 2 BHK
- Due
- Apr 2028
- Units
- 16
- Carpet
- 487–608
- Typical flat
- ~₹51.2 lakh