Z Zomefy

RERA registered PC1260002600348 Active

Ram Residency

Wanowrie, Pune · Commercial by Opulent Builders

Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.

In short

Ram Residency in Wanowrie is MahaRERA-registered (PC1260002600348) and still under construction, with possession filed for December 2028. No registered sale rate is on file for this project or its locality yet. None of the units are filed as sold yet. Opulent Builders is the promoter.

Stock image, not a photograph of Ram Residency Stock image
Where
Wanowrie
pincode 411040
Price
Not filed
no agreement or valuation on the register
Available
Office Space
1 left · 742 sq ft
Possession
Dec 2028
as filed with MahaRERA
A stock photograph, not Ram Residency. We have no picture of this site yet.

Where this is

Wanowrie, PMC, Pune, 411040

Street map of Wanowrie centred on the coordinate filed for Ram Residency, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
wanwadi
Taluka
Haveli
Pincode
411040
Coordinates
18.492228, 73.900020

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 1 units are filed unit by unit with the authority, the highest on floor 1. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Nothing filed here is a home. Every unit is registered as non-residential — shops, offices or similar — which is the promoter's own answer on the register rather than anything read off the areas below.

Office Space 1 unit · all available

1 unit 742 sq ft 68.93 sq m as filed
Units sold

0 / 1

Pre-launch / early phase

0% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Footprints, not plans. What is registered here is sold as a shell, and the register files its area and nothing else — so each box below is one unit's filed carpet area, drawn to its size against the largest one here, and it says nothing about how the space is divided up.

Office Space 1 unit · 1 available

742 sq ft carpet as drawn

Carpet, filed
742 sq ft
Built-up
about 890 sq ft
Super built-up
about 1,039 sq ft

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

Timeline audit

Original proposed Dec 2028
Current status Due Dec 2028

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Survey No. 53 CTS No. 1318 (1329/11) Hissa No. 15 Wanwadi is the plot this project is built on, as filed
Revenue village wanwadi · shown on this site as Wanowrie
TalukaHaveli
Street, as filed -
Bounded north by By CTS No. 1317 & S No. 53 Part
Bounded east by D P Road
Bounded south by CTS No. 1322 and S No. 53 Part
Bounded west by BY CTS No. 1319

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerOpulent Builders
Registered officeFlat No. B, Survey No. 78/A To 6,, Kumar Meadow Society,, Pune Solapur Road, Manjari, Pune 412307

Professionals named on the filing

Architect Babasaheb Dhavale & Associates CE/651
Engineer Rohinee Kailas Badgujar PCMC/LE/0651/2017
Engineer Sameer Laddha
Chartered Accountant Yogesh Mali 194796

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

13 April 2026 is when an advocate last certified the title to this land
Title report Search title report (8).pdf 13 April 2026
Promoter's declaration, Form B Form B Ram Residency.pdf 13 April 2026
Annexure A declaration ram Residency Declaration cum Undertaking.pdf 14 April 2026

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPC1260002600348
Promoter Opulent Builders
Project typeCommercial · Building development
LocalityWanowrie — Haveli taluka, pincode 411040
Applied on18 April 2026
Registered on05 May 2026
Completion, as first filed31 December 2028
Due31 December 2028
Units declared1
Units sold Not sold, the one unit here is on the market
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 05 May 2026
Application referenceACK02042600046
Current statusActive
Record last changed 05 May 2026 · 4 months ago

Nothing has sold yet. The promoter's quarterly progress report says none of the 1 units are gone, and the unit-by-unit list they file separately says the same: all 1 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 05 May 2026.

Common questions

Is Ram Residency registered with MahaRERA?
Yes. It is registered as PC1260002600348, filed on 05 May 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Ram Residency due to be handed over?
The promoter has told MahaRERA December 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Ram Residency been delayed?
No. December 2028 is the date first filed with the authority and it has not moved since.
How many units are left in Ram Residency?
1 of 1 were still unsold at the promoter's last filing, in Offices, from 742 sq ft of carpet.
Are there complaints against Ram Residency?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Ram Residency?
Opulent Builders, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for PC1260002600348 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Wanowrie