In short

Yashwin Urbo Centro Phase 2 in Wakad is MahaRERA-registered (P52100077674) and still under construction, with possession filed for October 2029. Buyers have already registered 967 sales here at a median ₹11,311 per sq ft of carpet — not an asking price. 3 complaints sit on the filing. Vilas Javdekar Infinitee Developers Pvt. Ltd. is the promoter.

Stock image, not a photograph of Yashwin Urbo Centro Phase 2 Stock image
Where
Wakad
pincode 411057
Sold here at
₹11,311
per sq ft, 967 registered sales
Available
2 BHK, 3 BHK, Shops
34 left · 480–1,062 sq ft
Now due
Oct 2029
4 months later than first promised
A stock photograph, not Yashwin Urbo Centro Phase 2. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Wakad · Mulshi

Wakad, PCMC, Pune, 411057

Village Wakad
Taluka Mulshi
Pincode 411057
Promoter Pin Coordinates 18.606562, 73.750812

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 1039 units are filed unit by unit with the authority, the highest on floor 34. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Configuration Mix & Volume Proportional share of project density
1039 Total Licenced Units
Residential Typology • 41.0% of tower

2 BHK Residences

12 Available 426 registered total
Estimated Market Window ₹60.3 lakh – ₹94.4 lakh
Locality Benchmark ₹11,311 / sq ft
Carpet Variations as Filed Span: 533 to 835 sq ft
535 sq ft 49.74 sq m 7 units
541 sq ft 50.28 sq m 7 units
542 sq ft 50.31 sq m 13 units
676 sq ft 62.79 sq m 51 units
683 sq ft 63.44 sq m 165 units
685 sq ft 63.62 sq m 32 units
698 sq ft 64.88 sq m 6 units
709 sq ft 65.91 sq m 30 units
711 sq ft 66.1 sq m 32 units
715 sq ft 66.38 sq m 6 units
717 sq ft 66.6 sq m 32 units
724 sq ft 67.23 sq m 26 units
533 sq ft 49.55 sq m 3 units
538 sq ft 49.96 sq m 5 units
539 sq ft 50.09 sq m 2 units
682 sq ft 63.34 sq m 2 units
708 sq ft 65.75 sq m 1 unit
710 sq ft 65.95 sq m 1 unit
720 sq ft 66.92 sq m 1 unit
722 sq ft 67.04 sq m 1 unit
747 sq ft 69.41 sq m 1 unit
835 sq ft 77.58 sq m 2 units
Govt ASR Base: ₹51.7 lakh – ₹62 lakh 12 of 426 available
Dominant Typology • 54.6% of tower

3 BHK Residences

20 Available 567 registered total
Estimated Market Window ₹80.2 lakh – ₹1.2 crore
Locality Benchmark ₹11,311 / sq ft
Carpet Variations as Filed Span: 709 to 1068 sq ft
836 sq ft 77.67 sq m 31 units
864 sq ft 80.29 sq m 30 units
898 sq ft 83.45 sq m 51 units
912 sq ft 84.69 sq m 30 units
913 sq ft 84.81 sq m 33 units
916 sq ft 85.1 sq m 31 units
927 sq ft 86.14 sq m 32 units
933 sq ft 86.67 sq m 31 units
1039 sq ft 96.51 sq m 30 units
1049 sq ft 97.46 sq m 31 units
1066 sq ft 99.05 sq m 31 units
1068 sq ft 99.23 sq m 64 units
709 sq ft 65.91 sq m 1 unit
715 sq ft 66.38 sq m 1 unit
821 sq ft 76.27 sq m 6 units
879 sq ft 81.63 sq m 6 units
897 sq ft 83.33 sq m 1 unit
899 sq ft 83.53 sq m 1 unit
902 sq ft 83.77 sq m 1 unit
904 sq ft 83.97 sq m 1 unit
910 sq ft 84.52 sq m 27 units
915 sq ft 84.96 sq m 2 units
918 sq ft 85.26 sq m 1 unit
920 sq ft 85.46 sq m 1 unit
925 sq ft 85.92 sq m 1 unit
930 sq ft 86.37 sq m 1 unit
951 sq ft 88.39 sq m 1 unit
953 sq ft 88.55 sq m 25 units
956 sq ft 88.83 sq m 1 unit
1045 sq ft 97.04 sq m 1 unit
1051 sq ft 97.62 sq m 1 unit
1054 sq ft 97.9 sq m 2 units
1055 sq ft 98.01 sq m 26 units
1058 sq ft 98.27 sq m 30 units
1060 sq ft 98.5 sq m 1 unit
1062 sq ft 98.68 sq m 2 units
1065 sq ft 98.94 sq m 1 unit
Govt ASR Base: ₹77.6 lakh – ₹93.7 lakh 20 of 567 available
Executive Typology • 0.6% of tower

4 BHK Residences

0 Available 6 registered total
Estimated Market Window ₹1.4 crore
Locality Benchmark ₹11,311 / sq ft
Carpet Variations as Filed Span: 1222 sq ft
1222 sq ft 113.57 sq m 6 units
None available
Commercial Footprint • 3.8% of project

Shops Suite

2 Available 40 registered total
State Min Valuation ₹42 lakh – ₹52.1 lakh
ASR Govt Rate ₹8,751 / sq ft
Carpet Variations as Filed Span: 203 to 667 sq ft
203 sq ft 18.86 sq m 1 unit
206 sq ft 19.18 sq m 1 unit
209 sq ft 19.46 sq m 1 unit
224 sq ft 20.8 sq m 1 unit
229 sq ft 21.26 sq m 2 units
231 sq ft 21.46 sq m 1 unit
254 sq ft 23.6 sq m 1 unit
267 sq ft 24.79 sq m 1 unit
274 sq ft 25.49 sq m 1 unit
281 sq ft 26.07 sq m 1 unit
322 sq ft 29.88 sq m 2 units
398 sq ft 36.95 sq m 2 units
282 sq ft 26.22 sq m 1 unit
291 sq ft 27.0 sq m 1 unit
314 sq ft 29.14 sq m 1 unit
319 sq ft 29.63 sq m 1 unit
323 sq ft 29.99 sq m 1 unit
346 sq ft 32.13 sq m 1 unit
386 sq ft 35.84 sq m 1 unit
388 sq ft 36.02 sq m 1 unit
394 sq ft 36.64 sq m 1 unit
396 sq ft 36.82 sq m 1 unit
410 sq ft 38.08 sq m 1 unit
422 sq ft 39.16 sq m 1 unit
425 sq ft 39.48 sq m 1 unit
427 sq ft 39.63 sq m 1 unit
441 sq ft 40.93 sq m 1 unit
460 sq ft 42.74 sq m 1 unit
468 sq ft 43.49 sq m 1 unit
480 sq ft 44.6 sq m 1 unit
500 sq ft 46.44 sq m 1 unit
519 sq ft 48.21 sq m 1 unit
521 sq ft 48.4 sq m 1 unit
532 sq ft 49.44 sq m 1 unit
563 sq ft 52.34 sq m 1 unit
595 sq ft 55.27 sq m 1 unit
667 sq ft 61.95 sq m 1 unit
Govt ASR Base: ₹42 lakh – ₹52.1 lakh 2 of 40 available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
2 BHK 533 – 835 sq ft (49.74 – 77.58 sq m) ~640 – 1002 sq ft ~746 – 1169 sq ft 12 left of 426
3 BHK 709 – 1068 sq ft (77.67 – 98.94 sq m) ~851 – 1282 sq ft ~993 – 1495 sq ft 20 left of 567
4 BHK 1222 sq ft (113.57 sq m) ~1466 sq ft ~1711 sq ft 0 left of 6
Shops 203 – 667 sq ft (18.86 – 61.95 sq m) ~244 – 800 sq ft ~284 – 934 sq ft 2 left of 40
Units sold

813 / 1039

Selling steadily

78% absorption rate · the promoter's two filings disagree

Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

2 BHK 426 units · 12 available

683 sq ft carpet as drawn, from 533–835 sq ft filed in this configuration

Carpet, filed
683 sq ft
Built-up
about 820 sq ft
Super built-up
about 956 sq ft
Every room in this unit

Living and dining about 199 sq ft, Master bedroom about 133 sq ft, Second bedroom about 106 sq ft, Kitchen about 80 sq ft, Bath about 46 sq ft, Balcony about 46 sq ft, Second bath about 40 sq ft, Passage about 33 sq ft.

3 BHK 567 units · 20 available

1,068 sq ft carpet as drawn, from 709–1,068 sq ft filed in this configuration

Carpet, filed
1,068 sq ft
Built-up
about 1,282 sq ft
Super built-up
about 1,495 sq ft
Every room in this unit

Living and dining about 263 sq ft, Master bedroom about 175 sq ft, Second bedroom about 140 sq ft, Third bedroom about 114 sq ft, Kitchen about 105 sq ft, Bath about 61 sq ft, Balcony about 61 sq ft, Second bath about 53 sq ft, Passage about 53 sq ft, Third bath about 44 sq ft.

4 BHK 6 units · none available

1,222 sq ft carpet as drawn

Carpet, filed
1,222 sq ft
Built-up
about 1,466 sq ft
Super built-up
about 1,711 sq ft
Every room in this unit

Living and dining about 272 sq ft, Master bedroom about 181 sq ft, Second bedroom about 145 sq ft, Third bedroom about 118 sq ft, Kitchen about 109 sq ft, Fourth bedroom about 109 sq ft, Bath about 63 sq ft, Balcony about 63 sq ft, Passage about 63 sq ft, Second bath about 54 sq ft, Third bath about 45 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹11,311 per sq ft of carpet, median of 967 registered sales
Range across those sales ₹5,305 to ₹14,166 per sq ft
Sold and booked 1004 sold, 1 booked
Still available 34 units, 203–1222 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

27 further sales are set aside. They divide out beyond ₹28,277 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State Revised (+4 months)
Original Baseline
Jun 2029
Declared at registration
Current Statutory Date
Due
Oct 2029
4 months later than filed

Revised delivery projection

The completion date has moved from June 2029 to October 2029, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Plot A1+A2 out of S No122/1, 122/1/A/3, 122/2, 122/5 and 122/5/1 is the plot this project is built on, as filed
Revenue village Wakad
TalukaMulshi
Street, as filed Wakad
Bounded north by By Plot B out of S no 122 by 1 and others
Bounded east by By 12 mt service rd and 60 mt Mumbai Banglore high
Bounded south by By Part land of Plot A1 and A2 and Plot C
Bounded west by By sno 122P and part land of Plot A1 and A2

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerVilas Javdekar Infinitee Developers Pvt. Ltd.
Registered office306 , 307, 306, Siddharth Towers, S. No. 12/ 3B, Opposite Contacare Eye Hospital, Kothrud, Pune 411038
Registered agents 120 licensed agents may sell this project

Professionals named on the filing

Architect Asad Ahmed CA/2023/158747
Architect Deepali Patidar CA/2017/83464
Architect Neha Bagayatkar CA/2018/101242
Architect Priya Honmute CA/2018/101709
Architect Voussoirs CA/92/14618
Engineer Sagar Kale REG/PMC/STE/3343/25
Chartered Accountant Abhijit Mundada 134685
Chartered Accountant Sunil Nimbalkar 197121

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

3 cases against this project, 3 with an order on record, filed between Feb 2025 and Mar 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12601734 Mar 2026 Order passed Mar 2026
CC12501570 May 2025 Order passed May 2025
CC12500525 Feb 2025 Order passed Feb 2025

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

9 October 2024 is when an advocate last certified the title to this land
Title report TSR_YUC2.pdf 9 October 2024
Promoter's declaration, Form B Form B_Promoter_compressed.pdf 9 October 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100077674
Promoter Vilas Javdekar Infinitee Developers Pvt. Ltd.
Project typeOthers · Building development
LocalityWakad — Mulshi taluka, pincode 411057
Applied on09 October 2024
Registered on21 October 2024
Completion, as first filed30 June 2029
Due30 October 2029 4 months later
Units declared1039
Units sold 813 of 1039 sold (78%), 226 still unsoldfilings disagree
Complaints3 on record with MahaRERA
Certificate on file Corrected certificate, issued 12 August 2026
Application referenceREA52100164985
Current statusActive
Record last changed 11 August 2025 · 14 months ago

Where the sold count comes from, and whether it holds up. 813 of 1039 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 813 of 1039 sold, leaving 226. The unit-by-unit list they file separately covers 1039 units and marks 1004 sold with 34 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 11 August 2025.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 7 Direct Answers
Is Yashwin Urbo Centro Phase 2 registered with MahaRERA?
Yes. It is registered as P52100077674, filed on 21 October 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Yashwin Urbo Centro Phase 2 due to be handed over?
The promoter has told MahaRERA October 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Yashwin Urbo Centro Phase 2 been delayed?
Yes. The first date filed was June 2029. It now stands at October 2029, 4 months later.
What did buyers actually pay in Yashwin Urbo Centro Phase 2?
A median of ₹11,311 per square foot of carpet, across 967 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Yashwin Urbo Centro Phase 2?
34 of 1,039 were still unsold at the promoter's last filing, in 2, 3 BHK + shops, from 480–1,062 sq ft of carpet.
Are there complaints against Yashwin Urbo Centro Phase 2?
3 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Yashwin Urbo Centro Phase 2?
Vilas Javdekar Infinitee Developers Pvt. Ltd., as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 13 October 2026. The authority's own registry page for P52100077674 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Wakad

Stock image, not a photograph of Vantagio. Ph2 Stock image
Valued from
₹6,782
On offer
Offices
Ready to move

Vantagio. Ph2

Harmony Shubham Associates · Wakad

6 sold
Slipped 16 months
Done
Sep 2025
Units
18
Carpet
982–8,256
Typical unit
~₹3.7 crore
P52100034311
Stock image, not a photograph of Varad Residency Stock image
Registered here
₹10,759
On offer
2, 3 BHK +2 more
Lapsed

Varad Residency

Vilas Bhagaji Arekar · Wakad

65 sold

Registration lapsed

Slipped 9 months
Was due
Sep 2026
Units
31
Carpet
290–965
Sold at
₹64.8 lakh
P52100050115