RERA registered P52100079655 Active
Wakad Central Park
Wakad, Pune · Others by Shree Venkateshwara Group
Official record Updated from the register 14 November 2026. Anything filed since then is not here yet.
In short
Wakad Central Park in Wakad is MahaRERA-registered (P52100079655) and still under construction, with possession filed for April 2028. Buyers have already registered 14 sales here at a median ₹10,474 per sq ft of carpet — not an asking price. About 24% of the 108 units are sold. 1 complaint sits on the filing. Shree Venkateshwara Group is the promoter.
- Sold here at
- ₹10,474
- per sq ft, 14 registered sales
- Available
- 3 BHK, Shops
- 19 left · 410–1,243 sq ft
- Now due
- Apr 2028
- 4 months later than first promised
Wakad, PCMC, Pune, 411057
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Unit sizes on file
All 108 units are filed unit by unit with the authority, the highest on floor 12. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
3 BHK Residences
Shops Suite
Carpet Area vs. Loading Factor Arithmetic
How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)
| Unit Configuration | Statutory RERA Carpet (Actual) | Approx Built-up (+20%) | Super Built-up (+40% Loading) | Available Inventory |
|---|---|---|---|---|
| 3 BHK | 857 – 1074 sq ft (79.59 – 99.81 sq m) | ~1028 – 1289 sq ft | ~1200 – 1504 sq ft | 7 left of 33 |
| Shops | 107 – 1877 sq ft (9.9 – 174.35 sq m) | ~128 – 2252 sq ft | ~150 – 2628 sq ft | 12 left of 75 |
26 / 108
24% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
3 BHK 33 units · 7 available
857 sq ft carpet as drawn, from 857–1,074 sq ft filed in this configuration
- Carpet, filed
- 857 sq ft
- Built-up
- about 1,028 sq ft
- Super built-up
- about 1,200 sq ft
Every room in this unit
Living and dining about 211 sq ft, Master bedroom about 140 sq ft, Second bedroom about 112 sq ft, Third bedroom about 91 sq ft, Kitchen about 84 sq ft, Bath about 49 sq ft, Balcony about 49 sq ft, Second bath about 42 sq ft, Passage about 42 sq ft, Third bath about 35 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹8,358 to ₹14,862 per sq ft |
|---|---|
| Sold and booked | 26 sold, 0 booked |
| Still available | 19 units, 107–1877 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Revised delivery projection
The completion date has moved from December 2027 to April 2028, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Wakad |
|---|---|
| Taluka | Mulshi |
| Street, as filed | WAKAD |
| Bounded north by | CTS NO 1129 P |
| Bounded east by | CTS NO 1128 |
| Bounded south by | CTS NO 1130 P |
| Bounded west by | 24 MTR ROAD |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Shree Venkateshwara Group |
|---|---|
| Registered office | Office No. 302, Office No 302, Sai Crystal, New Dp Road, Above Hdfc Bank, Pimple Nilakh, Pune 411027 |
Professionals named on the filing
| Architect | Sachin Ladkat And Associate PCMC/LE/0241/2017 |
|---|---|
| Architect | Sachin Sutar CA/95/18039 |
| Engineer | Constrotechnics REG/PMC/STE/0933/23 |
| Chartered Accountant | CA Dolly Gandhi 635220 |
| Chartered Accountant | Navdeep Jindal And Associates 164075 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| SM12600633 | Sep 2026 | Order passed Sep 2026 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report search report.pdf | 6 January 2025 |
|---|---|
| Promoter's declaration, Form B form b - promoter_compressed.pdf | 26 December 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100079655 |
| Promoter | Shree Venkateshwara Group |
| Project type | Others · Building development |
| Locality | Wakad — Mulshi taluka, pincode 411057 |
| Applied on | 10 December 2024 |
| Registered on | 18 March 2025 |
| Completion, as first filed | 31 December 2027 |
| Due | 30 April 2028 4 months later |
| Units declared | 108 |
| Units sold | 26 of 108 sold (24%), 82 still unsold |
| Complaints | 1 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 21 August 2026 |
| Application reference | REA52100165958 |
| Current status | Active |
| Record last changed | 16 May 2026 · 6 months ago |
Where the sold count comes from, and whether it holds up. 26 of 108 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 108 units and reaches the same answer — 26 sold, every one with money recorded as received against a named unit, and 19 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 16 May 2026.
- Is Wakad Central Park registered with MahaRERA?
- Yes. It is registered as P52100079655, filed on 18 March 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Wakad Central Park due to be handed over?
- The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Wakad Central Park been delayed?
- Yes. The first date filed was December 2027. It now stands at April 2028, 4 months later.
- What did buyers actually pay in Wakad Central Park?
- A median of ₹10,474 per square foot of carpet, across 14 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Wakad Central Park?
- 19 of 108 were still unsold at the promoter's last filing, in 3 BHK + shops, from 410–1,243 sq ft of carpet.
- Are there complaints against Wakad Central Park?
- 1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Wakad Central Park?
- Shree Venkateshwara Group, as the promoter named on the registration.
Verify Government Filings Yourself
This dossier restates public records as filed on 14 November 2026. The authority's own registry page for P52100079655 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.
MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.
Other projects in Wakad
Stock image
- Registered here
- ₹8,404
- On offer
- 2, 3 BHK + 1 RK
1 complaint
- Due
- Oct 2027
- Units
- 115
- Carpet
- 316–1,068
- Sold at
- ₹85 lakh
Stock image
- Registered here
- ₹8,587
- On offer
- 1, 2 BHK
18 complaints
- Due
- Dec 2026
- Units
- 459
- Carpet
- 422–630
- Sold at
- ₹55.4 lakh
Stock image
- Registered here
- ₹10,461
- On offer
- 1, 2, 3 BHK +2 more
- Due
- Jun 2027
- Units
- 358
- Carpet
- 312–1,076
- Sold at
- ₹1.1 crore