RERA registered P52100051553 Active
Meander Wing C
Wagholi, Pune · Residential / Group Housing by Eastend Spaces LLP
Official record Updated from the register 12 September 2026. Anything filed since then is not here yet.
In short
Meander Wing C in Wagholi is MahaRERA-registered (P52100051553) and still under construction, with possession filed for December 2026. Buyers have already registered 107 sales here at a median ₹6,424 per sq ft of carpet — not an asking price. About 97% of the 110 units are sold. Eastend Spaces LLP is the promoter.
- Sold here at
- ₹6,424
- per sq ft, 107 registered sales
- Available
- 2 BHK
- 3 left · 596–617 sq ft
- Now due
- Dec 2026
- 10 months later than first promised
Where this is
Wagholi, PMC, Pune, 412207
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 110 flats are filed unit by unit with the authority, the highest on floor 14. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 26 units · all sold
2 BHK 84 units · 3 available
107 / 110
97% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 26 flats · none available
436 sq ft carpet as drawn, from 436–439 sq ft filed in this configuration
- Carpet, filed
- 436 sq ft
- Built-up
- about 523 sq ft
- Super built-up
- about 610 sq ft
Every room in this flat
Living and dining about 164 sq ft, Master bedroom about 109 sq ft, Kitchen about 65 sq ft, Bath about 38 sq ft, Balcony about 38 sq ft, Passage about 22 sq ft.
2 BHK 84 flats · 3 available
596 sq ft carpet as drawn, from 596–617 sq ft filed in this configuration
- Carpet, filed
- 596 sq ft
- Built-up
- about 715 sq ft
- Super built-up
- about 834 sq ft
Every room in this flat
Living and dining about 174 sq ft, Master bedroom about 116 sq ft, Second bedroom about 93 sq ft, Kitchen about 69 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Second bath about 35 sq ft, Passage about 29 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹5,606 to ₹7,380 per sq ft |
|---|---|
| Sold and booked | 106 sold, 1 booked |
| Still available | 3 flats, 436–617 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from March 2026 to December 2026, 10 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | WAGHOLI · shown on this site as Wagholi |
|---|---|
| Taluka | Haveli |
| Street, as filed | WAGHOLI RAHU ROAD |
| Bounded north by | GAT NO 885 PART OWNED BY MR NAMDEV KALE |
| Bounded east by | GAT NO 885 OWNED BY GREENMARK PROPERTIES |
| Bounded south by | GAT NO 956 AND 883 |
| Bounded west by | GAT NO 894 OWNED BY GREENMARK PROPERTIES |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Eastend Spaces LLP |
|---|---|
| Registered office | 102, Shalimar Pride, S B Road, Near Icc Tower, Shivajinagar, Pune 411016 |
Professionals named on the filing
| Architect | Samaskara Architects CA/2022/143734 |
|---|---|
| Engineer | S K Consultants & Engineers |
| Chartered Accountant | Kartik Patel |
| Chartered Accountant | N B Sayed & Associates 631662 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report SEARCH TITLE REPORT.pdf | 22 March 2023 |
|---|---|
| Promoter's declaration, Form B FORM B EASTEND.pdf | 15 March 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100051553 |
| Promoter | Eastend Spaces LLP |
| Project type | Residential / Group Housing · Building development |
| Locality | Wagholi — Haveli taluka, pincode 412207 |
| Applied on | 03 April 2023 |
| Registered on | 27 June 2023 |
| Completion, as first filed | 01 March 2026 |
| Due | 31 December 2026 10 months later |
| Units declared | 110 |
| Units sold | 107 of 110 sold (97%), 3 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 20 August 2026 |
| Application reference | REA52100135418 |
| Current status | Active |
| Record last changed | 01 June 2026 · 3 months ago |
Where the sold count comes from, and whether it holds up. 107 of 110 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 110 flats and reaches the same answer — 106 sold, every one with money recorded as received against a named flat, 1 booked with a price agreed but nothing received yet, and 3 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 01 June 2026.
Common questions
- Is Meander Wing C registered with MahaRERA?
- Yes. It is registered as P52100051553, filed on 27 June 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Meander Wing C due to be handed over?
- The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Meander Wing C been delayed?
- Yes. The first date filed was March 2026. It now stands at December 2026, 10 months later.
- What did buyers actually pay in Meander Wing C?
- A median of ₹6,424 per square foot of carpet, across 107 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Meander Wing C?
- 3 of 110 were still unsold at the promoter's last filing, in 2 BHK, from 596–617 sq ft of carpet.
- Are there complaints against Meander Wing C?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Meander Wing C?
- Eastend Spaces LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 12 September 2026. The authority's own page for P52100051553 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Wagholi
Stock image
- Nearby
- ₹9,339
- On offer
- 2 BHK
- Due
- Dec 2028
- Units
- 9
- Carpet
- 606–658
- Typical flat
- ~₹59.1 lakh
Stock image
- Registered here
- ₹8,463
- On offer
- 2, 3 BHK
- Due
- Dec 2026
- Units
- 70
- Carpet
- 650–841
- Sold at
- ₹56 lakh
Stock image
- Registered here
- ₹8,670
- On offer
- 1, 2, 3 BHK
- Due
- Apr 2028
- Units
- 72
- Carpet
- 472–841
- Sold at
- ₹57.3 lakh