In short

August Towers Ph 1 in Viman Nagar is MahaRERA-registered (P52100048195) and still under construction, with possession filed for December 2028. Buyers have already registered 276 sales here at a median ₹13,186 per sq ft of carpet — not an asking price. About 88% of the 314 units are sold. 1 complaint sits on the filing. Bramhacorp Limited is the promoter.

Stock image, not a photograph of August Towers Ph 1 Stock image
Where
Viman Nagar
pincode 411014
Sold here at
₹13,186
per sq ft, 276 registered sales
Available
1 Room Kitchen, 2 BHK, 3 BHK, Shops
38 left · 240–1,032 sq ft
Possession
Dec 2028
as filed with MahaRERA
A stock photograph, not August Towers Ph 1. We have no picture of this site yet.

Where this is

Viman Nagar, PMC, Pune, 411014

Taluka
Haveli
Pincode
411014

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Unit sizes on file

All 314 units are filed unit by unit with the authority, the highest on floor 28. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 Room Kitchen 5 units · 1 available

4 units 241 sq ft 22.41 sq m as filed
1 unit 516 sq ft 47.98 sq m as filed

2 BHK 296 units · 24 available

54 units 450 sq ft 41.78 sq m as filed
28 units 452 sq ft 41.99 sq m as filed
28 units 453 sq ft 42.07 sq m as filed
27 units 455 sq ft 42.25 sq m as filed
22 units 516 sq ft 47.98 sq m as filed
54 units 518 sq ft 48.17 sq m as filed
27 units 526 sq ft 48.88 sq m as filed
27 units 554 sq ft 51.47 sq m as filed
27 units 565 sq ft 52.49 sq m as filed
1 unit 804 sq ft 74.73 sq m as filed
1 unit 807 sq ft 74.95 sq m as filed

3 BHK 2 units · all available

2 units 1032 sq ft 95.83–95.92 sq m as filed

Configuration not filed 5 units · all available

1 unit 819 sq ft 76.11 sq m as filed
1 unit 892 sq ft 82.88 sq m as filed
1 unit 937 sq ft 87.08 sq m as filed
1 unit 1012 sq ft 94.0 sq m as filed
1 unit 1013 sq ft 94.08 sq m as filed

Shops 6 units · all available

1 unit 240 sq ft 22.28 sq m as filed
1 unit 265 sq ft 24.6 sq m as filed
1 unit 290 sq ft 26.95 sq m as filed
1 unit 302 sq ft 28.04 sq m as filed
1 unit 337 sq ft 31.32 sq m as filed
1 unit 377 sq ft 35.02 sq m as filed
Units sold

276 / 314

Nearly sold out

88% absorption rate

Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

1 Room Kitchen 5 units · 1 available

241 sq ft carpet as drawn, from 241–516 sq ft filed in this configuration

Carpet, filed
241 sq ft
Built-up
about 289 sq ft
Super built-up
about 337 sq ft
Every room in this unit

Living and sleeping about 145 sq ft, Kitchen about 48 sq ft, Bath about 27 sq ft, Balcony about 22 sq ft.

2 BHK 296 units · 24 available

450 sq ft carpet as drawn, from 450–807 sq ft filed in this configuration

Carpet, filed
450 sq ft
Built-up
about 540 sq ft
Super built-up
about 630 sq ft
Every room in this unit

Living and dining about 131 sq ft, Master bedroom about 87 sq ft, Second bedroom about 70 sq ft, Kitchen about 52 sq ft, Bath about 31 sq ft, Balcony about 31 sq ft, Second bath about 26 sq ft, Passage about 22 sq ft.

3 BHK 2 units · 2 available

1,032 sq ft carpet as drawn

Carpet, filed
1,032 sq ft
Built-up
about 1,238 sq ft
Super built-up
about 1,445 sq ft
Every room in this unit

Living and dining about 254 sq ft, Master bedroom about 169 sq ft, Second bedroom about 135 sq ft, Third bedroom about 110 sq ft, Kitchen about 102 sq ft, Bath about 59 sq ft, Balcony about 59 sq ft, Second bath about 51 sq ft, Passage about 51 sq ft, Third bath about 42 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹13,186 per sq ft of carpet, median of 276 registered sales
Range across those sales ₹9,399 to ₹16,031 per sq ft
Sold and booked 276 sold, 0 booked
Still available 38 units, 240–1032 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2028
Current status Due Dec 2028

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

SURVEY NO 7 HISSA NO 1 to 7/5, 8/1/1/2, 3/2(P) is the plot this project is built on, as filed
Street, as filed -
Bounded north by BY ADJ S NO 3-2 AND AMENITY SPACE
Bounded east by BY ADJ S NO 3
Bounded south by BY ADJ HISSA NO 7-2 P
Bounded west by BY ROAD

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerBramhacorp Limited
Registered officeS. No. 12A, Plot No. 99, Corporate Office, Rbm Road, Next To Sheraton Grand, Sangamwadi, Pune 411001
Registered agents 1 licensed agent may sell this project

Professionals named on the filing

Architect Fourth Dimension Architect Pvt Ltd .
Architect Imran Shaikh CA/2002/30388
Architect Nikhil Sakhare CA/2011/51346
Architect Padmakar Kole CA/91/14400
Architect Sachin Shah CA/2006/37669
Engineer Dattatray Gaikwad
Engineer Pankajkumar A Somvanshi REG/PMC/STE/0863/15
Engineer Pradip Walvekar REG/PMC/STE/0921/26
Chartered Accountant F A A & Associates LLP 141424
Chartered Accountant Faiz Shaikh And Co .
Chartered Accountant S D Kharadkar & Associates 039950

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

1 case against this project, 0 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12600382 Jan 2026 No order on record

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

3 December 2022 is when an advocate last certified the title to this land
Title report TSR AUGUST TOWERS PH 1_1.pdf 3 December 2022
Promoter's declaration, Form B Form B August Towers.pdf 25 October 2024 3 older versions on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100048195
Promoter Bramhacorp Limited
Project typeOthers · Building development
LocalityViman Nagar — Haveli taluka, pincode 411014
Applied on29 November 2022
Registered on15 December 2022
Completion, as first filed31 December 2028
Due31 December 2028
Units declared314
Units sold 276 of 314 sold (88%), 38 still unsold
Complaints1 on record with MahaRERA
Certificate on file Original registration certificate, issued 20 February 2024
Application referenceREA52100125266
Current statusActive
Record last changed 25 October 2024 · 23 months ago

Where the sold count comes from, and whether it holds up. 276 of 314 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 314 units and reaches the same answer — 276 sold, every one with money recorded as received against a named unit, and 38 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 25 October 2024.

Common questions

Is August Towers Ph 1 registered with MahaRERA?
Yes. It is registered as P52100048195, filed on 15 December 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is August Towers Ph 1 due to be handed over?
The promoter has told MahaRERA December 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has August Towers Ph 1 been delayed?
No. December 2028 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in August Towers Ph 1?
A median of ₹13,186 per square foot of carpet, across 276 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in August Towers Ph 1?
38 of 314 were still unsold at the promoter's last filing, in 2, 3 BHK +2 more, from 240–1,032 sq ft of carpet.
Are there complaints against August Towers Ph 1?
1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building August Towers Ph 1?
Bramhacorp Limited, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100048195 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.