RERA registered P52100051679 Active
Metro Life Ultima Residences Phase I
Tathawade, Pune · Others by Rama Synergy Spaces
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Metro Life Ultima Residences Phase I in Tathawade is MahaRERA-registered (P52100051679) and still under construction, with possession filed for December 2027. Buyers have already registered 155 sales here at a median ₹11,087 per sq ft of carpet — not an asking price. About 80% of the 194 units are sold. 1 complaint sits on the filing. Rama Synergy Spaces is the promoter.
- Sold here at
- ₹11,087
- per sq ft, 155 registered sales
- Available
- 2 BHK, 3 BHK, 4 BHK, Shops
- 39 left · 210–1,302 sq ft
- Possession
- Dec 2027
- as filed with MahaRERA
Where this is
Tathawade, PCMC, Pune, 411033
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Unit sizes on file
All 194 units are filed unit by unit with the authority, the highest on floor 29. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 58 units · 1 available
3 BHK 91 units · 13 available
4 BHK 23 units · 3 available
Shops 22 units · all available
8 further sizes, 8 units between them
155 / 194
80% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 58 units · 1 available
726 sq ft carpet as drawn, from 726–774 sq ft filed in this configuration
- Carpet, filed
- 726 sq ft
- Built-up
- about 871 sq ft
- Super built-up
- about 1,016 sq ft
Every room in this unit
Living and dining about 211 sq ft, Master bedroom about 141 sq ft, Second bedroom about 113 sq ft, Kitchen about 85 sq ft, Bath about 49 sq ft, Balcony about 49 sq ft, Second bath about 42 sq ft, Passage about 35 sq ft.
3 BHK 91 units · 13 available
1,006 sq ft carpet as drawn, from 1,006–1,102 sq ft filed in this configuration
- Carpet, filed
- 1,006 sq ft
- Built-up
- about 1,207 sq ft
- Super built-up
- about 1,408 sq ft
Every room in this unit
Living and dining about 247 sq ft, Master bedroom about 165 sq ft, Second bedroom about 132 sq ft, Third bedroom about 107 sq ft, Kitchen about 99 sq ft, Bath about 58 sq ft, Balcony about 58 sq ft, Second bath about 49 sq ft, Passage about 49 sq ft, Third bath about 41 sq ft.
4 BHK 23 units · 3 available
1,302 sq ft carpet as drawn
- Carpet, filed
- 1,302 sq ft
- Built-up
- about 1,562 sq ft
- Super built-up
- about 1,823 sq ft
Every room in this unit
Living and dining about 289 sq ft, Master bedroom about 193 sq ft, Second bedroom about 154 sq ft, Third bedroom about 125 sq ft, Kitchen about 116 sq ft, Fourth bedroom about 116 sq ft, Bath about 68 sq ft, Balcony about 68 sq ft, Passage about 68 sq ft, Second bath about 58 sq ft, Third bath about 48 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹8,757 to ₹13,370 per sq ft |
|---|---|
| Sold and booked | 154 sold, 1 booked |
| Still available | 39 units, 210–1302 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Tathwade · shown on this site as Tathawade |
|---|---|
| Taluka | Mulshi |
| Street, as filed | New Pune Mumbai Highway |
| Bounded north by | 60 mtrs wide road Survey no 90 2 |
| Bounded east by | 60 mtrs wide road survey no 90 2 |
| Bounded south by | By Survey no 89 |
| Bounded west by | Survey no 91 7 Survey no 91 1 1 Survey no 91 1 2 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Rama Synergy Spaces |
|---|---|
| Registered office | Rama Equator 10th Floor, Rama Corporate House, Morwadi, City International School, Pune 411018 |
Professionals named on the filing
| Architect | Landmark Design Group CA/90/13423 |
|---|---|
| Engineer | Akshay Nigade EN16-32269 |
| Engineer | Sanjay Netke |
| Chartered Accountant | L. B. Laddha & Co 010550 |
| Chartered Accountant | Madhusudan Jhanwar 121450 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC005000000259297 | Jul 2024 | Order passed Jul 2024 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report Legal Title Report.pdf | 29 March 2023 |
|---|---|
| Promoter's declaration, Form B 14 Declaration in FORM B.pdf | 29 March 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100051679 |
| Promoter | Rama Synergy Spaces |
| Project type | Others · Building development |
| Locality | Tathawade — Mulshi taluka, pincode 411033 |
| Applied on | 29 March 2023 |
| Registered on | 27 June 2023 |
| Completion, as first filed | 31 December 2027 |
| Due | 31 December 2027 |
| Units declared | 194 |
| Units sold | 155 of 194 sold (80%), 39 still unsold |
| Complaints | 1 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 27 June 2023 |
| Application reference | REA52100135115 |
| Current status | Active |
| Record last changed | 27 June 2023 · over 3 years ago 3 years untouched |
Where the sold count comes from, and whether it holds up. 155 of 194 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 194 units and reaches the same answer — 154 sold, every one with money recorded as received against a named unit, 1 booked with a price agreed but nothing received yet, and 39 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 27 June 2023.
MahaRERA has not recorded a change to this project's record in 3 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.
Common questions
- Is Metro Life Ultima Residences Phase I registered with MahaRERA?
- Yes. It is registered as P52100051679, filed on 27 June 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Metro Life Ultima Residences Phase I due to be handed over?
- The promoter has told MahaRERA December 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Metro Life Ultima Residences Phase I been delayed?
- No. December 2027 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Metro Life Ultima Residences Phase I?
- A median of ₹11,087 per square foot of carpet, across 155 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Metro Life Ultima Residences Phase I?
- 39 of 194 were still unsold at the promoter's last filing, in 2, 3, 4 BHK + shops, from 210–1,302 sq ft of carpet.
- Are there complaints against Metro Life Ultima Residences Phase I?
- 1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Metro Life Ultima Residences Phase I?
- Rama Synergy Spaces, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100051679 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Tathawade
Stock image
- Registered here
- ₹10,399
- On offer
- 2, 3 BHK + shops
- Due
- Dec 2028
- Units
- 124
- Carpet
- 284–1,386
- Sold at
- ₹71.7 lakh
Stock image
- Registered here
- ₹10,730
- On offer
- 1, 2, 3 BHK
- Due
- Dec 2028
- Units
- 315
- Carpet
- 417–1,016
- Sold at
- ₹71.9 lakh
Stock image
- Registered here
- ₹11,267
- On offer
- 3 BHK
- Due
- Dec 2029
- Units
- 99
- Carpet
- 1,172
- Sold at
- ₹1.3 crore