RERA registered P52100010639 Active
Sai Chambers
Shivajinagar, Pune · Residential / Group Housing by Milind Ramkrishna Upasani
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Sai Chambers in Shivajinagar is MahaRERA-registered (P52100010639) and still under construction, with possession filed for December 2026. No sales are registered in this project yet. Across Shivajinagar, buyers have been registering around ₹25,635 per sq ft of carpet (170 sales in the locality) — the area median, not this building. About 20% of the 66 units are sold. 1 complaint sits on the filing. Milind Ramkrishna Upasani is the promoter.
- Shivajinagar at
- ₹25,635
- per sq ft across the locality, not this project
- Available
- Office Space
- 43 left · 240–424 sq ft
- Now due
- Dec 2026
- 8 years later than first promised
Where this is
Shivajinagar, Pune, 411005
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 66 units are filed unit by unit with the authority, the highest on floor 6. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 Room Kitchen 1 unit · not for sale
Configuration not filed 8 units · 1 available
Office Space 57 units · 42 available
13 / 66
20% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 Room Kitchen 1 unit · none available
416 sq ft carpet as drawn
- Carpet, filed
- 416 sq ft
- Built-up
- about 499 sq ft
- Super built-up
- about 582 sq ft
Every room in this unit
Living and sleeping about 250 sq ft, Kitchen about 83 sq ft, Bath about 46 sq ft, Balcony about 37 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What units like these cost nearby
No sale has been registered at Sai Chambers yet. 2 agreements have been filed, which is too few to divide into a rate anyone should act on.
| Median across Shivajinagar | ₹25,635 per sq ft of carpet, from 170 registered sales |
|---|---|
| The middle half of them | ₹19,796 to ₹32,868 per sq ft |
| Carpet sizes filed here | 240–424 sq ft |
| Still available | 43 units |
This is Shivajinagar as a whole and not a rate for Sai Chambers, and it is pooled across every configuration the locality has registered — studios and four-bedroom flats included — because Shivajinagar has not filed enough sales of any single configuration on sale here to quote one separately. Treat it as the order of magnitude for the area rather than a figure to negotiate against. See the full distribution for Shivajinagar.
The government's valuation of the unsold units
| On sale here | Carpet | Valued at no less than |
|---|---|---|
| Not named 1 unsold | 240 sq ft | ₹29.4 lakh ₹12,256/sq ft |
| Office Space 42 unsold | 240–424 sq ft | ₹33.8 lakh–₹59.8 lakh ₹14,096/sq ft |
This is the Annual Statement of Rates value the promoter filed against each unsold unit — the state's valuation, not an asking price and not a discount. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Revised projection
The completion date has moved from January 2019 to December 2026, 8 years later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Pune (M Corp.) · shown on this site as Shivajinagar |
|---|---|
| Taluka | Pune City |
| Street, as filed | Sr No. 83 F plot no. 819 part, Pune |
| Bounded north by | shed of Mr satpute |
| Bounded east by | part of sub plot No 6 |
| Bounded south by | public road |
| Bounded west by | wall of Mr purendare and Mr bhalerao |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Milind Ramkrishna Upasani |
|---|---|
| Registered office | F P No 819, Sai Chambers, Topkhana, District Court, Shivajinagar, Pune 411005 |
Professionals named on the filing
| Architect | Rajendra H Thite 716 |
|---|---|
| Engineer | Anirudha Vanarse |
| Engineer | Yashdeep Jadon AM3003335 |
| Chartered Accountant | Bogati & Co. 137351 |
| Chartered Accountant | Pushpa Bogati 137351 |
| Chartered Accountant | Ramesh Rahalkar |
| Chartered Accountant | SPAK & Co. 172292 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC12501379 | Apr 2025 | Order passed Apr 2025 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report Title search report milind upasani.pdf | 10 July 2026 1 older version on file |
|---|---|
| Conveyance deed Revised Property card.pdf | 7 July 2026 |
| Promoter's declaration, Form B P52100010639_FileName_2.pdf | 17 February 2025 2 older versions on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100010639 |
| Promoter | Milind Ramkrishna Upasani |
| Project type | Residential / Group Housing · Building development |
| Locality | Shivajinagar — Pune City taluka, pincode 411005 |
| Applied on | 31 July 2017 |
| Registered on | 31 August 2017 |
| Completion, as first filed | 15 January 2019 |
| Due | 31 December 2026 8 years later |
| Units declared | 66 |
| Units sold | 13 of 66 sold (20%), 53 still unsold |
| Complaints | 1 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 14 August 2026 |
| Application reference | REA52100015421 |
| Current status | Active |
| Record last changed | 14 August 2026 · 33 days ago |
Where the sold count comes from, and whether it holds up. 13 of 66 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 66 units and reaches the same answer — 13 sold, every one with money recorded as received against a named unit, and 43 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 14 August 2026.
Common questions
- Is Sai Chambers registered with MahaRERA?
- Yes. It is registered as P52100010639, filed on 31 August 2017, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Sai Chambers due to be handed over?
- The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Sai Chambers been delayed?
- Yes. The first date filed was January 2019. It now stands at December 2026, 8 years later.
- What does a unit in Sai Chambers cost?
- Nothing has been registered in this project yet, so it has no price of its own. Across Shivajinagar the median registered rate is ₹25,635 per square foot of carpet, which is the area rather than this building.
- How many units are left in Sai Chambers?
- 43 of 66 were still unsold at the promoter's last filing, in Offices, from 240–424 sq ft of carpet.
- Are there complaints against Sai Chambers?
- 1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Sai Chambers?
- Milind Ramkrishna Upasani, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100010639 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Shivajinagar
Stock image
- Registered here
- ₹5,798
- On offer
- 2, 3 BHK
1 complaint
- Due
- Dec 2027
- Units
- 56
- Carpet
- 585–1,113
- Sold at
- ₹48.2 lakh
Stock image
- Nearby
- ₹21,500
- On offer
- 3 BHK
- Due
- Dec 2027
- Units
- 14
- Carpet
- 1,239–1,299
- Typical flat
- ~₹2.8 crore
Stock image
- Valued from
- ₹17,187
- On offer
- Offices + shops
- Due
- Dec 2028
- Units
- 77
- Carpet
- 90–1,590
- Sold at
- ₹2.3 crore