Z Zomefy

RERA registered PR1260002502943 Active

Preet C

Shivajinagar, Pune · Residential / Group Housing by Gangotree Homes

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Preet C in Shivajinagar is MahaRERA-registered (PR1260002502943) and still under construction, with possession filed for January 2029. No sales are registered in this project yet. Units the same size elsewhere in Shivajinagar have registered at ₹18,914–21,261 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. 1 complaint sits on the filing. Gangotree Homes is the promoter.

Stock image, not a photograph of Preet C Stock image
Where
Shivajinagar
pincode 411003
Nearby at
₹18,914–21,261
per sq ft, same sizes in Shivajinagar
Available
2, 3 BHK
4 left · 847–1,285 sq ft
Now due
Jan 2029
4 months later than first promised
A stock photograph, not Preet C. We have no picture of this site yet.

Where this is

Shivajinagar, PMC, Pune, 411003

Street map of Shivajinagar centred on the coordinate filed for Preet C, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Shivajinagar Bhamburda
Taluka
Pune City
Pincode
411003
Coordinates
18.538793, 73.851073

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 4 flats are filed unit by unit with the authority, the highest on floor 1. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 1 unit · all available

1 unit 847 sq ft 78.73 sq m as filed

3 BHK 3 units · all available

1 unit 978 sq ft 90.83 sq m as filed
1 unit 1121 sq ft 104.1 sq m as filed
1 unit 1285 sq ft 119.41 sq m as filed
Units sold

0 / 4

Pre-launch / early phase

0% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 1 flat · 1 available

847 sq ft carpet as drawn

Carpet, filed
847 sq ft
Built-up
about 1,016 sq ft
Super built-up
about 1,186 sq ft
Every room in this flat

Living and dining about 247 sq ft, Master bedroom about 164 sq ft, Second bedroom about 132 sq ft, Kitchen about 99 sq ft, Bath about 58 sq ft, Balcony about 58 sq ft, Second bath about 49 sq ft, Passage about 41 sq ft.

3 BHK 3 flats · 3 available

978 sq ft carpet as drawn, from 978–1,285 sq ft filed in this configuration

Carpet, filed
978 sq ft
Built-up
about 1,174 sq ft
Super built-up
about 1,369 sq ft
Every room in this flat

Living and dining about 240 sq ft, Master bedroom about 160 sq ft, Second bedroom about 128 sq ft, Third bedroom about 104 sq ft, Kitchen about 96 sq ft, Bath about 56 sq ft, Balcony about 56 sq ft, Second bath about 48 sq ft, Passage about 48 sq ft, Third bath about 40 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What flats like these cost nearby

No sale has been registered at Preet C yet. The promoter has filed no agreement values, so nothing below is this project's own price.

₹18,914–21,261 per sq ft of carpet, median of 49 registered sales of the same configurations in Shivajinagar
On sale here Registered in Shivajinagar Which for this size is
2 BHK 847 sq ft ₹18,914/sq ft 11 sales, 4 projects ₹1.6 crore middle half ₹11,248–27,655/sq ft
3 BHK 978–1,285 sq ft ₹21,261/sq ft 38 sales, 14 projects ₹2.1 crore–₹2.7 crore middle half ₹13,903–25,401/sq ft

Each rate is what buyers contracted to pay for the same configuration in Shivajinagar, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Shivajinagar.

Timeline audit

Original proposed Sep 2028
Current status Due Jan 2029

Revised projection

The completion date has moved from September 2028 to January 2029, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Final Plot No. 36, Plot No. 3, Mumbai-Pune Road, Sangamwadi TPS is the plot this project is built on, as filed
Revenue village Shivajinagar Bhamburda · shown on this site as Shivajinagar
TalukaPune City
Street, as filed Mumbai-Pune Road
Bounded north by Final Plot No. 36 part, Plot No. 1
Bounded east by Final Plot No. 36 part, Plot No. 2
Bounded south by Road
Bounded west by Final Plot No. 36 part, Open Space

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerGangotree Homes
Registered office801-804, Near Karishma Society, Siddharth Tower-1, Sangam Press Road, Kothrud, Pune 411038

Professionals named on the filing

Architect Akshay Digambar Khirodkar 2049
Engineer Tushar Sivarkar
Chartered Accountant Chandorkar & Limaye 166211
Chartered Accountant Phule Wagh & Associates LLP 180704

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

1 case against this project, 0 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
SM12600631 Sep 2026 No order on record

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

18 December 2025 is when an advocate last certified the title to this land
Title report Preet C -RERA Search Report Revised.pdf 18 December 2025
Promoter's declaration, Form B Form B - Developer.pdf 19 December 2025
Annexure A declaration Order 50 ANNEXURE A.pdf 19 December 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPR1260002502943
Promoter Gangotree Homes
Project typeResidential / Group Housing · Building development
LocalityShivajinagar — Pune City taluka, pincode 411003
Applied on30 December 2025
Registered on18 March 2026
Completion, as first filed30 September 2028
Due30 January 2029 4 months later
Units declared4
Units sold None sold yet, all 4 on the market
Complaints1 on record with MahaRERA
Certificate on file Original registration certificate, issued 18 March 2026
Application referenceACK19092503495
Current statusActive
Record last changed 18 March 2026 · 6 months ago

Nothing has sold yet. The promoter's quarterly progress report says none of the 4 flats are gone, and the unit-by-unit list they file separately says the same: all 4 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 18 March 2026.

Common questions

Is Preet C registered with MahaRERA?
Yes. It is registered as PR1260002502943, filed on 18 March 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Preet C due to be handed over?
The promoter has told MahaRERA January 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Preet C been delayed?
Yes. The first date filed was September 2028. It now stands at January 2029, 4 months later.
What does a flat in Preet C cost?
Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Shivajinagar have registered at ₹18,914–21,261 per square foot of carpet — the neighbourhood, not this building.
How many flats are left in Preet C?
4 of 4 were still unsold at the promoter's last filing, in 2, 3 BHK, from 847–1,285 sq ft of carpet.
Are there complaints against Preet C?
1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Preet C?
Gangotree Homes, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for PR1260002502943 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Shivajinagar