RERA registered P52100028904 Active
Profitbay
Sadashiv Peth, Pune · Others by Laxmi Spacecon LLP
Official record Updated from the register 12 September 2026. Anything filed since then is not here yet.
In short
Profitbay in Sadashiv Peth is MahaRERA-registered (P52100028904) and still under construction, with possession filed for December 2026. No sales are registered in this project yet. Units the same size elsewhere in Sadashiv Peth have registered at ₹14,829 per sq ft of carpet — the neighbourhood, not this building. Laxmi Spacecon LLP is the promoter.
- Nearby at
- ₹14,829
- per sq ft, same sizes in Sadashiv Peth
- Available
- 1 Room Kitchen, Office Space, Shops
- 39 left · 220–576 sq ft
- Now due
- Dec 2026
- 1.5 years later than first promised
Where this is
Sadashiv Peth, PMC, Pune, 411030
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Unit sizes on file
All 104 units are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 Room Kitchen 5 units · all available
Office Space 63 units · 32 available
Shops 36 units · 2 available
62 / 104
60% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 Room Kitchen 5 units · 5 available
291 sq ft carpet as drawn, from 291–299 sq ft filed in this configuration
- Carpet, filed
- 291 sq ft
- Built-up
- about 349 sq ft
- Super built-up
- about 407 sq ft
Every room in this unit
Living and sleeping about 175 sq ft, Kitchen about 58 sq ft, Bath about 32 sq ft, Balcony about 26 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What units like these cost nearby
No sale has been registered at Profitbay yet. The promoter has filed no agreement values, so nothing below is this project's own price.
| On sale here | Registered in Sadashiv Peth | Which for this size is |
|---|---|---|
| 1 Room Kitchen 291–299 sq ft | ₹14,829/sq ft 15 sales, 5 projects | ₹43.2 lakh–₹44.3 lakh middle half ₹10,978–17,480/sq ft |
Office Space, Shops are also on sale here, and Sadashiv Peth has not registered enough sales of those to quote a rate for them.
Each rate is what buyers contracted to pay for the same configuration in Sadashiv Peth, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Sadashiv Peth.
The government's valuation of the unsold units
| On sale here | Carpet | Valued at no less than |
|---|---|---|
| 1 Room Kitchen 5 unsold | 291–299 sq ft | ₹22.8 lakh–₹31.6 lakh ₹10,689/sq ft |
| Office Space 32 unsold | 220–576 sq ft | ₹24.3 lakh–₹46.1 lakh ₹10,689/sq ft |
| Shops 2 unsold | 293 sq ft | ₹29.2 lakh–₹55 lakh ₹14,347/sq ft |
This is the Annual Statement of Rates value the promoter filed against each unsold unit — the state's valuation, not an asking price and not a discount. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Revised projection
The completion date has moved from June 2025 to December 2026, 1.5 years later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Pune (M Corp.) · shown on this site as Sadashiv Peth |
|---|---|
| Taluka | Pune City |
| Street, as filed | NARAYAN PETH |
| Bounded north by | CTS 311 328 340 NARAYAN PETH |
| Bounded east by | CTS 340 341 NARAYAN PETH |
| Bounded south by | CTS 309-1 311 328 340 NARAYA PETH |
| Bounded west by | PMC ROAD |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Laxmi Spacecon LLP |
|---|---|
| Registered office | 101 102, Kundan Heritage, Bopodi, Dhl Bopodi, Khadki, Pune 411003 |
| Registered agents | 1 licensed agent may sell this project |
Professionals named on the filing
| Architect | Gautam Attardey CA/2015/67217 |
|---|---|
| Architect | N M Architects And Engineers CA/2015/67217 |
| Engineer | Santosh Bendre |
| Chartered Accountant | ASAK & co. 420681 |
| Chartered Accountant | Agarwal Sarawgi and Associates 306478 |
| Chartered Accountant | Patel And Sharma Chartered Accounants 164398 |
| Chartered Accountant | SBH & Co. 106516 |
| Chartered Accountant | Sachin Sharma 155296 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report First Supplimentary Title Report - 10052025.pdf | 4 June 2025 1 older version on file |
|---|---|
| Promoter's declaration, Form B Form B.PDF | 12 March 2021 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100028904 |
| Promoter | Laxmi Spacecon LLP |
| Project type | Others · Building development |
| Locality | Sadashiv Peth — Pune City taluka, pincode 411030 |
| Applied on | 19 March 2021 |
| Registered on | 07 April 2021 |
| Completion, as first filed | 30 June 2025 |
| Due | 30 December 2026 1.5 years later |
| Units declared | 104 |
| Units sold | 62 of 104 sold (60%), 42 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 12 August 2026 |
| Application reference | REA52100086869 |
| Current status | Active |
| Record last changed | 12 August 2026 · 33 days ago |
Where the sold count comes from, and whether it holds up. 62 of 104 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 62 of 104 sold, leaving 42. The unit-by-unit list they file separately covers 104 units and marks 63 sold with 39 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 12 August 2026.
Common questions
- Is Profitbay registered with MahaRERA?
- Yes. It is registered as P52100028904, filed on 07 April 2021, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Profitbay due to be handed over?
- The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Profitbay been delayed?
- Yes. The first date filed was June 2025. It now stands at December 2026, 1.5 years later.
- What does a unit in Profitbay cost?
- Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Sadashiv Peth have registered at ₹14,829 per square foot of carpet — the neighbourhood, not this building.
- How many units are left in Profitbay?
- 39 of 104 were still unsold at the promoter's last filing, in 1 RK +2 more, from 220–576 sq ft of carpet.
- Are there complaints against Profitbay?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Profitbay?
- Laxmi Spacecon LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 12 September 2026. The authority's own page for P52100028904 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Sadashiv Peth
Stock image
- Nearby
- ₹12,056–16,094
- On offer
- 1, 2, 3 BHK +2 more
- Due
- Dec 2028
- Units
- 33
- Carpet
- 167–730
- Typical unit
- ~₹93.3 lakh
Stock image
- Nearby
- ₹12,056–16,094
- On offer
- 1, 2, 3 BHK
Bageshri Co-Operative Housing Society Ltd
Achalare Realty 7 Landmarks LLP · Sadashiv Peth
- Due
- Jun 2029
- Units
- 28
- Carpet
- 548–1,055
- Typical flat
- ~₹1.5 crore
Stock image
1 complaint
- Due
- Jun 2027
- Units
- —
- Carpet
- —
- Typical unit
- —