RERA registered P52100046894 Active
Seventy 7 Skyway
Ravet, Pune · Mixed by Siddhidata Group
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Seventy 7 Skyway in Ravet is MahaRERA-registered (P52100046894) and still under construction, with possession filed for December 2026. Buyers have already registered 40 sales here at a median ₹670 per sq ft of carpet — not an asking price. Siddhidata Group is the promoter.
- Sold here at
- ₹670
- per sq ft, 40 registered sales
- Available
- 1 BHK, 2 BHK, 3 BHK, Shops
- 63 left · 3,580–9,348 sq ft
- Now due
- Dec 2026
- 1.5 years later than first promised
Where this is
Ravet, PCMC, Pune, 412101
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 143 units are filed unit by unit with the authority, the highest on floor 12. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 48 units · 18 available
2 BHK 69 units · 37 available
3 BHK 22 units · 7 available
22 units have no usable carpet area on file, so they are counted above but not drawn.
Shops 4 units · 1 available
23 / 143
16% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 48 units · 18 available
5,617 sq ft carpet as drawn
- Carpet, filed
- 5,617 sq ft
- Built-up
- about 6,740 sq ft
- Super built-up
- about 7,864 sq ft
Every room in this unit
Living and dining about 2,106 sq ft, Master bedroom about 1,404 sq ft, Kitchen about 843 sq ft, Bath about 491 sq ft, Balcony about 491 sq ft, Passage about 281 sq ft.
2 BHK 69 units · 37 available
7,945 sq ft carpet as drawn, from 7,945–9,348 sq ft filed in this configuration
- Carpet, filed
- 7,945 sq ft
- Built-up
- about 9,534 sq ft
- Super built-up
- about 11,123 sq ft
Every room in this unit
Living and dining about 2,314 sq ft, Master bedroom about 1,543 sq ft, Second bedroom about 1,234 sq ft, Kitchen about 926 sq ft, Bath about 540 sq ft, Balcony about 540 sq ft, Second bath about 463 sq ft, Passage about 386 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹543 to ₹1,546 per sq ft |
|---|---|
| Sold and booked | 51 sold, 0 booked |
| Still available | 63 units, 2778–9348 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. 10 sales are left out of the median because the filed area or price is not credible — the register is typed in by promoters and some entries are wrong. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from June 2025 to December 2026, 1.5 years later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Pimpri Chinchawad (M Corp.) · shown on this site as Ravet |
|---|---|
| Taluka | Haveli |
| Street, as filed | Ravet City Pride School Road |
| Bounded north by | 18 Mtr DP Road |
| Bounded east by | Piesce of survey No 77 part 6 |
| Bounded south by | Remaining Part of Assigners Property |
| Bounded west by | Piece of survey No 77 part 5 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Siddhidata Group |
|---|---|
| Registered office | Plot No 211 Sector 18, Plot 211 Sector 18, Alankar, Sayali Lane, Shivaji Park, Chinchwad Pradhikaran, Pune 411019 |
Professionals named on the filing
| Architect | Techno Arch CA/2007/40376 |
|---|---|
| Engineer | Kiran Vijay Bhosale |
| Chartered Accountant | P S Bora and Co 111988 |
| Chartered Accountant | Pravin Pise 193912 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report legal title with cover letter sky way.pdf | 9 July 2022 |
|---|---|
| Promoter's declaration, Form B Form B Siddhidata Affidavit Cum Declaration.pdf | 14 July 2022 |
| Annexure A declaration Annexure A Layout.pdf | 14 July 2025 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100046894 |
| Promoter | Siddhidata Group |
| Project type | Mixed · Building development |
| Locality | Ravet — Haveli taluka, pincode 412101 |
| Applied on | 11 July 2022 |
| Registered on | 16 September 2022 |
| Completion, as first filed | 30 June 2025 |
| Due | 31 December 2026 1.5 years later |
| Units declared | 143 |
| Units sold | 23 of 143 sold (16%), 120 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 13 August 2026 |
| Application reference | REA52100115185 |
| Current status | Active |
| Record last changed | 12 August 2026 · 2 months ago |
Where the sold count comes from, and whether it holds up. 23 of 143 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 23 of 143 sold, leaving 120. The unit-by-unit list they file separately covers 143 units and marks 51 sold with 63 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 12 August 2026.
Common questions
- Is Seventy 7 Skyway registered with MahaRERA?
- Yes. It is registered as P52100046894, filed on 16 September 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Seventy 7 Skyway due to be handed over?
- The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Seventy 7 Skyway been delayed?
- Yes. The first date filed was June 2025. It now stands at December 2026, 1.5 years later.
- What did buyers actually pay in Seventy 7 Skyway?
- A median of ₹670 per square foot of carpet, across 40 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Seventy 7 Skyway?
- 63 of 143 were still unsold at the promoter's last filing, in 1, 2, 3 BHK + shops, from 3,580–9,348 sq ft of carpet.
- Are there complaints against Seventy 7 Skyway?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Seventy 7 Skyway?
- Siddhidata Group, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100046894 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Ravet
Stock image
- Registered here
- ₹10,964
- On offer
- 2, 3 BHK
- Due
- Apr 2029
- Units
- 344
- Carpet
- 706–1,022
- Sold at
- ₹79.7 lakh
Stock image
- Nearby
- ₹5,515–8,695
- On offer
- 1, 2, 3 BHK
- Due
- Jul 2030
- Units
- 207
- Carpet
- 563–1,034
- Typical flat
- ~₹52.5 lakh
Stock image
- Registered here
- ₹10,477
- On offer
- 1, 2 BHK
- Due
- Oct 2027
- Units
- 76
- Carpet
- 382–713
- Sold at
- ₹68.9 lakh