Z Zomefy

RERA registered P52100046261 Active

Bramha Sky Uzuri Phase 2

Pimpri, Pune · Commercial by Bramha Leisures Pvt Ltd

Official record Updated from the register 30 October 2026. Anything filed since then is not here yet.

In short

Bramha Sky Uzuri Phase 2 in Pimpri is MahaRERA-registered (P52100046261) and still under construction, with possession filed for December 2027. No registered sales are on file here yet. The government values the units from ₹7,592 per sq ft of carpet, a stamp-duty floor rather than a market price. About 60% of the 315 units are sold. Bramha Leisures Pvt Ltd is the promoter.

Stock image, not a photograph of Bramha Sky Uzuri Phase 2 Stock image
Where
Pimpri
pincode 411018
Valued from
₹7,592
per sq ft, the government’s floor
Available
Office Space, Shops
126 left · 200–740 sq ft
Possession
Dec 2027
as filed with MahaRERA
A stock photograph, not Bramha Sky Uzuri Phase 2. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Pimpri Chinchawad (M Corp.) · Haveli

Pimpri, Pune, 411018

Village Pimpri Chinchawad (M Corp.)
Taluka Haveli
Pincode 411018
Promoter Pin Coordinates 18.606902, 73.799263

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 315 units are filed unit by unit with the authority, the highest on floor 11. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Nothing filed here is a home. Every unit is registered as non-residential — shops, offices or similar — which is the promoter's own answer on the register rather than anything read off the areas below.

Configuration Mix & Volume Proportional share of project density
315 Total Licenced Units
Dominant Typology • 88.6% of tower

Office Space Suite

108 Available 279 registered total
State Min Valuation ₹18.8 lakh – ₹56.2 lakh
ASR Govt Rate ₹7,592 / sq ft
Carpet Variations as Filed Span: 247 to 740 sq ft
247 sq ft 22.97 sq m 20 units
258 sq ft 23.97 sq m 20 units
261 sq ft 24.29 sq m 22 units
269 sq ft 25.02 sq m 1 unit
270 sq ft 25.07 sq m 10 units
271 sq ft 25.19 sq m 31 units
285 sq ft 26.46 sq m 11 units
286 sq ft 26.55 sq m 11 units
291 sq ft 27.04 sq m 23 units
348 sq ft 32.36 sq m 22 units
359 sq ft 33.32 sq m 22 units
367 sq ft 34.14 sq m 43 units
396 sq ft 36.83 sq m 22 units
714 sq ft 66.31 sq m 10 units
740 sq ft 68.78 sq m 11 units
Govt ASR Base: ₹18.8 lakh – ₹56.2 lakh 108 of 279 available
Commercial Footprint • 11.4% of project

Shops Suite

18 Available 36 registered total
State Min Valuation ₹20.2 lakh – ₹43.7 lakh
ASR Govt Rate ₹10,097 / sq ft
Carpet Variations as Filed Span: 200 to 433 sq ft
200 sq ft 18.61 sq m 2 units
220 sq ft 20.41 sq m 4 units
239 sq ft 22.21 sq m 6 units
253 sq ft 23.55 sq m 1 unit
278 sq ft 25.83 sq m 2 units
281 sq ft 26.08 sq m 1 unit
291 sq ft 26.99 sq m 2 units
299 sq ft 27.8 sq m 4 units
303 sq ft 28.12 sq m 3 units
327 sq ft 30.41 sq m 1 unit
328 sq ft 30.44 sq m 1 unit
335 sq ft 31.15 sq m 2 units
349 sq ft 32.46 sq m 1 unit
368 sq ft 34.18 sq m 1 unit
378 sq ft 35.13 sq m 1 unit
379 sq ft 35.2 sq m 1 unit
383 sq ft 35.59 sq m 1 unit
415 sq ft 38.52 sq m 1 unit
433 sq ft 40.19 sq m 1 unit
Govt ASR Base: ₹20.2 lakh – ₹43.7 lakh 18 of 36 available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
Office Space 247 – 740 sq ft (22.97 – 68.78 sq m) ~296 – 888 sq ft ~346 – 1036 sq ft 108 left of 279
Shops 200 – 433 sq ft (18.61 – 40.19 sq m) ~240 – 520 sq ft ~280 – 606 sq ft 18 left of 36
Units sold

189 / 315

Selling steadily

60% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Footprints, not plans. What is registered here is sold as a shell, and the register files its area and nothing else — so each box below is one unit's filed carpet area, drawn to its size against the largest one here, and it says nothing about how the space is divided up.

Office Space 279 units · 108 available

367 sq ft carpet as drawn, from 247–740 sq ft filed in this configuration

Carpet, filed
367 sq ft
Built-up
about 440 sq ft
Super built-up
about 514 sq ft

Shops 36 units · 18 available

239 sq ft carpet as drawn, from 200–433 sq ft filed in this configuration

Carpet, filed
239 sq ft
Built-up
about 287 sq ft
Super built-up
about 335 sq ft

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What these units are valued at

No sale has been registered at Bramha Sky Uzuri Phase 2 yet. The promoter has filed no agreement values, so nothing below is this project's own price.

On sale here Carpet Valued at no less than
Office Space 108 unsold 247–740 sq ft ₹18.8 lakh–₹56.2 lakh ₹7,592/sq ft
Shops 18 unsold 200–433 sq ft ₹20.2 lakh–₹43.7 lakh ₹10,097/sq ft

This is the Annual Statement of Rates value the promoter filed against each unsold unit — the state's valuation, not an asking price and not a discount. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State On Scheduled Baseline
Original Baseline
Dec 2027
Declared at registration
Current Statutory Date
Due
Dec 2027
Identical to original baseline

Stable delivery projection

Stable project schedule. Zero slippage or revision requests reported since initial registration. Construction is recorded against the original baseline date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

CTS NO.4702, SR. NO.209/A/2 AT VILLAGE PIMPRI WAGHERE is the plot this project is built on, as filed
Revenue village Pimpri Chinchawad (M Corp.) · shown on this site as Pimpri
TalukaHaveli
Street, as filed Pimpri Gaon
Bounded north by BY PUNE MUMBAI ROAD
Bounded east by BY CTS NO- 4702CTS NO 4705
Bounded south by BY REMAINING PLOTS OUT OF LAYOUT S NO209A2 CTS4702
Bounded west by BY INTERNAL 9 MEETER ROAD

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerBramha Leisures Pvt Ltd
Registered office250 251, Bramha House, M.G. Road, Near Kohinoor Restrautant, Camp Pune, Pune 411001
Registered agents 12 licensed agents may sell this project

Professionals named on the filing

Architect Cubix Architects Associates ca/2001/28514
Engineer Cubix Architects Associates
Chartered Accountant ASAK & co 420681
Chartered Accountant Patel and Sharma Chartered Accountants 164398

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

29 April 2024 is when an advocate last certified the title to this land
Title report Search and Title Report 27-04-2024_compressed.pdf 29 April 2024 1 older version on file
Promoter's declaration, Form B Form B Sky Uzuri Phase 2.pdf 10 May 2024 1 older version on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100046261
Promoter Bramha Leisures Pvt Ltd
Project typeCommercial · Building development
LocalityPimpri — Haveli taluka, pincode 411018
Applied on16 June 2022
Registered on20 June 2022
Completion, as first filed31 December 2027
Due31 December 2027
Units declared315
Units sold 189 of 315 sold (60%), 126 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 06 May 2024
Application referenceREA52100113849
Current statusActive
Record last changed 27 April 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 189 of 315 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 315 units and reaches the same answer — 111 sold, 109 of them with money recorded as received against a named unit, 78 booked with a price agreed but nothing received yet, and 126 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 27 April 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 7 Direct Answers
Is Bramha Sky Uzuri Phase 2 registered with MahaRERA?
Yes. It is registered as P52100046261, filed on 20 June 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Bramha Sky Uzuri Phase 2 due to be handed over?
The promoter has told MahaRERA December 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Bramha Sky Uzuri Phase 2 been delayed?
No. December 2027 is the date first filed with the authority and it has not moved since.
What does a unit in Bramha Sky Uzuri Phase 2 cost?
Nothing has been registered here yet. The government values the units at ₹7,592 per square foot of carpet, which is the floor stamp duty is charged on and is normally below what anyone pays.
How many units are left in Bramha Sky Uzuri Phase 2?
126 of 315 were still unsold at the promoter's last filing, in Offices + shops, from 200–740 sq ft of carpet.
Are there complaints against Bramha Sky Uzuri Phase 2?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Bramha Sky Uzuri Phase 2?
Bramha Leisures Pvt Ltd, as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 30 October 2026. The authority's own registry page for P52100046261 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Pimpri

Stock image, not a photograph of Manikbaug Orchid Stock image
Nearby
₹10,358
On offer
2 BHK + shops
Under construction

Manikbaug Orchid

Waghere Promoters · Pimpri

0 sold
Due
Dec 2031
Units
218
Carpet
195–859
Typical unit
~₹79.8 lakh
P52100010235