Z Zomefy

RERA registered PR1260002500154 Active

Mahindra Citadel - Tower L

Pimpri, Pune · Residential / Group Housing by Mahindra Lifespace Developers limited

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Mahindra Citadel - Tower L in Pimpri is MahaRERA-registered (PR1260002500154) and still under construction, with possession filed for April 2031. Buyers have already registered 132 sales here at a median ₹13,140 per sq ft of carpet — not an asking price. About 63% of the 211 units are sold. Mahindra Lifespace Developers limited is the promoter.

Stock image, not a photograph of Mahindra Citadel - Tower L Stock image
Where
Pimpri
pincode 411018
Sold here at
₹13,140
per sq ft, 132 registered sales
Available
1 BHK
79 left · 465 sq ft
Now due
Apr 2031
4 months later than first promised
A stock photograph, not Mahindra Citadel - Tower L. We have no picture of this site yet.

Where this is

Pimpri, Pune, 411018

Street map of Pimpri centred on the coordinate filed for Mahindra Citadel - Tower L, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Pimpri Chinchawad (M Corp.)
Taluka
Haveli
Pincode
411018
Coordinates
18.616513, 73.813241

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 211 flats are filed unit by unit with the authority, the highest on floor 14. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 211 units · 79 available

211 units 465 sq ft 43.16 sq m as filed
Units sold

132 / 211

Selling steadily

63% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 211 flats · 79 available

465 sq ft carpet as drawn

Carpet, filed
465 sq ft
Built-up
about 558 sq ft
Super built-up
about 651 sq ft
Every room in this flat

Living and dining about 174 sq ft, Master bedroom about 116 sq ft, Kitchen about 70 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Passage about 23 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹13,140 per sq ft of carpet, median of 132 registered sales
Range across those sales ₹11,639 to ₹15,692 per sq ft
Sold and booked 115 sold, 17 booked
Still available 79 flats, 465 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2030
Current status Due Apr 2031

Revised projection

The completion date has moved from December 2030 to April 2031, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

CTS No. 4854, Sub-Plot A is the plot this project is built on, as filed
Revenue village Pimpri Chinchawad (M Corp.) · shown on this site as Pimpri
TalukaHaveli
Street, as filed CTS No. 4854, Sub-Plot A, situate at Village Pimpri Waghere
Bounded north by Part of Land bearing CTS No 4854 Sub plot A
Bounded east by Part of Land bearing CTS No 4854 Sub plot A
Bounded south by Part of Land bearing CTS No 4854 Sub plot A
Bounded west by Part of Land bearing CTS No 4854 Sub plot A

All four boundaries are filed as the same thing, which satisfies the form without locating the plot. It is not a warning about the project — the survey number above does the locating — but it does mean the four rows here tell you one fact rather than four.

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerMahindra Lifespace Developers limited
Registered office4th Floor, 4, Mahindra Towers, G.M Bhosale Marg, Near Doordarshan, Worli, Mumbai City 400018

Professionals named on the filing

Architect Sankalp Designers CA/2001/28447
Engineer K C Shah Designs LLP STR/S/270
Engineer Shrikant Porje AM181190-0
Engineer Sachin Khot
Chartered Accountant P G Bhagwat LLP 109795

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

24 June 2025 is when an advocate last certified the title to this land
Title report Title report.pdf 24 June 2025
Conveyance deed Conveyance Deed 6509 of 2022 Pimpri CTS 4854 dated 18042022.pdf 11 June 2025
Promoter's declaration, Form B Form B Citadel Tower L.pdf 11 June 2025
Annexure A declaration Declaration cum Undertaking Order 50 11062025.pdf 12 June 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPR1260002500154
Promoter Mahindra Lifespace Developers limited
Project typeResidential / Group Housing · Building development
LocalityPimpri — Haveli taluka, pincode 411018
Applied on12 June 2025
Registered on30 June 2025
Completion, as first filed31 December 2030
Due30 April 2031 4 months later
Units declared211
Units sold 132 of 211 sold (63%), 79 still unsold
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 17 February 2026
Application referenceACK11062501165
Current statusActive
Record last changed 20 November 2025 · 10 months ago

Where the sold count comes from, and whether it holds up. 132 of 211 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 211 flats and reaches the same answer — 115 sold, every one with money recorded as received against a named flat, 17 booked with a price agreed but nothing received yet, and 79 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 20 November 2025.

Common questions

Is Mahindra Citadel - Tower L registered with MahaRERA?
Yes. It is registered as PR1260002500154, filed on 30 June 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Mahindra Citadel - Tower L due to be handed over?
The promoter has told MahaRERA April 2031. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Mahindra Citadel - Tower L been delayed?
Yes. The first date filed was December 2030. It now stands at April 2031, 4 months later.
What did buyers actually pay in Mahindra Citadel - Tower L?
A median of ₹13,140 per square foot of carpet, across 132 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Mahindra Citadel - Tower L?
79 of 211 were still unsold at the promoter's last filing, in 1 BHK, from 465 sq ft of carpet.
Are there complaints against Mahindra Citadel - Tower L?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Mahindra Citadel - Tower L?
Mahindra Lifespace Developers limited, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for PR1260002500154 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Pimpri

Stock image, not a photograph of Lords Stock image
Nearby
₹10,424
On offer
2 BHK +2 more
New launch

Lords

Sairaj Spaces · Pimpri

0 sold
Slipped 4 months
Due
Apr 2030
Units
16
Carpet
135–596
Typical unit
~₹34.4 lakh
PM1260002601246