Z Zomefy

RERA registered P52100077495 Active

Sanjog Residency

Pimple Nilakh, Pune · Residential / Group Housing by DVM Constructions

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Sanjog Residency in Pimple Nilakh is MahaRERA-registered (P52100077495) and still under construction, with possession filed for April 2028. No sales are registered in this project yet. Units the same size elsewhere in Pimple Nilakh have registered at ₹10,584–15,824 per sq ft of carpet — the neighbourhood, not this building. About 8% of the 12 units are sold. DVM Constructions is the promoter.

Stock image, not a photograph of Sanjog Residency Stock image
Where
Pimple Nilakh
pincode 411027
Nearby at
₹10,584–15,824
per sq ft, same sizes in Pimple Nilakh
Available
1, 2, 3 BHK
11 left · 451–817 sq ft
Now due
Apr 2028
2.3 years later than first promised
A stock photograph, not Sanjog Residency. We have no picture of this site yet.

Where this is

Pimple Nilakh, PCMC, Pune, 411027

Street map of Pimple Nilakh centred on the coordinate filed for Sanjog Residency, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Pimple Nilakh
Taluka
Haveli
Pincode
411027
Coordinates
18.619108, 73.804796

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 12 flats are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 1 unit · all available

1 unit 451 sq ft 41.88 sq m as filed

2 BHK 8 units · 7 available

8 units 518 sq ft 48.15 sq m as filed

3 BHK 3 units · all available

3 units 817 sq ft 75.89 sq m as filed
Units sold

1 / 12

Early sales

8% absorption rate

Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 1 flat · 1 available

451 sq ft carpet as drawn

Carpet, filed
451 sq ft
Built-up
about 541 sq ft
Super built-up
about 631 sq ft
Every room in this flat

Living and dining about 169 sq ft, Master bedroom about 113 sq ft, Kitchen about 68 sq ft, Bath about 39 sq ft, Balcony about 39 sq ft, Passage about 23 sq ft.

2 BHK 8 flats · 7 available

518 sq ft carpet as drawn

Carpet, filed
518 sq ft
Built-up
about 622 sq ft
Super built-up
about 725 sq ft
Every room in this flat

Living and dining about 151 sq ft, Master bedroom about 101 sq ft, Second bedroom about 80 sq ft, Kitchen about 60 sq ft, Bath about 35 sq ft, Balcony about 35 sq ft, Second bath about 30 sq ft, Passage about 25 sq ft.

3 BHK 3 flats · 3 available

817 sq ft carpet as drawn

Carpet, filed
817 sq ft
Built-up
about 980 sq ft
Super built-up
about 1,144 sq ft
Every room in this flat

Living and dining about 201 sq ft, Master bedroom about 134 sq ft, Second bedroom about 107 sq ft, Third bedroom about 87 sq ft, Kitchen about 80 sq ft, Bath about 47 sq ft, Balcony about 47 sq ft, Second bath about 40 sq ft, Passage about 40 sq ft, Third bath about 33 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What flats like these cost nearby

No sale has been registered at Sanjog Residency yet. The promoter has filed no agreement values, so nothing below is this project's own price.

₹10,584–15,824 per sq ft of carpet, median of 506 registered sales of the same configurations in Pimple Nilakh
On sale here Registered in Pimple Nilakh Which for this size is
1 BHK 451 sq ft ₹10,584/sq ft 13 sales, 3 projects ₹47.7 lakh middle half ₹7,611–11,061/sq ft
2 BHK 518 sq ft ₹11,303/sq ft 321 sales, 12 projects ₹58.5 lakh middle half ₹8,896–13,137/sq ft
3 BHK 817 sq ft ₹15,824/sq ft 172 sales, 10 projects ₹1.3 crore middle half ₹11,815–17,572/sq ft

Each rate is what buyers contracted to pay for the same configuration in Pimple Nilakh, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Pimple Nilakh.

The state values these at ₹5,378 per sq ft of carpet — one rate across all 11 still available, which puts the smallest at ₹24.2 lakh and the largest at ₹43.9 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Timeline audit

Original proposed Dec 2025
Current status Due Apr 2028

Revised projection

The completion date has moved from December 2025 to April 2028, 2.3 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

16/40, 16/41, CTS No. 864P, Pimple Nilakh is the plot this project is built on, as filed
Revenue village Pimple Nilakh
TalukaHaveli
Street, as filed Survey No 16/40, 16/41, CTS No. 864 of village. Pimple Nilakh , Taluka –Haveli, Dist – Pune – 411027.
Bounded north by Plot No 4
Bounded east by Survey No 16 1 to 5 and 5 5
Bounded south by Plot No 4 in the Layout
Bounded west by Road and Survey No 17 2-1

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerDVM Constructions
Registered officeS No. 1170/31/1A, 1170, Silver Leaf, Shaligram Road, Revenue Colony, Shaligram Road, Shivajinagar, Pune 411005

Professionals named on the filing

Architect Yojana Architects CA/87/10510
Engineer Rajesh Tank NA
Engineer Rohinee Engineer PCMC/LE/0651/2017
Chartered Accountant CA Vaibhav S Bhise 608997
Chartered Accountant Dattatraya Kusumkar 185294
Chartered Accountant Pravin Pise and Associates 193912

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

2 April 2024 is when an advocate last certified the title to this land
Title report Legal Search reporet Final.pdf 2 April 2024 1 older version on file
Promoter's declaration, Form B Form B NEW.pdf 2 April 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100077495
Promoter DVM Constructions
Project typeResidential / Group Housing · Building development
LocalityPimple Nilakh — Haveli taluka, pincode 411027
Applied on23 April 2024
Registered on20 August 2024
Completion, as first filed31 December 2025
Due30 April 2028 2.3 years later
Units declared12
Units sold 1 of 12 sold (8%), 11 still unsold
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 19 August 2026
Application referenceREA52100157503
Current statusActive
Record last changed 12 March 2026 · 7 months ago

Where the sold count comes from, and whether it holds up. 1 of 12 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 12 flats and reaches the same answer — 1 sold, every one with money recorded as received against a named flat, and 11 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 12 March 2026.

Common questions

Is Sanjog Residency registered with MahaRERA?
Yes. It is registered as P52100077495, filed on 20 August 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Sanjog Residency due to be handed over?
The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Sanjog Residency been delayed?
Yes. The first date filed was December 2025. It now stands at April 2028, 2.3 years later.
What does a flat in Sanjog Residency cost?
Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Pimple Nilakh have registered at ₹10,584–15,824 per square foot of carpet — the neighbourhood, not this building.
How many flats are left in Sanjog Residency?
11 of 12 were still unsold at the promoter's last filing, in 1, 2, 3 BHK, from 451–817 sq ft of carpet.
Are there complaints against Sanjog Residency?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Sanjog Residency?
DVM Constructions, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100077495 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Pimple Nilakh

Stock image, not a photograph of Avanta Stock image
Valued from
₹7,445
On offer
Offices + shops
Under construction

Avanta

Punamiya Properties LLP · Pimple Nilakh

17 sold
Slipped 4 months
Due
Apr 2027
Units
18
Carpet
630–1,612
Typical unit
~₹62.1 lakh
PC1260002500973
Stock image, not a photograph of Cullinan Stock image
Valued from
₹8,092
On offer
Offices + shops
Under construction

Cullinan

M/s Garve Corporation · Pimple Nilakh

12 sold

2 complaints

Slipped 4 months
Due
Apr 2030
Units
96
Carpet
210–1,747
Sold at
₹74 lakh
P52100078994
Stock image, not a photograph of Elara Stock image
Nearby
₹11,303–15,824
On offer
2, 3 BHK
Under construction

Elara

Regenesis Project Management LLP · Pimple Nilakh

0 sold
Slipped 4 months
Due
Oct 2029
Units
16
Carpet
855–1,559
Typical flat
~₹1.5 crore
P52100080060