RERA registered P52100052593 Active
Ashiana Malhar Phase II
Marunji, Pune · Residential / Group Housing by Ashiana Housing Limited
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Ashiana Malhar Phase II in Marunji is MahaRERA-registered (P52100052593) and still under construction, with possession filed for May 2027. Buyers have already registered 211 sales here at a median ₹9,082 per sq ft of carpet — not an asking price. About 96% of the 220 units are sold. Ashiana Housing Limited is the promoter.
- Sold here at
- ₹9,082
- per sq ft, 211 registered sales
- Available
- 2, 3 BHK
- 9 left · 751–948 sq ft
- Possession
- May 2027
- as filed with MahaRERA
Where this is
Marunji, PMRDA, Pune, 411057
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 220 flats are filed unit by unit with the authority, the highest on floor 14. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 160 units · 1 available
3 BHK 60 units · 8 available
211 / 220
96% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 160 flats · 1 available
751 sq ft carpet as drawn, from 645–751 sq ft filed in this configuration
- Carpet, filed
- 751 sq ft
- Built-up
- about 901 sq ft
- Super built-up
- about 1,051 sq ft
Every room in this flat
Living and dining about 219 sq ft, Master bedroom about 146 sq ft, Second bedroom about 117 sq ft, Kitchen about 87 sq ft, Bath about 51 sq ft, Balcony about 51 sq ft, Second bath about 44 sq ft, Passage about 36 sq ft.
3 BHK 60 flats · 8 available
948 sq ft carpet as drawn, from 948–1,122 sq ft filed in this configuration
- Carpet, filed
- 948 sq ft
- Built-up
- about 1,138 sq ft
- Super built-up
- about 1,327 sq ft
Every room in this flat
Living and dining about 233 sq ft, Master bedroom about 155 sq ft, Second bedroom about 124 sq ft, Third bedroom about 101 sq ft, Kitchen about 93 sq ft, Bath about 54 sq ft, Balcony about 54 sq ft, Second bath about 47 sq ft, Passage about 47 sq ft, Third bath about 39 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹7,638 to ₹10,856 per sq ft |
|---|---|
| Sold and booked | 211 sold, 0 booked |
| Still available | 9 flats, 645–1122 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Marunji |
|---|---|
| Taluka | Mulshi |
| Street, as filed | Marunji Road |
| Bounded north by | T- 4 |
| Bounded east by | 78 P |
| Bounded south by | 76 2 |
| Bounded west by | 77 P |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Ashiana Housing Limited |
|---|---|
| Registered office | R-1, Flat R-1, Tucker Awho Enclave, Gondhalenagar, Hadapsar, Pune 411028 |
Professionals named on the filing
| Architect | Mangesh Gotal CA/2005/36501 |
|---|---|
| Architect | Sanjeev Mehta CA/94/17147 |
| Engineer | Dheeraj Agarwal 09E1ELCEM40P012 |
| Engineer | Dheeraj Agrawal 09E1ELCEM40P012 |
| Engineer | Enviro Analysts & Engineers Pvt. Ltd. NABET/EIA/2124/SA 0193 |
| Engineer | MS JW consultant LLP PMRDA/STR.ENG/373/2024-26 |
| Engineer | Ramshankar Sharma 09/224698 |
| Engineer | Sagar Kale |
| Engineer | Yogesh Kapoor CA/92/15195 |
| Chartered Accountant | B.Chhawchharia & Co. 529082 |
| Chartered Accountant | SAC & Co LLP 154711 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Title Report Ashiana Malhar Phase-II_compressed.pdf | 18 July 2023 |
|---|---|
| Promoter's declaration, Form B Declaration Form - B Malhar Phase II.pdf | 4 July 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100052593 |
| Promoter | Ashiana Housing Limited |
| Project type | Residential / Group Housing · Building development |
| Locality | Marunji — Mulshi taluka, pincode 411057 |
| Applied on | 18 July 2023 |
| Registered on | 11 September 2023 |
| Completion, as first filed | 31 May 2027 |
| Due | 31 May 2027 |
| Units declared | 220 |
| Units sold | 211 of 220 sold (96%), 9 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 11 September 2023 |
| Application reference | REA52100142391 |
| Current status | Active |
| Record last changed | 11 September 2023 · over 3 years ago 3 years untouched |
Where the sold count comes from, and whether it holds up. 211 of 220 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 220 flats and reaches the same answer — 211 sold, every one with money recorded as received against a named flat, and 9 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 11 September 2023.
MahaRERA has not recorded a change to this project's record in 3 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.
Common questions
- Is Ashiana Malhar Phase II registered with MahaRERA?
- Yes. It is registered as P52100052593, filed on 11 September 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Ashiana Malhar Phase II due to be handed over?
- The promoter has told MahaRERA May 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Ashiana Malhar Phase II been delayed?
- No. May 2027 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Ashiana Malhar Phase II?
- A median of ₹9,082 per square foot of carpet, across 211 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Ashiana Malhar Phase II?
- 9 of 220 were still unsold at the promoter's last filing, in 2, 3 BHK, from 751–948 sq ft of carpet.
- Are there complaints against Ashiana Malhar Phase II?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Ashiana Malhar Phase II?
- Ashiana Housing Limited, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100052593 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Marunji
Stock image
- Registered here
- ₹11,250
- On offer
- 2, 3 BHK
- Due
- Sep 2029
- Units
- 110
- Carpet
- 645–1,122
- Sold at
- ₹74.1 lakh
Stock image
- Registered here
- ₹11,606
- On offer
- 1 RK
- Was due
- Aug 2026
- Units
- 330
- Carpet
- 191
- Sold at
- ₹20.8 lakh
Stock image
- Due
- Dec 2028
- Units
- 16
- Carpet
- —
- Typical unit
- —