ISLE OF LIFE - BUILDING B and C

Marunji, Pune · Residential / Group Housing by R R Ventures

Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.

In short

ISLE OF LIFE - BUILDING B and C in Marunji is MahaRERA-registered (P52100055011). Possession was filed for August 2026, and that date has passed without a handover on the register. Buyers have already registered 329 sales here at a median ₹11,606 per sq ft of carpet — not an asking price. R R Ventures is the promoter.

Stock image, not a photograph of ISLE OF LIFE - BUILDING B and C Stock image
Where
Marunji
pincode 411033
Sold here at
₹11,606
per sq ft, 329 registered sales
Available
1 Room Kitchen
1 left · 191 sq ft
Was due
Aug 2026
16 days past its date, not handed over
A stock photograph, not ISLE OF LIFE - BUILDING B and C. We have no picture of this site yet.

Where this is

Marunji, PMRDA, Pune, 411033

Village
Marunji
Taluka
Mulshi
Pincode
411033

The promoter filed a coordinate that falls outside Pune district, so it is not used here. The link above searches Maps by name and locality instead.

Flat sizes on file

All 330 flats are filed unit by unit with the authority, the highest on floor 8. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

The largest flat here is filed at 17.7 sq m, about 191 sq ft. That is studio scale, not a one- or two-bedroom flat.

1 Room Kitchen 330 units · 1 available

255 units 176 sq ft 16.38 sq m as filed
75 units 191 sq ft 17.7 sq m as filed
Units sold

249 / 330

Selling steadily

75% absorption rate · the promoter's two filings disagree

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 Room Kitchen 330 flats · 1 available

176 sq ft carpet as drawn, from 176–191 sq ft filed in this configuration

Carpet, filed
176 sq ft
Built-up
about 211 sq ft
Super built-up
about 246 sq ft
Every room in this flat

Living and sleeping about 106 sq ft, Kitchen about 35 sq ft, Bath about 19 sq ft, Balcony about 16 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹11,606 per sq ft of carpet, median of 329 registered sales
Range across those sales ₹10,692 to ₹13,917 per sq ft
Sold and booked 329 sold, 0 booked
Still available 1 flat, 176–191 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Aug 2025
Current status Was due Aug 2026

Revised projection

The completion date has moved from August 2025 to August 2026, a year later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Survey No. 42/1, 42/2, 42/4, 42/5, 43/1/1, 43/1/2, 43/1/3, 43/1/4, 43/2/1, 43/2/2, 43/2/3, Plot A is the plot this project is built on, as filed
Revenue village Marunji
TalukaMulshi
Street, as filed Survey No. 42/1, 42/2, 42/4, 42/5, 43/1/1, 43/1/2, 43/1/3, 43/1/4, 43/2/2, 43/2/3,
Bounded north by Plot B
Bounded east by Survey No 42 3
Bounded south by 12 M Wide Road
Bounded west by Survey No 51

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerR R Ventures
Registered officeOffice No 01 To 05, Millennium Star, Dhole Patil Road, Near Ruby Hall Clinic, Pune 411001

Professionals named on the filing

Architect Vka Architecture CA/84/8465
Engineer Dattatray Gaikwad
Engineer Pankaj Somvanshi REG/PMC/STE/0863/15
Engineer Spectrum Consultants : Parag Chopada
Chartered Accountant ASAK & Co 420681
Chartered Accountant Agarwal Sarawgi and Associate 306478
Chartered Accountant Patel & Sharma 164398

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

27 December 2023 is when an advocate last certified the title to this land
Title report मारुंजी_Satbara Merged.pdf 27 December 2023 1 older version on file
Promoter's declaration, Form B Form B Notarised.PDF 6 February 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100055011
Promoter R R Ventures
Project typeResidential / Group Housing · Building development
LocalityMarunji — Mulshi taluka, pincode 411033
Applied on27 December 2023
Registered on26 February 2024
Completion, as first filed31 August 2025
Was due31 August 2026 a year later
Units declared330
Units sold 249 of 330 sold (75%), 81 still unsoldfilings disagree
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 14 August 2026
Application referenceREA52100151347
Current statusActive
Record last changed 01 July 2025 · 15 months ago

Where the sold count comes from, and whether it holds up. 249 of 330 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 249 of 330 sold, leaving 81. The unit-by-unit list they file separately covers 330 flats and marks 329 sold with 1 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 01 July 2025.

Common questions

Is ISLE OF LIFE - BUILDING B and C registered with MahaRERA?
Yes. It is registered as P52100055011, filed on 26 February 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When was ISLE OF LIFE - BUILDING B and C due to be handed over?
August 2026, and that date has passed without a handover being filed — 16 days ago. Section 18 of the Act gives an allottee a remedy when a promoter misses the date in the agreement.
What did buyers actually pay in ISLE OF LIFE - BUILDING B and C?
A median of ₹11,606 per square foot of carpet, across 329 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in ISLE OF LIFE - BUILDING B and C?
1 of 330 were still unsold at the promoter's last filing, in 1 RK, from 191 sq ft of carpet.
Are there complaints against ISLE OF LIFE - BUILDING B and C?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building ISLE OF LIFE - BUILDING B and C?
R R Ventures, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100055011 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.