Z Zomefy

RERA registered P52100045848 Active

VTP Euphoria Phase 2

Manjari Khurd, Pune · Residential / Group Housing by Ashdan Developers Private Limited

Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.

In short

VTP Euphoria Phase 2 in Manjari Khurd is MahaRERA-registered (P52100045848) and still under construction, with possession filed for June 2027. Buyers have already registered 357 sales here at a median ₹10,923 per sq ft of carpet — not an asking price. About 99% of the 360 units are sold. 19 complaints sit on the filing. Ashdan Developers Private Limited is the promoter.

Stock image, not a photograph of VTP Euphoria Phase 2 Stock image
Where
Manjari Khurd
pincode 412307
Sold here at
₹10,923
per sq ft, 357 registered sales
Available
2 BHK
3 left · 659–663 sq ft
Possession
Jun 2027
as filed with MahaRERA
A stock photograph, not VTP Euphoria Phase 2. We have no picture of this site yet.

Where this is

Manjari Khurd, PMRDA, Pune, 412307

Village
MANJARI KH
Taluka
Haveli
Pincode
412307

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 360 flats are filed unit by unit with the authority, the highest on floor 30. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 120 units · 3 available

60 units 659 sq ft 61.19 sq m as filed
60 units 663 sq ft 61.59 sq m as filed

3 BHK 240 units · all sold

30 units 968 sq ft 89.91 sq m as filed
30 units 972 sq ft 90.28 sq m as filed
30 units 973 sq ft 90.35 sq m as filed
30 units 977 sq ft 90.72 sq m as filed
120 units 1126 sq ft 104.59 sq m as filed
Units sold

357 / 360

Nearly sold out

99% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 120 flats · 3 available

659 sq ft carpet as drawn, from 659–663 sq ft filed in this configuration

Carpet, filed
659 sq ft
Built-up
about 791 sq ft
Super built-up
about 923 sq ft
Every room in this flat

Living and dining about 192 sq ft, Master bedroom about 128 sq ft, Second bedroom about 102 sq ft, Kitchen about 77 sq ft, Bath about 45 sq ft, Balcony about 45 sq ft, Second bath about 38 sq ft, Passage about 32 sq ft.

3 BHK 240 flats · none available

1,126 sq ft carpet as drawn, from 968–1,126 sq ft filed in this configuration

Carpet, filed
1,126 sq ft
Built-up
about 1,351 sq ft
Super built-up
about 1,576 sq ft
Every room in this flat

Living and dining about 277 sq ft, Master bedroom about 185 sq ft, Second bedroom about 148 sq ft, Third bedroom about 120 sq ft, Kitchen about 111 sq ft, Bath about 65 sq ft, Balcony about 65 sq ft, Second bath about 55 sq ft, Passage about 55 sq ft, Third bath about 46 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹10,923 per sq ft of carpet, median of 357 registered sales
Range across those sales ₹10,381 to ₹17,015 per sq ft
Sold and booked 357 sold, 0 booked
Still available 3 flats, 659–1126 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jun 2027
Current status Due Jun 2027

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

147, 148, 149, 150 is the plot this project is built on, as filed
Revenue village MANJARI KH · shown on this site as Manjari Khurd
TalukaHaveli
Street, as filed Awhalwadi road
Bounded north by 151
Bounded east by 154
Bounded south by 146
Bounded west by 136

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerAshdan Developers Private Limited
Registered officeLevel 8, 36/1/1, Solitaire World, Mumbai Pune Highway, Regency Classic, Baner, Pune 411045
Registered agents 36 licensed agents may sell this project

Professionals named on the filing

Architect Ana Consortium Pvr Ltd PMRDA/ENG/672
Architect Vk Arch PMRDA/ENG/672
Architect VK Arch
Architect VK Design & Projects PVT. LTD. CA/2002/29235
Architect Vk arch 29235
Engineer Girish Awinashe NA
Engineer Girish Awinashe
Engineer Mr Pravin Bhosale NA
Engineer Mr Pravin Bhosale
Engineer Pravin Bhosale
Engineer Pravin Bhosale NA
Engineer Strudcom Consultant Private Limited 614-B
Chartered Accountant Bogati & Company 137351
Chartered Accountant S P A K & Co 172292
Chartered Accountant Sac & Co LLP 154711
Chartered Accountant Sac And Co LLP 172292
Chartered Accountant SAC and Co LLP
Chartered Accountant Spak & Co. 172292
Chartered Accountant Sunil Shaha 037483

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

19 cases against this project, 9 with an order on record, filed between May 2024 and Jul 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12604666 Jul 2026 No order on record
CC12603362 Jun 2026 No order on record
CC12602654 May 2026 No order on record
CC12602508 Apr 2026 No order on record
CC12601126 Mar 2026 No order on record
CC12601128 Mar 2026 No order on record
CC12601129 Mar 2026 No order on record
CC12601130 Mar 2026 No order on record
CC12601131 Mar 2026 No order on record
CC12601132 Mar 2026 No order on record
Show the remaining 9 cases
CC12600596 Feb 2026 Order passed Feb 2026
CC12600597 Feb 2026 Order passed Feb 2026
CC12600599 Feb 2026 Order passed Feb 2026
CC12500985 Mar 2025 Order passed Mar 2025
CC12500981 Mar 2025 Order passed Mar 2025
CC12500980 Mar 2025 Order passed Mar 2025
CC005000000370943 May 2024 Order passed May 2024
CC005000000370944 May 2024 Order passed May 2024
CC005000000370945 May 2024 Order passed May 2024

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

2 June 2022 is when an advocate last certified the title to this land
Title report Format A.pdf 2 June 2022
Promoter's declaration, Form B Form B- Ashdan.pdf 3 June 2022

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100045848
Promoter Ashdan Developers Private Limited
Project typeResidential / Group Housing · Building development
LocalityManjari Khurd — Haveli taluka, pincode 412307
Applied on04 June 2022
Registered on15 June 2022
Completion, as first filed30 June 2027
Due30 June 2027
Units declared360
Units sold 357 of 360 sold (99%), 3 still unsold
Complaints19 on record with MahaRERA
Certificate on file Original registration certificate, issued 15 June 2022
Application referenceREA52100112180
Current statusActive
Record last changed 05 December 2024 · 21 months ago

Where the sold count comes from, and whether it holds up. 357 of 360 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 360 flats and reaches the same answer — 357 sold, every one with money recorded as received against a named flat, and 3 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 05 December 2024.

Common questions

Is VTP Euphoria Phase 2 registered with MahaRERA?
Yes. It is registered as P52100045848, filed on 15 June 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is VTP Euphoria Phase 2 due to be handed over?
The promoter has told MahaRERA June 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has VTP Euphoria Phase 2 been delayed?
No. June 2027 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in VTP Euphoria Phase 2?
A median of ₹10,923 per square foot of carpet, across 357 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in VTP Euphoria Phase 2?
3 of 360 were still unsold at the promoter's last filing, in 2 BHK, from 659–663 sq ft of carpet.
Are there complaints against VTP Euphoria Phase 2?
19 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building VTP Euphoria Phase 2?
Ashdan Developers Private Limited, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100045848 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Manjari Khurd