RERA registered P52100055407 Active
Vtp Dolce Vita Phase 3
Manjari Khurd, Pune · Others by Ashdan Developers Private Limited
Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.
In short
Vtp Dolce Vita Phase 3 in Manjari Khurd is MahaRERA-registered (P52100055407) and still under construction, with possession filed for October 2029. Buyers have already registered 360 sales here at a median ₹11,567 per sq ft of carpet — not an asking price. About 76% of the 484 units are sold. 11 complaints sit on the filing. Ashdan Developers Private Limited is the promoter.
- Sold here at
- ₹11,567
- per sq ft, 360 registered sales
- Available
- 2, 3 BHK
- 105 left · 597–786 sq ft
- Now due
- Oct 2029
- 4 months later than first promised
Where this is
Manjari Khurd, PMRDA, Pune, 412307
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 484 units are filed unit by unit with the authority, the highest on floor 32. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 26 units · all sold
2 BHK 384 units · 65 available
3 BHK 64 units · 40 available
Shops 10 units · all sold
370 / 484
76% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 26 units · none available
428 sq ft carpet as drawn
- Carpet, filed
- 428 sq ft
- Built-up
- about 514 sq ft
- Super built-up
- about 599 sq ft
Every room in this unit
Living and dining about 160 sq ft, Master bedroom about 107 sq ft, Kitchen about 64 sq ft, Bath about 37 sq ft, Balcony about 37 sq ft, Passage about 21 sq ft.
2 BHK 384 units · 65 available
672 sq ft carpet as drawn, from 597–748 sq ft filed in this configuration
- Carpet, filed
- 672 sq ft
- Built-up
- about 806 sq ft
- Super built-up
- about 941 sq ft
Every room in this unit
Living and dining about 196 sq ft, Master bedroom about 130 sq ft, Second bedroom about 104 sq ft, Kitchen about 78 sq ft, Bath about 46 sq ft, Balcony about 46 sq ft, Second bath about 39 sq ft, Passage about 33 sq ft.
3 BHK 64 units · 40 available
786 sq ft carpet as drawn
- Carpet, filed
- 786 sq ft
- Built-up
- about 943 sq ft
- Super built-up
- about 1,100 sq ft
Every room in this unit
Living and dining about 193 sq ft, Master bedroom about 129 sq ft, Second bedroom about 103 sq ft, Third bedroom about 84 sq ft, Kitchen about 77 sq ft, Bath about 45 sq ft, Balcony about 45 sq ft, Second bath about 39 sq ft, Passage about 39 sq ft, Third bath about 32 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹10,270 to ₹13,904 per sq ft |
|---|---|
| Sold and booked | 370 sold, 0 booked |
| Still available | 105 units, 266–786 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from June 2029 to October 2029, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | MANJARI KH · shown on this site as Manjari Khurd |
|---|---|
| Taluka | Haveli |
| Street, as filed | Awhalwadi Road |
| Bounded north by | Survey no 137 |
| Bounded east by | Survey no 123 |
| Bounded south by | Tower 7 |
| Bounded west by | 24 meters road |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Ashdan Developers Private Limited |
|---|---|
| Registered office | Level 7, Level 8 S No. 36/1/1, Solitaire World, Mumbai Bangalore Highway, Regency Classic, Baner, Pune 411045 |
| Registered agents | 36 licensed agents may sell this project |
Professionals named on the filing
| Architect | ANA Consortium Pvt Ltd PMRDA/ENG/672 |
|---|---|
| Architect | VK design & projects Pvt. Ltd. CA/2002/29235 |
| Architect | VKe 29235 |
| Architect | VKe 29235 |
| Engineer | BABU Aakarrapu NA |
| Engineer | Babu Aakarrapu NA |
| Engineer | Babu Aakarrapu NA |
| Engineer | Babu Aakarrapu NA |
| Engineer | Girish Awinashe NA |
| Engineer | Naushad Shikhalkar NA |
| Engineer | Ravi Vivekanandan |
| Chartered Accountant | Amit Satish Shingvi 154711 |
| Chartered Accountant | Amit Satish Shingvi 154711 |
| Chartered Accountant | Priayanka Chordiya And Associates 166922 |
| Chartered Accountant | Priyanka Chordiya And Associates 166922 |
| Chartered Accountant | Priyanka Chordiya And Associates 166922 |
| Chartered Accountant | Priyanka Chordiya And Associates 166922 |
| Chartered Accountant | Sac & Co LLP 154711 |
| Chartered Accountant | Spak & Co 172292 |
| Chartered Accountant | SPAK & Co 172292 |
| Chartered Accountant | Sunil Shaha 037483 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
11 cases against this project, 4 with an order on record, filed between Mar 2025 and Sep 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC12605919 | Sep 2026 | No order on record |
| CC12604633 | Jul 2026 | No order on record |
| CC12602533 | Apr 2026 | No order on record |
| CC12601217 | Mar 2026 | No order on record |
| CC12601057 | Feb 2026 | No order on record |
| CC12601058 | Feb 2026 | No order on record |
| CC12502372 | Jul 2025 | Order passed Jul 2025 |
| CC12501598 | May 2025 | No order on record |
| CC12501599 | May 2025 | Order passed May 2025 |
| CC12501600 | May 2025 | Order passed May 2025 |
Show the remaining 1 cases
| CC12500995 | Mar 2025 | Order passed Mar 2025 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report TSR.pdf | 6 February 2024 |
|---|---|
| Promoter's declaration, Form B FORM B PHASE 3.pdf | 6 February 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100055407 |
| Promoter | Ashdan Developers Private Limited |
| Project type | Others · Building development |
| Locality | Manjari Khurd — Haveli taluka, pincode 412307 |
| Applied on | 07 February 2024 |
| Registered on | 22 March 2024 |
| Completion, as first filed | 30 June 2029 |
| Due | 30 October 2029 4 months later |
| Units declared | 484 |
| Units sold | 370 of 484 sold (76%), 114 still unsold |
| Complaints | 11 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 22 March 2024 |
| Application reference | REA52100153143 |
| Current status | Active |
| Record last changed | 26 March 2025 · 18 months ago |
Where the sold count comes from, and whether it holds up. 370 of 484 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 484 units and reaches the same answer — 370 sold, every one with money recorded as received against a named unit, and 105 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 26 March 2025.
Common questions
- Is Vtp Dolce Vita Phase 3 registered with MahaRERA?
- Yes. It is registered as P52100055407, filed on 22 March 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Vtp Dolce Vita Phase 3 due to be handed over?
- The promoter has told MahaRERA October 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Vtp Dolce Vita Phase 3 been delayed?
- Yes. The first date filed was June 2029. It now stands at October 2029, 4 months later.
- What did buyers actually pay in Vtp Dolce Vita Phase 3?
- A median of ₹11,567 per square foot of carpet, across 360 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Vtp Dolce Vita Phase 3?
- 105 of 484 were still unsold at the promoter's last filing, in 2, 3 BHK, from 597–786 sq ft of carpet.
- Are there complaints against Vtp Dolce Vita Phase 3?
- 11 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Vtp Dolce Vita Phase 3?
- Ashdan Developers Private Limited, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100055407 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Manjari Khurd
Stock image
- Registered here
- ₹11,066
- Due
- Dec 2026
- Units
- 320
- Carpet
- 215–361
- Sold at
- ₹25.7 lakh
Stock image
- Registered here
- ₹11,095
- On offer
- 2, 3 BHK
- Due
- Oct 2027
- Units
- 698
- Carpet
- 680–895
- Sold at
- ₹89.4 lakh
Stock image
- Nearby
- ₹10,750
- On offer
- 2 BHK
- Due
- Jan 2027
- Units
- 14
- Carpet
- 575–619
- Typical flat
- ~₹64.5 lakh