Z Zomefy

RERA registered P52100000517 Active

Riddhi Siddhi Towers

Manjari Budruk, Pune · Residential / Group Housing by Shailesh Construction Co

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Riddhi Siddhi Towers in Manjari Budruk is MahaRERA-registered (P52100000517) and still under construction, with possession filed for December 2027. Buyers have already registered 125 sales here at a median ₹7,138 per sq ft of carpet — not an asking price. About 100% of the 125 units are sold. Shailesh Construction Co is the promoter.

Stock image, not a photograph of Riddhi Siddhi Towers Stock image
Where
Manjari Budruk
pincode 412307
Sold here at
₹7,138
per sq ft, 125 registered sales
Available
None left
every flat filed as sold or held
Now due
Dec 2027
6 years later than first promised
A stock photograph, not Riddhi Siddhi Towers. We have no picture of this site yet.

Where this is

Manjari Budruk, PMC, Pune, 412307

Village
MANJARI Bk
Taluka
Haveli
Pincode
412307
Coordinates
18.502204, 73.969806

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 125 flats are filed unit by unit with the authority, the highest on floor 9. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 125 units · all sold

12 units 391 sq ft 36.37 sq m as filed
113 units 483 sq ft 44.9 sq m as filed
Units sold

125 / 125

Nearly sold out

100% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 125 flats · none available

483 sq ft carpet as drawn, from 391–483 sq ft filed in this configuration

Carpet, filed
483 sq ft
Built-up
about 580 sq ft
Super built-up
about 676 sq ft
Every room in this flat

Living and dining about 181 sq ft, Master bedroom about 121 sq ft, Kitchen about 72 sq ft, Bath about 42 sq ft, Balcony about 42 sq ft, Passage about 24 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹7,138 per sq ft of carpet, median of 125 registered sales
Range across those sales ₹5,483 to ₹9,270 per sq ft
Sold and booked 125 sold, 0 booked
Still available 0 flats, 391–483 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2021
Current status Due Dec 2027

Revised projection

The completion date has moved from December 2021 to December 2027, 6 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S NO 88/2A/1/4 88/2B/1/4 87/2/1 is the plot this project is built on, as filed
Revenue village MANJARI Bk · shown on this site as Manjari Budruk
TalukaHaveli
Street, as filed Pune Solapur Highway
Bounded north by B Y LAND OWNED BY SHIVARKAR
Bounded east by BY LAND OWNED BY TUPE
Bounded south by BY ROAD AND LAND OWNED BY SHEWALE
Bounded west by BY LAND OWNED BY TAKALE

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerShailesh Construction Co
Registered office4, Fitfth Floor, A2, A2 , Raghudurga Apartment, Off Karve Road, Varunraj Hotel, Erandawane, Pune 411004
Registered agents 1 licensed agent may sell this project

Professionals named on the filing

Architect Anand Basavaraj Koppa CA/2001/27333
Engineer Delcons Structural Consultatnts
Engineer Saqlain Shaikh
Chartered Accountant Amar and Company 180807
Chartered Accountant Ashish Rathi 180807
Chartered Accountant Huzaifa S Sanawadwala 131158
Chartered Accountant Smita Takawale 144971

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

12 July 2017 is when an advocate last certified the title to this land
Title report Search Report.pdf 12 July 2017
Promoter's declaration, Form B FORM B.pdf 12 July 2017

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100000517
Promoter Shailesh Construction Co
Project typeResidential / Group Housing · Building development
LocalityManjari Budruk — Haveli taluka, pincode 412307
Applied on16 July 2017
Registered on18 July 2017
Completion, as first filed31 December 2021
Due31 December 2027 6 years later
Units declared125
Units sold All 125 sold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 27 April 2026
Application referenceREA52100004553
Current statusActive
Record last changed 27 April 2026 · 5 months ago

Where the sold count comes from, and whether it holds up. 125 of 125 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 125 flats and reaches the same answer — 125 sold, every one with money recorded as received against a named flat, and 0 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 27 April 2026.

Common questions

Is Riddhi Siddhi Towers registered with MahaRERA?
Yes. It is registered as P52100000517, filed on 18 July 2017, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Riddhi Siddhi Towers due to be handed over?
The promoter has told MahaRERA December 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Riddhi Siddhi Towers been delayed?
Yes. The first date filed was December 2021. It now stands at December 2027, 6 years later.
What did buyers actually pay in Riddhi Siddhi Towers?
A median of ₹7,138 per square foot of carpet, across 125 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Riddhi Siddhi Towers?
None. All 125 are filed as sold or booked.
Are there complaints against Riddhi Siddhi Towers?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Riddhi Siddhi Towers?
Shailesh Construction Co, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100000517 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Manjari Budruk