RERA registered PR1260002502973 Active
Aarambh Residency
Manchar, Pune · Residential / Group Housing by Supreme Infra
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Aarambh Residency in Manchar is MahaRERA-registered (PR1260002502973) and still under construction, with possession filed for April 2031. No sales are registered in this project yet. Across Manchar, buyers have been registering around ₹4,846 per sq ft of carpet (24 sales in the locality) — the area median, not this building. None of the units are filed as sold yet. Supreme Infra is the promoter.
- Manchar at
- ₹4,846
- per sq ft across the locality, not this project
- Available
- 1 BHK, 2 BHK, Row Houses
- 27 left · 295–1,106 sq ft
- Now due
- Apr 2031
- 4 months later than first promised
Where this is
Manchar, Pune, 410503
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 42 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 21 units · 14 available
2 BHK 7 units · 5 available
Row Houses 14 units · 8 available
0 / 42
0% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 21 flats · 14 available
295 sq ft carpet as drawn, from 295–450 sq ft filed in this configuration
- Carpet, filed
- 295 sq ft
- Built-up
- about 354 sq ft
- Super built-up
- about 413 sq ft
Every room in this flat
Living and dining about 111 sq ft, Master bedroom about 74 sq ft, Kitchen about 44 sq ft, Bath about 26 sq ft, Balcony about 26 sq ft, Passage about 15 sq ft.
2 BHK 7 flats · 5 available
467 sq ft carpet as drawn
- Carpet, filed
- 467 sq ft
- Built-up
- about 560 sq ft
- Super built-up
- about 654 sq ft
Every room in this flat
Living and dining about 136 sq ft, Master bedroom about 91 sq ft, Second bedroom about 73 sq ft, Kitchen about 54 sq ft, Bath about 32 sq ft, Balcony about 32 sq ft, Second bath about 27 sq ft, Passage about 23 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What flats like these cost nearby
No sale has been registered at Aarambh Residency yet. The promoter has filed no agreement values, so nothing below is this project's own price.
| Median across Manchar | ₹4,846 per sq ft of carpet, from 24 registered sales |
|---|---|
| The middle half of them | ₹4,523 to ₹6,720 per sq ft |
| Carpet sizes filed here | 295–1106 sq ft |
| Still available | 27 flats |
This is Manchar as a whole and not a rate for Aarambh Residency, and it is pooled across every configuration the locality has registered — studios and four-bedroom flats included — because Manchar has not filed enough sales of any single configuration on sale here to quote one separately. Treat it as the order of magnitude for the area rather than a figure to negotiate against. See the full distribution for Manchar.
The government's valuation of the unsold flats
| On sale here | Carpet | Valued at no less than |
|---|---|---|
| 1 BHK 14 unsold | 295–450 sq ft | ₹17.2 lakh–₹19.4 lakh ₹5,556/sq ft |
| 2 BHK 5 unsold | 467 sq ft | ₹27.3 lakh ₹5,838/sq ft |
| Row Houses 8 unsold | 1,044–1,106 sq ft | ₹40.2 lakh–₹42.6 lakh ₹3,850/sq ft |
This is the Annual Statement of Rates value the promoter filed against each unsold flat — the state's valuation, not an asking price and not a discount. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Revised projection
The completion date has moved from December 2030 to April 2031, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Manchar (CT) · shown on this site as Manchar |
|---|---|
| Taluka | Ambegaon |
| Street, as filed | Mulewadi |
| Bounded north by | Sr. No.166/32 |
| Bounded east by | Sr. No. 138/6 |
| Bounded south by | Runnel |
| Bounded west by | Sr.No. 165/3 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Supreme Infra |
|---|---|
| Registered office | C2-201, Chitra Building Nakshatra Residency, Pune Nashik Highway, Manchar, Ghule Mala, Pune 410503 |
Professionals named on the filing
| Architect | Pratik Patole CA/015/67340 |
|---|---|
| Engineer | Abhishek Suresh Ghule |
| Engineer | Avadhut Tukaram Shete 724/2022/23 |
| Chartered Accountant | Sunil Nimbalkar & Associates 197121 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Updated Legal title report.pdf | 17 March 2026 |
|---|---|
| Promoter's declaration, Form B Form B (Affidavit cum Declaration)_Developer OK.pdf | 5 March 2026 |
| Annexure A declaration ANNEXURE A_as per order No 50 OK.pdf | 4 March 2026 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PR1260002502973 |
| Promoter | Supreme Infra |
| Project type | Residential / Group Housing · Building development |
| Locality | Manchar — Ambegaon taluka, pincode 410503 |
| Applied on | 06 March 2026 |
| Registered on | 18 March 2026 |
| Completion, as first filed | 31 December 2030 |
| Due | 30 April 2031 4 months later |
| Units declared | 42 |
| Units sold | None sold yet, all 42 on the market |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 18 March 2026 |
| Application reference | ACK17112504636 |
| Current status | Active |
| Record last changed | 18 March 2026 · 6 months ago |
Nothing has sold yet. The promoter's quarterly progress report says none of the 42 flats are gone, and the unit-by-unit list they file separately says the same: all 42 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 18 March 2026.
Common questions
- Is Aarambh Residency registered with MahaRERA?
- Yes. It is registered as PR1260002502973, filed on 18 March 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Aarambh Residency due to be handed over?
- The promoter has told MahaRERA April 2031. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Aarambh Residency been delayed?
- Yes. The first date filed was December 2030. It now stands at April 2031, 4 months later.
- What does a flat in Aarambh Residency cost?
- Nothing has been registered in this project yet, so it has no price of its own. Across Manchar the median registered rate is ₹4,846 per square foot of carpet, which is the area rather than this building.
- How many flats are left in Aarambh Residency?
- 27 of 42 were still unsold at the promoter's last filing, in 1, 2 BHK + row houses, from 295–1,106 sq ft of carpet.
- Are there complaints against Aarambh Residency?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Aarambh Residency?
- Supreme Infra, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for PR1260002502973 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Manchar
Stock image
- Registered here
- ₹4,236
- On offer
- 1, 2 BHK + row houses
- Due
- Apr 2028
- Units
- 38
- Carpet
- 309–826
- Sold at
- ₹35 lakh
Stock image
- Registered here
- ₹7,041
- On offer
- 2, 3 BHK
- Due
- Apr 2031
- Units
- 314
- Carpet
- 734–1,727
- Sold at
- ₹71.1 lakh
Stock image
- Locality median
- ₹4,846
- On offer
- Row Houses
- Due
- Jul 2029
- Units
- 24
- Carpet
- 1,294
- Typical flat
- ~₹62.7 lakh