RERA registered P52100056198 Active
Mayuk
Kothrud, Pune · Others by Mayur Corporation
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Mayuk in Kothrud is MahaRERA-registered (P52100056198) and still under construction, with possession filed for July 2031. Buyers have already registered 93 sales here at a median ₹24,701 per sq ft of carpet — not an asking price. Mayur Corporation is the promoter.
- Sold here at
- ₹24,701
- per sq ft, 93 registered sales
- Available
- 1 BHK, 3 BHK, Shops
- 184 left · 440–1,769 sq ft
- Now due
- Jul 2031
- 4 months later than first promised
Where this is
Kothrud, PMC, Pune, 411038
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 277 units are filed unit by unit with the authority, the highest on floor 21. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 3 units · all available
3 BHK 51 units · 25 available
Configuration not filed 219 units · 152 available
Shops 4 units · all available
89 / 277
32% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 3 units · 3 available
533 sq ft carpet as drawn, from 440–533 sq ft filed in this configuration
- Carpet, filed
- 533 sq ft
- Built-up
- about 640 sq ft
- Super built-up
- about 746 sq ft
Every room in this unit
Living and dining about 200 sq ft, Master bedroom about 133 sq ft, Kitchen about 80 sq ft, Bath about 47 sq ft, Balcony about 47 sq ft, Passage about 27 sq ft.
3 BHK 51 units · 25 available
1,132 sq ft carpet as drawn, from 1,132–1,222 sq ft filed in this configuration
- Carpet, filed
- 1,132 sq ft
- Built-up
- about 1,358 sq ft
- Super built-up
- about 1,585 sq ft
Every room in this unit
Living and dining about 278 sq ft, Master bedroom about 186 sq ft, Second bedroom about 148 sq ft, Third bedroom about 121 sq ft, Kitchen about 111 sq ft, Bath about 65 sq ft, Balcony about 65 sq ft, Second bath about 56 sq ft, Passage about 56 sq ft, Third bath about 46 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹16,690 to ₹29,244 per sq ft |
|---|---|
| Sold and booked | 89 sold, 4 booked |
| Still available | 184 units, 440–1769 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from March 2031 to July 2031, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Kothrud |
|---|---|
| Taluka | Haveli |
| Street, as filed | - |
| Bounded north by | BY CTS NO 755-88 TO 755-94 |
| Bounded east by | BY CTS NO 832B-134 |
| Bounded south by | BY PART OF CTS NO 755-111 |
| Bounded west by | BY DP ROAD |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Mayur Corporation |
|---|---|
| Registered office | Final Plot No 564/2B Cts No 1199A/2, 564/2B, Ghole Road, Near Tukaram Paduka Chowk, Shivajinagar, Pune 411004 |
| Registered agents | 1 licensed agent may sell this project |
Professionals named on the filing
| Architect | Prakash Kulkarni CA/98/22909 |
|---|---|
| Engineer | G A Abhilare Consultants Pvt Ltd PMC Reg. No. 383 |
| Engineer | Kalpesh Hojage 977 |
| Chartered Accountant | Ameya Joshi 186887 |
| Chartered Accountant | Ankur Mahendra Mehta 163470 |
| Chartered Accountant | Nisarg Rajesh Shah 168235 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report SEARCH AND TITLE REPORT.PDF | 6 May 2024 1 older version on file |
|---|---|
| Promoter's declaration, Form B FORM B (6).PDF | 23 April 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100056198 |
| Promoter | Mayur Corporation |
| Project type | Others · Building development |
| Locality | Kothrud — Haveli taluka, pincode 411038 |
| Applied on | 06 May 2024 |
| Registered on | 21 May 2024 |
| Completion, as first filed | 31 March 2031 |
| Due | 31 July 2031 4 months later |
| Units declared | 277 |
| Units sold | 89 of 277 sold (32%), 188 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 20 August 2026 |
| Application reference | REA52100157939 |
| Current status | Active |
| Record last changed | 29 May 2026 · 4 months ago |
Where the sold count comes from, and whether it holds up. 89 of 277 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 89 of 277 sold, leaving 188. The unit-by-unit list they file separately covers 277 units and marks 89 sold with 184 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 29 May 2026.
Common questions
- Is Mayuk registered with MahaRERA?
- Yes. It is registered as P52100056198, filed on 21 May 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Mayuk due to be handed over?
- The promoter has told MahaRERA July 2031. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Mayuk been delayed?
- Yes. The first date filed was March 2031. It now stands at July 2031, 4 months later.
- What did buyers actually pay in Mayuk?
- A median of ₹24,701 per square foot of carpet, across 93 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Mayuk?
- 184 of 277 were still unsold at the promoter's last filing, in 1, 3 BHK + shops, from 440–1,769 sq ft of carpet.
- Are there complaints against Mayuk?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Mayuk?
- Mayur Corporation, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100056198 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Kothrud
Stock image
- Nearby
- ₹15,284
- On offer
- 2 BHK
- Due
- Apr 2027
- Units
- 9
- Carpet
- 485–778
- Typical flat
- ~₹1.1 crore
Stock image
- Registered here
- ₹15,618
- On offer
- 2, 3, 4 BHK + offices
- Due
- Oct 2028
- Units
- 26
- Carpet
- 143–1,364
- Sold at
- ₹1.4 crore
Stock image
- Registered here
- ₹12,498
- On offer
- 1, 2 BHK +2 more
7 complaints
- Due
- Dec 2026
- Units
- 321
- Carpet
- 96–1,747
- Sold at
- ₹79.8 lakh