RERA registered P52100051675 Active
Avantika
Kothrud, Pune · Residential / Group Housing by Ranjekar Realty LLP
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Avantika in Kothrud is MahaRERA-registered (P52100051675) and still under construction, with possession filed for December 2026. Buyers have already registered 12 sales here at a median ₹22,317 per sq ft of carpet — not an asking price. About 23% of the 52 units are sold. Ranjekar Realty LLP is the promoter.
- Sold here at
- ₹22,317
- per sq ft, 12 registered sales
- Available
- 2, 3 BHK
- 17 left · 598–836 sq ft
- Possession
- Dec 2026
- as filed with MahaRERA
Where this is
Kothrud, PMC, Pune, 411038
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 52 flats are filed unit by unit with the authority, the highest on floor 16. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 1 unit · not for sale
2 BHK 27 units · 13 available
3 BHK 14 units · 4 available
4 BHK 10 units · none available
12 / 52
23% absorption rate
Visual area guide See what the filed sizes feel like 4 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 1 flat · none available
633 sq ft carpet as drawn
- Carpet, filed
- 633 sq ft
- Built-up
- about 760 sq ft
- Super built-up
- about 886 sq ft
Every room in this flat
Living and dining about 237 sq ft, Master bedroom about 158 sq ft, Kitchen about 95 sq ft, Bath about 55 sq ft, Balcony about 55 sq ft, Passage about 32 sq ft.
2 BHK 27 flats · 13 available
598 sq ft carpet as drawn, from 598–830 sq ft filed in this configuration
- Carpet, filed
- 598 sq ft
- Built-up
- about 718 sq ft
- Super built-up
- about 837 sq ft
Every room in this flat
Living and dining about 174 sq ft, Master bedroom about 116 sq ft, Second bedroom about 93 sq ft, Kitchen about 70 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Second bath about 35 sq ft, Passage about 29 sq ft.
3 BHK 14 flats · 4 available
830 sq ft carpet as drawn, from 644–836 sq ft filed in this configuration
- Carpet, filed
- 830 sq ft
- Built-up
- about 996 sq ft
- Super built-up
- about 1,162 sq ft
Every room in this flat
Living and dining about 204 sq ft, Master bedroom about 136 sq ft, Second bedroom about 109 sq ft, Third bedroom about 88 sq ft, Kitchen about 82 sq ft, Bath about 48 sq ft, Balcony about 48 sq ft, Second bath about 41 sq ft, Passage about 41 sq ft, Third bath about 34 sq ft.
4 BHK 10 flats · none available
1,285 sq ft carpet as drawn, from 1,197–1,462 sq ft filed in this configuration
- Carpet, filed
- 1,285 sq ft
- Built-up
- about 1,542 sq ft
- Super built-up
- about 1,799 sq ft
Every room in this flat
Living and dining about 286 sq ft, Master bedroom about 190 sq ft, Second bedroom about 152 sq ft, Third bedroom about 124 sq ft, Kitchen about 114 sq ft, Fourth bedroom about 114 sq ft, Bath about 67 sq ft, Balcony about 67 sq ft, Passage about 67 sq ft, Second bath about 57 sq ft, Third bath about 48 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹11,978 to ₹30,287 per sq ft |
|---|---|
| Sold and booked | 12 sold, 0 booked |
| Still available | 17 flats, 598–1462 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Kothrud |
|---|---|
| Taluka | Haveli |
| Street, as filed | Ideal colony |
| Bounded north by | By encroached portion Mr Chafekar and plot 16 |
| Bounded east by | By 30 feet road |
| Bounded south by | By 30 feet road |
| Bounded west by | By sutar patti |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Ranjekar Realty LLP |
|---|---|
| Registered office | K6/4, Yash, Erandawane Co-Op Hsg Society, Near Deenanath Mangeshkar Hospital, Erandawane, Pune 411004 |
Professionals named on the filing
| Architect | Ar Manguesh Bhandekar CA/94/17553 |
|---|---|
| Engineer | Aniruddha Ranjekar |
| Chartered Accountant | Kishor R Joshi and Associates |
| Chartered Accountant | Phule Wagh & Associates LLP 180704 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Avantika Search New dtd final upload.pdf | 13 June 2023 1 older version on file |
|---|---|
| Promoter's declaration, Form B Form B Avantika and LLP_compressed.pdf | 30 May 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100051675 |
| Promoter | Ranjekar Realty LLP |
| Project type | Residential / Group Housing · Building development |
| Locality | Kothrud — Haveli taluka, pincode 411038 |
| Applied on | 31 May 2023 |
| Registered on | 27 June 2023 |
| Completion, as first filed | 31 December 2026 |
| Due | 31 December 2026 |
| Units declared | 52 |
| Units sold | 12 of 52 sold (23%), 40 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 05 June 2024 |
| Application reference | REA52100139861 |
| Current status | Active |
| Record last changed | 13 March 2024 · over 2 years ago 2 years untouched |
Where the sold count comes from, and whether it holds up. 12 of 52 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 52 flats and reaches the same answer — 12 sold, every one with money recorded as received against a named flat, and 17 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 13 March 2024.
MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.
Common questions
- Is Avantika registered with MahaRERA?
- Yes. It is registered as P52100051675, filed on 27 June 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Avantika due to be handed over?
- The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Avantika been delayed?
- No. December 2026 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Avantika?
- A median of ₹22,317 per square foot of carpet, across 12 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Avantika?
- 17 of 52 were still unsold at the promoter's last filing, in 2, 3 BHK, from 598–836 sq ft of carpet.
- Are there complaints against Avantika?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Avantika?
- Ranjekar Realty LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100051675 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Kothrud
Stock image
- Nearby
- ₹15,282–17,382
- On offer
- 2, 3 BHK + shops
- Due
- Dec 2028
- Units
- 15
- Carpet
- 263–1,142
- Typical unit
- ~₹67.6 lakh
Stock image
- Nearby
- ₹15,282–17,382
- On offer
- 2, 3 BHK + shops
- Due
- Dec 2027
- Units
- 10
- Carpet
- 139–995
- Typical unit
- ~₹40.7 lakh
Stock image
- Nearby
- ₹15,282–18,648
- On offer
- 2, 3, 4 BHK
1 complaint
- Due
- Aug 2028
- Units
- 13
- Carpet
- 531–989
- Typical flat
- ~₹95 lakh