Z Zomefy

RERA registered P52100056040 Completed

Aumsanika Paras Residency

Kothrud, Pune · Residential / Group Housing by Aumsanika Developers LLP

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Aumsanika Paras Residency in Kothrud is MahaRERA-registered (P52100056040) and was handed over in March 2026. Buyers have already registered 6 sales here at a median ₹19,777 per sq ft of carpet — not an asking price. About 43% of the 14 units are sold. Aumsanika Developers LLP is the promoter.

Stock image, not a photograph of Aumsanika Paras Residency Stock image
Where
Kothrud
pincode 411038
Sold here at
₹19,777
per sq ft, 6 registered sales
Available
3 BHK
3 left · 1,330 sq ft
Possession
Mar 2026
as filed with MahaRERA
A stock photograph, not Aumsanika Paras Residency. We have no picture of this site yet.

Where this is

Kothrud, PMC, Pune, 411038

Street map of Kothrud centred on the coordinate filed for Aumsanika Paras Residency, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Kothrud
Taluka
Haveli
Pincode
411038
Coordinates
18.504313, 73.805078

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 14 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

3 BHK 14 units · 3 available

7 units 1330 sq ft 123.54 sq m as filed
7 units 1334 sq ft 123.95 sq m as filed
Units sold

6 / 14

Selling steadily

43% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

3 BHK 14 flats · 3 available

1,330 sq ft carpet as drawn, from 1,330–1,334 sq ft filed in this configuration

Carpet, filed
1,330 sq ft
Built-up
about 1,596 sq ft
Super built-up
about 1,862 sq ft
Every room in this flat

Living and dining about 327 sq ft, Master bedroom about 218 sq ft, Second bedroom about 174 sq ft, Third bedroom about 142 sq ft, Kitchen about 131 sq ft, Bath about 76 sq ft, Balcony about 76 sq ft, Second bath about 65 sq ft, Passage about 65 sq ft, Third bath about 55 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹19,777 per sq ft of carpet, median of 6 registered sales
Range across those sales ₹17,614 to ₹20,247 per sq ft
Sold and booked 6 sold, 0 booked
Still available 3 flats, 1330–1334 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Mar 2026
Current status Handed over Mar 2026

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

SURVEY NO 133/13/2B to 25B+28+29 CTS NO 752 Plot No 20 is the plot this project is built on, as filed
Revenue village Kothrud
TalukaHaveli
Street, as filed KOTHRUD
Bounded north by SURVEY NO 133P
Bounded east by BY COLONY ROAD
Bounded south by PLOT NO 19 MRUTUNJAY CHS
Bounded west by SURVEY NO 133P

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerAumsanika Developers LLP
Registered officeS.No 209, Plot No 14, 209, Magnolia, Kalyaninagar, Vimannagar, Pune 411014

Professionals named on the filing

Architect Prakash Kulkarni Ankur Associates CA/98/22909
Engineer Kalpesh Zabak
Engineer Rutuja Jagdale
Chartered Accountant Anjk & Co LLP 182099
Chartered Accountant Ruchi M Gandhi & Associates

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

19 April 2024 is when an advocate last certified the title to this land
Title report RERA_TS_Report compressed.pdf 19 April 2024
Promoter's declaration, Form B FORM B Aumsanika Developers LLP.pdf 13 March 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100056040
Promoter Aumsanika Developers LLP
Project typeResidential / Group Housing · Building development
LocalityKothrud — Haveli taluka, pincode 411038
Applied on13 March 2024
Registered on10 May 2024
Completion, as first filed30 March 2026
Handed over30 March 2026
Units declared14
Units sold 6 of 14 sold (43%), 8 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 13 August 2024
Application referenceREA52100155266
Current statusCompleted
Record last changed 21 March 2025 · 18 months ago

Where the sold count comes from, and whether it holds up. 6 of 14 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 14 flats and reaches the same answer — 6 sold, every one with money recorded as received against a named flat, and 3 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 21 March 2025.

Common questions

Is Aumsanika Paras Residency registered with MahaRERA?
Yes. It is registered as P52100056040, filed on 10 May 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
Has Aumsanika Paras Residency been handed over?
Yes. The completion date on the register is March 2026.
Has Aumsanika Paras Residency been delayed?
No. March 2026 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Aumsanika Paras Residency?
A median of ₹19,777 per square foot of carpet, across 6 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Aumsanika Paras Residency?
3 of 14 were still unsold at the promoter's last filing, in 3 BHK, from 1,330 sq ft of carpet.
Are there complaints against Aumsanika Paras Residency?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Aumsanika Paras Residency?
Aumsanika Developers LLP, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100056040 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Kothrud