RERA registered P52100055872 Active
Adorn Alcazar-Ii
Kondhwa Budruk, Pune · Others by Hasib Ahmed Shaikh
Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.
In short
Adorn Alcazar-Ii in Kondhwa Budruk is MahaRERA-registered (P52100055872) and still under construction, with possession filed for May 2029. Buyers have already registered 7 sales here at a median ₹7,559 per sq ft of carpet — not an asking price. About 8% of the 83 units are sold. Hasib Ahmed Shaikh is the promoter.
- Sold here at
- ₹7,559
- per sq ft, 7 registered sales
- Available
- 1 BHK, 2 BHK, 3 BHK, Shops
- 76 left · 393–887 sq ft
- Now due
- May 2029
- 4 months later than first promised
Where this is
Kondhwa Budruk, PMC, Pune, 411048
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 83 units are filed unit by unit with the authority, the highest on floor 10. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 2 units · 1 available
2 BHK 70 units · 64 available
3 BHK 8 units · all available
Shops 3 units · all available
7 / 83
8% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 2 units · 1 available
453 sq ft carpet as drawn
- Carpet, filed
- 453 sq ft
- Built-up
- about 544 sq ft
- Super built-up
- about 634 sq ft
Every room in this unit
Living and dining about 170 sq ft, Master bedroom about 113 sq ft, Kitchen about 68 sq ft, Bath about 40 sq ft, Balcony about 40 sq ft, Passage about 23 sq ft.
2 BHK 70 units · 64 available
606 sq ft carpet as drawn, from 515–606 sq ft filed in this configuration
- Carpet, filed
- 606 sq ft
- Built-up
- about 727 sq ft
- Super built-up
- about 848 sq ft
Every room in this unit
Living and dining about 177 sq ft, Master bedroom about 118 sq ft, Second bedroom about 94 sq ft, Kitchen about 71 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Second bath about 35 sq ft, Passage about 29 sq ft.
3 BHK 8 units · 8 available
887 sq ft carpet as drawn, from 711–887 sq ft filed in this configuration
- Carpet, filed
- 887 sq ft
- Built-up
- about 1,064 sq ft
- Super built-up
- about 1,242 sq ft
Every room in this unit
Living and dining about 218 sq ft, Master bedroom about 145 sq ft, Second bedroom about 116 sq ft, Third bedroom about 95 sq ft, Kitchen about 87 sq ft, Bath about 51 sq ft, Balcony about 51 sq ft, Second bath about 44 sq ft, Passage about 44 sq ft, Third bath about 36 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹6,846 to ₹8,349 per sq ft |
|---|---|
| Sold and booked | 6 sold, 1 booked |
| Still available | 76 units, 393–887 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from January 2029 to May 2029, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | kondhwa BK · shown on this site as Kondhwa Budruk |
|---|---|
| Taluka | Haveli |
| Street, as filed | GAOTHAN ROAD |
| Bounded north by | BY SR NO 7 HISSA NO 36 |
| Bounded east by | BY ROAD |
| Bounded south by | BY SR NO 7 HISSA NO 41-1 |
| Bounded west by | BY NALLAH |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Hasib Ahmed Shaikh |
|---|---|
| Registered office | Plot No 12/A, Sr. No. 588/2B, Adorn House, Harmony Chs, Gangadham Chowk, Bibwewadi Kondhwa Road, Pune 411037 |
Professionals named on the filing
| Architect | Hasib Ahmed Shaikh L.E No. 1666 |
|---|---|
| Engineer | Hasib Ahmed Shaikh REG/PMC/STE/4023/24 |
| Chartered Accountant | Mu 161094 |
| Chartered Accountant | P Jasani & Associates 032477 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Scan 26-Mar-2024.pdf | 26 March 2024 1 older version on file |
|---|---|
| Promoter's declaration, Form B Form - B.pdf | 6 March 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100055872 |
| Promoter | Hasib Ahmed Shaikh |
| Project type | Others · Building development |
| Locality | Kondhwa Budruk — Haveli taluka, pincode 411048 |
| Applied on | 07 March 2024 |
| Registered on | 29 April 2024 |
| Completion, as first filed | 31 January 2029 |
| Due | 31 May 2029 4 months later |
| Units declared | 83 |
| Units sold | 7 of 83 sold (8%), 76 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 29 April 2024 |
| Application reference | REA52100155115 |
| Current status | Active |
| Record last changed | 29 April 2024 · over 2 years ago 2 years untouched |
Where the sold count comes from, and whether it holds up. 7 of 83 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 83 units and reaches the same answer — 6 sold, every one with money recorded as received against a named unit, 1 booked with a price agreed but nothing received yet, and 76 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 29 April 2024.
MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.
Common questions
- Is Adorn Alcazar-Ii registered with MahaRERA?
- Yes. It is registered as P52100055872, filed on 29 April 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Adorn Alcazar-Ii due to be handed over?
- The promoter has told MahaRERA May 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Adorn Alcazar-Ii been delayed?
- Yes. The first date filed was January 2029. It now stands at May 2029, 4 months later.
- What did buyers actually pay in Adorn Alcazar-Ii?
- A median of ₹7,559 per square foot of carpet, across 7 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Adorn Alcazar-Ii?
- 76 of 83 were still unsold at the promoter's last filing, in 1, 2, 3 BHK + shops, from 393–887 sq ft of carpet.
- Are there complaints against Adorn Alcazar-Ii?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Adorn Alcazar-Ii?
- Hasib Ahmed Shaikh, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100055872 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Kondhwa Budruk
Stock image
- Nearby
- ₹6,898–7,916
- On offer
- 2, 3 BHK + shops
- Due
- Feb 2030
- Units
- 23
- Carpet
- 334–1,038
- Typical unit
- ~₹56.6 lakh
Stock image
- Locality median
- ₹6,663
- On offer
- 5 BHK
- Due
- Apr 2028
- Units
- 24
- Carpet
- 1,787–1,931
- Typical flat
- ~₹1.3 crore
Stock image
- Nearby
- ₹6,898
- On offer
- 2 BHK +2 more
- Due
- Apr 2029
- Units
- 40
- Carpet
- 699–1,637
- Typical unit
- ~₹57 lakh