Z Zomefy

RERA registered P52100048684 Active

Sara Business Hub

Kharabwadi, Pune · Commercial by Sara Towers Pvt Ltd

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Sara Business Hub in Kharabwadi is MahaRERA-registered (P52100048684) and still under construction, with possession filed for July 2027. No registered sale rate is on file for this project or its locality yet. About 99% of the 114 units are sold. Sara Towers Pvt Ltd is the promoter.

Stock image, not a photograph of Sara Business Hub Stock image
Where
Kharabwadi
pincode 410501
Price
Not filed
no agreement or valuation on the register
Available
Shops
1 left · 152 sq ft
Now due
Jul 2027
4 months later than first promised
A stock photograph, not Sara Business Hub. We have no picture of this site yet.

Where this is

Kharabwadi, PMRDA, Pune, 410501

Village
Kharabwadi (CT)
Taluka
Khed
Pincode
410501

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Unit sizes on file

All 114 units are filed unit by unit with the authority, the highest on floor 5. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Nothing filed here is a home. Every unit is registered as non-residential — shops, offices or similar — which is the promoter's own answer on the register rather than anything read off the areas below.

The largest unit here is filed at 19.42 sq m, about 209 sq ft. That is studio scale, not a one- or two-bedroom flat.

Office Space 94 units · all sold

5 units 137 sq ft 12.72 sq m as filed
8 units 148 sq ft 13.72 sq m as filed
40 units 152 sq ft 14.1 sq m as filed
36 units 183 sq ft 17.02 sq m as filed
5 units 209 sq ft 19.42 sq m as filed

Shops 20 units · 1 available

1 unit 137 sq ft 12.72 sq m as filed
2 units 150 sq ft 13.89 sq m as filed
8 units 152 sq ft 14.1 sq m as filed
6 units 183 sq ft 17.02 sq m as filed
2 units 184 sq ft 17.09 sq m as filed
1 unit 209 sq ft 19.42 sq m as filed
Units sold

113 / 114

Nearly sold out

99% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Footprints, not plans. What is registered here is sold as a shell, and the register files its area and nothing else — so each box below is one unit's filed carpet area, drawn to its size against the largest one here, and it says nothing about how the space is divided up.

Office Space 94 units · none available

152 sq ft carpet as drawn, from 137–209 sq ft filed in this configuration

Carpet, filed
152 sq ft
Built-up
about 182 sq ft
Super built-up
about 213 sq ft

Shops 20 units · 1 available

152 sq ft carpet as drawn, from 137–209 sq ft filed in this configuration

Carpet, filed
152 sq ft
Built-up
about 182 sq ft
Super built-up
about 213 sq ft

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

Timeline audit

Original proposed Mar 2027
Current status Due Jul 2027

Revised projection

The completion date has moved from March 2027 to July 2027, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

PLOT NO E-09 GUT NO 184,187 TO 189, 454 TO 456, 458 TO 460/1,3,4,5 AND 187/1 PART KHARABWADI TQ KHED DIST PUNE is the plot this project is built on, as filed
Revenue village Kharabwadi (CT) · shown on this site as Kharabwadi
TalukaKhed
Street, as filed Chakan Talegaon
Bounded north by 18 MTR WIDE ROAD
Bounded east by 9 MTR WIDE ROAD
Bounded south by PLOT NO E 14 and E 15
Bounded west by Building S3 - S4 and S5

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerSara Towers Pvt Ltd
Registered office11, Narayan Plaza, A-Wing, Opp Cannaught Garden, Cannaught Place, Aurangabad 431003

Professionals named on the filing

Architect Abs Architects
Engineer Parag Chopda
Chartered Accountant Yogesh J Agrawal And Co 119834

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

5 December 2022 is when an advocate last certified the title to this land
Title report SBH LEGAL TITL REPORT_0001_221205_170730_compressed (1).pdf 5 December 2022
Promoter's declaration, Form B FORM B COMPRESSED.pdf 5 December 2022

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100048684
Promoter Sara Towers Pvt Ltd
Project typeCommercial · Building development
LocalityKharabwadi — Khed taluka, pincode 410501
Applied on05 December 2022
Registered on12 January 2023
Completion, as first filed31 March 2027
Due31 July 2027 4 months later
Units declared114
Units sold 113 of 114 sold (99%), 1 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 28 July 2023
Application referenceREA52100125612
Current statusActive
Record last changed 20 July 2023 · over 3 years ago 3 years untouched

Where the sold count comes from, and whether it holds up. 113 of 114 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 114 units and reaches the same answer — 113 sold, every one with money recorded as received against a named unit, and 1 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 20 July 2023.

MahaRERA has not recorded a change to this project's record in 3 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Sara Business Hub registered with MahaRERA?
Yes. It is registered as P52100048684, filed on 12 January 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Sara Business Hub due to be handed over?
The promoter has told MahaRERA July 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Sara Business Hub been delayed?
Yes. The first date filed was March 2027. It now stands at July 2027, 4 months later.
How many units are left in Sara Business Hub?
1 of 114 were still unsold at the promoter's last filing, in Shops, from 152 sq ft of carpet.
Are there complaints against Sara Business Hub?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Sara Business Hub?
Sara Towers Pvt Ltd, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100048684 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Kharabwadi