RERA registered PM1260002602299 Active
Amit Elite
Katraj, Pune · Mixed by Harmony Developers
Official record Updated from the register 30 October 2026. Anything filed since then is not here yet.
In short
Amit Elite in Katraj is MahaRERA-registered (PM1260002602299) and still under construction, with possession filed for July 2029. No sales are registered in this project yet. Units the same size elsewhere in Katraj have registered at ₹5,396–7,204 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. Harmony Developers is the promoter.
- Nearby at
- ₹5,396–7,204
- per sq ft, same sizes in Katraj
- Available
- 1 Room Kitchen, 1 BHK, 2 BHK, Shops
- 9 left · 90–540 sq ft
- Possession
- Jul 2029
- as filed with MahaRERA
Katraj, PMC, Pune, 411046
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 17 units are filed unit by unit with the authority, the highest on floor 1. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 Room Kitchen Residences
1 BHK Residences
2 BHK Residences
Shops Suite
Carpet Area vs. Loading Factor Arithmetic
How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)
| Unit Configuration | Statutory RERA Carpet (Actual) | Approx Built-up (+20%) | Super Built-up (+40% Loading) | Available Inventory |
|---|---|---|---|---|
| 1 Room Kitchen | 252 sq ft (23.42 sq m) | ~302 sq ft | ~353 sq ft | 1 left of 1 |
| 1 BHK | 329 – 407 sq ft (30.57 – 37.79 sq m) | ~395 – 488 sq ft | ~461 – 570 sq ft | 1 left of 2 |
| 2 BHK | 522 – 540 sq ft (48.48 – 50.15 sq m) | ~626 – 648 sq ft | ~731 – 756 sq ft | 3 left of 3 |
| Shops | 90 – 180 sq ft (8.36 – 16.72 sq m) | ~108 – 216 sq ft | ~126 – 252 sq ft | 4 left of 11 |
0 / 17
0% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 Room Kitchen 1 unit · 1 available
252 sq ft carpet as drawn
- Carpet, filed
- 252 sq ft
- Built-up
- about 302 sq ft
- Super built-up
- about 353 sq ft
Every room in this unit
Living and sleeping about 151 sq ft, Kitchen about 50 sq ft, Bath about 28 sq ft, Balcony about 23 sq ft.
1 BHK 2 units · 1 available
329 sq ft carpet as drawn, from 329–407 sq ft filed in this configuration
- Carpet, filed
- 329 sq ft
- Built-up
- about 395 sq ft
- Super built-up
- about 461 sq ft
Every room in this unit
Living and dining about 123 sq ft, Master bedroom about 82 sq ft, Kitchen about 49 sq ft, Bath about 29 sq ft, Balcony about 29 sq ft, Passage about 16 sq ft.
2 BHK 3 units · 3 available
522 sq ft carpet as drawn, from 522–540 sq ft filed in this configuration
- Carpet, filed
- 522 sq ft
- Built-up
- about 626 sq ft
- Super built-up
- about 731 sq ft
Every room in this unit
Living and dining about 152 sq ft, Master bedroom about 101 sq ft, Second bedroom about 81 sq ft, Kitchen about 61 sq ft, Bath about 35 sq ft, Balcony about 35 sq ft, Second bath about 30 sq ft, Passage about 25 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What units like these cost nearby
No sale has been registered at Amit Elite yet. The promoter has filed no agreement values, so nothing below is this project's own price.
1,360 registered sale agreements across 22 nearby developments.
349 registered sale agreements across 24 nearby developments.
1 Room Kitchen, Shops are also on sale here, and Katraj has not registered enough sales of those to quote a rate for them.
Each rate is what buyers contracted to pay for the same configuration in Katraj, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Katraj.
The state values these at ₹7,432 per sq ft of carpet — one rate across all 8 still available, which puts the smallest at ₹6.7 lakh and the largest at ₹40.1 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Stable delivery projection
Stable project schedule. Zero slippage or revision requests reported since initial registration. Construction is recorded against the original baseline date.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Katraj Ext · shown on this site as Katraj |
|---|---|
| Taluka | Haveli |
| Street, as filed | katraj anjali nagar road |
| Bounded north by | ADJ S.NO. 50(P) |
| Bounded east by | 6 METER WIDE ROAD |
| Bounded south by | 12 METER WIDE ROAD |
| Bounded west by | ADJ S.NO. 50(P) |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Harmony Developers |
|---|---|
| Registered office | Shop No 10, 65/25/03/01, Harmony, Katraj Anajalinagar, Near Gandharv Karyalay, Katraj, Pune 411046 |
Professionals named on the filing
| Architect | Sidharam Huggi 1765 |
|---|---|
| Engineer | shreyas joshi |
| Chartered Accountant | Phule Wagh & Associates LLP 180704 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Harmony REPORT done.pdf | 26 August 2026 |
|---|---|
| Conveyance deed KHREDIp.pdf | 27 July 2026 |
| Promoter's declaration, Form B Form B .pdf | 30 July 2026 |
| Annexure A declaration anx a decleration cum undertaking.pdf | 30 July 2026 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PM1260002602299 |
| Promoter | Harmony Developers |
| Project type | Mixed · Building development |
| Locality | Katraj — Haveli taluka, pincode 411046 |
| Applied on | 30 July 2026 |
| Registered on | 14 October 2026 |
| Completion, as first filed | 01 July 2029 |
| Due | 01 July 2029 |
| Units declared | 17 |
| Units sold | None sold yet, all 17 on the market |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 14 October 2026 |
| Application reference | ACK27072602393 |
| Current status | Active |
| Record last changed | 14 October 2026 · 17 days ago |
Nothing has sold yet. The promoter's quarterly progress report says none of the 17 units are gone, and the unit-by-unit list they file separately says the same: all 17 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 14 October 2026.
- Is Amit Elite registered with MahaRERA?
- Yes. It is registered as PM1260002602299, filed on 14 October 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Amit Elite due to be handed over?
- The promoter has told MahaRERA July 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Amit Elite been delayed?
- No. July 2029 is the date first filed with the authority and it has not moved since.
- What does a unit in Amit Elite cost?
- Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Katraj have registered at ₹5,396–7,204 per square foot of carpet — the neighbourhood, not this building.
- How many units are left in Amit Elite?
- 9 of 17 were still unsold at the promoter's last filing, in 1, 2 BHK +2 more, from 90–540 sq ft of carpet.
- Are there complaints against Amit Elite?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Amit Elite?
- Harmony Developers, as the promoter named on the registration.
Verify Government Filings Yourself
This dossier restates public records as filed on 30 October 2026. The authority's own registry page for PM1260002602299 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.
MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.
Other projects in Katraj
Stock image
- Registered here
- ₹6,291
- On offer
- 1 BHK
- Due
- Apr 2027
- Units
- 45
- Carpet
- 453–524
- Sold at
- ₹33.8 lakh
Stock image
- Registered here
- ₹7,371
- On offer
- 1, 2 BHK
- Due
- Apr 2027
- Units
- 30
- Carpet
- 429–602
- Sold at
- ₹32.6 lakh
Stock image
- Nearby
- ₹5,396–7,204
- On offer
- 1, 2 BHK
- Due
- Apr 2027
- Units
- 16
- Carpet
- 403–587
- Typical flat
- ~₹25.4 lakh