In short

Life Republic Sector R5/5Th Avenue-Canvas/Phase-Ii in Jambe is MahaRERA-registered (PM1260002501184) and still under construction, with possession filed for April 2031. Buyers have already registered 67 sales here at a median ₹12,048 per sq ft of carpet — not an asking price. About 15% of the 461 units are sold. 1 complaint sits on the filing. Kolte-Patil Developers Limited is the promoter.

Stock image, not a photograph of Life Republic Sector R5/5Th Avenue-Canvas/Phase-Ii Stock image
Where
Jambe
pincode 411033
Sold here at
₹12,048
per sq ft, 67 registered sales
Available
2 BHK, 3 BHK, Shops
394 left · 816–2,627 sq ft
Now due
Apr 2031
4 months later than first promised
A stock photograph, not Life Republic Sector R5/5Th Avenue-Canvas/Phase-Ii. We have no picture of this site yet.

Where this is

Jambe, PMRDA, Pune, 411033

Street map of Jambe centred on the coordinate filed for Life Republic Sector R5/5Th Avenue-Canvas/Phase-Ii, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Jambe
Taluka
Mulshi
Pincode
411033
Coordinates
18.641792, 73.721306

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 461 units are filed unit by unit with the authority, the highest on floor 31. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 12 units · all available

12 units 908 sq ft 84.34 sq m as filed

3 BHK 321 units · 287 available

124 units 1152 sq ft 107.0 sq m as filed
137 units 1229 sq ft 114.18 sq m as filed
29 units 1268 sq ft 117.82 sq m as filed
29 units 1269 sq ft 117.92 sq m as filed
1 unit 1277 sq ft 118.67 sq m as filed
1 unit 1279 sq ft 118.78 sq m as filed

Configuration not filed 121 units · 88 available

1 unit 1152 sq ft 107.0 sq m as filed
29 units 1456 sq ft 135.31 sq m as filed
30 units 1464 sq ft 135.97 sq m as filed
29 units 1469 sq ft 136.44 sq m as filed
1 unit 1471 sq ft 136.63 sq m as filed
30 units 1475 sq ft 137.06–137.07 sq m as filed
1 unit 1482 sq ft 137.72 sq m as filed

Shops 7 units · all available

2 units 816 sq ft 75.84 sq m as filed
1 unit 995 sq ft 92.47 sq m as filed
1 unit 1750 sq ft 162.54 sq m as filed
1 unit 1763 sq ft 163.83 sq m as filed
1 unit 2167 sq ft 201.31 sq m as filed
1 unit 2627 sq ft 244.05 sq m as filed
Units sold

67 / 461

Early sales

15% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

2 BHK 12 units · 12 available

908 sq ft carpet as drawn

Carpet, filed
908 sq ft
Built-up
about 1,090 sq ft
Super built-up
about 1,271 sq ft
Every room in this unit

Living and dining about 264 sq ft, Master bedroom about 176 sq ft, Second bedroom about 141 sq ft, Kitchen about 106 sq ft, Bath about 62 sq ft, Balcony about 62 sq ft, Second bath about 53 sq ft, Passage about 44 sq ft.

3 BHK 321 units · 287 available

1,229 sq ft carpet as drawn, from 1,152–1,279 sq ft filed in this configuration

Carpet, filed
1,229 sq ft
Built-up
about 1,475 sq ft
Super built-up
about 1,721 sq ft
Every room in this unit

Living and dining about 302 sq ft, Master bedroom about 201 sq ft, Second bedroom about 161 sq ft, Third bedroom about 131 sq ft, Kitchen about 121 sq ft, Bath about 71 sq ft, Balcony about 71 sq ft, Second bath about 60 sq ft, Passage about 60 sq ft, Third bath about 50 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹12,048 per sq ft of carpet, median of 67 registered sales
Range across those sales ₹11,376 to ₹12,824 per sq ft
Sold and booked 0 sold, 67 booked
Still available 394 units, 816–2627 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2030
Current status Due Apr 2031

Revised projection

The completion date has moved from December 2030 to April 2031, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Survey No 86 Part (old Survey Number 118/1 Part, 120/3 Part, 121 Part), 118/1 Part, 120/1 (Part), 120/2 (Part), 121 (Part) is the plot this project is built on, as filed
Revenue village Jambe
TalukaMulshi
Street, as filed Jambhe
Bounded north by 18M wide road and Sector R8
Bounded east by Township green and 24M wide Rd and Sector EA3 C2
Bounded south by 18M wide road and Sector R4
Bounded west by Township boundary irrigation cancal and Sector R9

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerKolte-Patil Developers Limited
Registered office7th Floor And 8th Floor, Cts No. 14 (P), City Bay, Dhole Patil Road, 17 Boat Club Road, Pune 411001

Professionals named on the filing

Architect Kolhatkar and Gowaikar CA/2013/60570
Engineer Gaurag Joshi
Engineer Nitin Bherde
Chartered Accountant Vidhi S Shah & Associates 604690

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
SM12600078 Jan 2026 Order passed Jan 2026

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

3 October 2025 is when an advocate last certified the title to this land
Title report Title Report_.pdf 3 October 2025
Promoter's declaration, Form B Declaration - Form B.PDF 3 October 2025
Annexure A declaration Declaration - Multiple Projects.pdf 4 October 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPM1260002501184
Promoter Kolte-Patil Developers Limited
Project typeMixed · Building development
LocalityJambe — Mulshi taluka, pincode 411033
Applied on04 October 2025
Registered on13 October 2025
Completion, as first filed31 December 2030
Due30 April 2031 4 months later
Units declared461
Units sold 67 of 461 sold (15%), 394 still unsold
Complaints1 on record with MahaRERA
Certificate on file Corrected certificate, issued 10 February 2026
Application referenceACK03102503787
Current statusActive
Record last changed 13 October 2025 · 11 months ago

Where the sold count comes from, and whether it holds up. 67 of 461 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 461 units and reaches the same answer — 0 sold, 67 booked with a price agreed but nothing received yet, and 394 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 13 October 2025.

Common questions

Is Life Republic Sector R5/5Th Avenue-Canvas/Phase-Ii registered with MahaRERA?
Yes. It is registered as PM1260002501184, filed on 13 October 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Life Republic Sector R5/5Th Avenue-Canvas/Phase-Ii due to be handed over?
The promoter has told MahaRERA April 2031. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Life Republic Sector R5/5Th Avenue-Canvas/Phase-Ii been delayed?
Yes. The first date filed was December 2030. It now stands at April 2031, 4 months later.
What did buyers actually pay in Life Republic Sector R5/5Th Avenue-Canvas/Phase-Ii?
A median of ₹12,048 per square foot of carpet, across 67 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Life Republic Sector R5/5Th Avenue-Canvas/Phase-Ii?
394 of 461 were still unsold at the promoter's last filing, in 2, 3 BHK + shops, from 816–2,627 sq ft of carpet.
Are there complaints against Life Republic Sector R5/5Th Avenue-Canvas/Phase-Ii?
1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Life Republic Sector R5/5Th Avenue-Canvas/Phase-Ii?
Kolte-Patil Developers Limited, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 24 September 2026. The authority's own page for PM1260002501184 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Jambe

Stock image, not a photograph of Aster Park Stock image
Registered here
₹5,735
On offer
1, 2 BHK + shops
Under construction

Aster Park

Wakadkar Associate · Jambe

40 sold
Slipped 4 years
Due
Dec 2028
Units
81
Carpet
172–732
Sold at
₹30.5 lakh
P52100028092