Rahul Aston - II

Hinjewadi, Pune · Residential / Group Housing by Rahul Construction

Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.

In short

Rahul Aston - II in Hinjewadi is MahaRERA-registered (P52100076854) and still under construction, with possession filed for December 2026. Buyers have already registered 166 sales here at a median ₹12,341 per sq ft of carpet — not an asking price. About 76% of the 217 units are sold. 1 complaint sits on the filing. Rahul Construction is the promoter.

Stock image, not a photograph of Rahul Aston - II Stock image
Where
Hinjewadi
pincode 411057
Sold here at
₹12,341
per sq ft, 166 registered sales
Available
1, 2, 3 BHK
48 left · 486–841 sq ft
Now due
Dec 2026
9 months later than first promised
A stock photograph, not Rahul Aston - II. We have no picture of this site yet.

Where this is

Hinjewadi, PMRDA, Pune, 411057

Village
Hinjavadi (CT)
Taluka
Mulshi
Pincode
411057

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 217 flats are filed unit by unit with the authority, the highest on floor 22. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 3 units · 2 available

3 units 486 sq ft 45.16 sq m as filed

2 BHK 131 units · 11 available

64 units 645 sq ft 59.95–59.96 sq m as filed
67 units 646 sq ft 59.97 sq m as filed

3 BHK 83 units · 35 available

44 units 834 sq ft 77.46 sq m as filed
20 units 838 sq ft 77.87 sq m as filed
19 units 841 sq ft 78.11 sq m as filed
Units sold

166 / 217

Selling steadily

76% absorption rate

Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 3 flats · 2 available

486 sq ft carpet as drawn

Carpet, filed
486 sq ft
Built-up
about 583 sq ft
Super built-up
about 680 sq ft
Every room in this flat

Living and dining about 182 sq ft, Master bedroom about 122 sq ft, Kitchen about 73 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Passage about 24 sq ft.

2 BHK 131 flats · 11 available

646 sq ft carpet as drawn, from 645–646 sq ft filed in this configuration

Carpet, filed
646 sq ft
Built-up
about 775 sq ft
Super built-up
about 904 sq ft
Every room in this flat

Living and dining about 188 sq ft, Master bedroom about 125 sq ft, Second bedroom about 100 sq ft, Kitchen about 75 sq ft, Bath about 44 sq ft, Balcony about 44 sq ft, Second bath about 38 sq ft, Passage about 31 sq ft.

3 BHK 83 flats · 35 available

834 sq ft carpet as drawn, from 834–841 sq ft filed in this configuration

Carpet, filed
834 sq ft
Built-up
about 1,001 sq ft
Super built-up
about 1,168 sq ft
Every room in this flat

Living and dining about 205 sq ft, Master bedroom about 137 sq ft, Second bedroom about 109 sq ft, Third bedroom about 89 sq ft, Kitchen about 82 sq ft, Bath about 48 sq ft, Balcony about 48 sq ft, Second bath about 41 sq ft, Passage about 41 sq ft, Third bath about 34 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹12,341 per sq ft of carpet, median of 166 registered sales
Range across those sales ₹7,833 to ₹14,752 per sq ft
Sold and booked 157 sold, 9 booked
Still available 48 flats, 486–841 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Apr 2026
Current status Due Dec 2026

Revised projection

The completion date has moved from April 2026 to December 2026, 9 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

10/3, 13/4, 13/8, 14/1, 14/2, 14/5, 14/6 is the plot this project is built on, as filed
Revenue village Hinjavadi (CT) · shown on this site as Hinjewadi
TalukaMulshi
Street, as filed Near D Mart
Bounded north by 7 and half Mtr Wide Drive Way
Bounded east by 7 and half Mtr Wide Drive way
Bounded south by 7 and Half Mtr Wide Drive way
Bounded west by 7 and half Mtr Wide Drive Way

All four boundaries are filed as the same thing, which satisfies the form without locating the plot. It is not a warning about the project — the survey number above does the locating — but it does mean the four rows here tell you one fact rather than four.

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerRahul Construction
Registered office115/B, ---, Rahul Capital, Prabhat Road, Opp Prabhat Police Chowky, Deccan Gymkhana, Pune 411004

Professionals named on the filing

Architect Pandit Joshi & Associates CA/77/3917
Engineer Suraj Jadhav Sr. No. B - 17 : 19940
Chartered Accountant K G Jhamvar & Co 167515
Chartered Accountant Sameer Rajanikant Birla 111974
Chartered Accountant Sammer 111974

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
SM12600068 Jan 2026 Order passed Jan 2026

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

20 February 2024 is when an advocate last certified the title to this land
Title report Title Search.pdf 20 February 2024
Promoter's declaration, Form B Form B.pdf 29 November 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100076854
Promoter Rahul Construction
Project typeResidential / Group Housing · Building development
LocalityHinjewadi — Mulshi taluka, pincode 411057
Applied on05 January 2024
Registered on03 July 2024
Completion, as first filed15 April 2026
Due31 December 2026 9 months later
Units declared217
Units sold 166 of 217 sold (76%), 51 still unsold
Complaints1 on record with MahaRERA
Certificate on file Extension certificate, issued 04 August 2026
Application referenceREA52100151834
Current statusActive
Record last changed 05 August 2026 · 42 days ago

Where the sold count comes from, and whether it holds up. 166 of 217 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 217 flats and reaches the same answer — 157 sold, every one with money recorded as received against a named flat, 9 booked with a price agreed but nothing received yet, and 48 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 05 August 2026.

Common questions

Is Rahul Aston - II registered with MahaRERA?
Yes. It is registered as P52100076854, filed on 03 July 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Rahul Aston - II due to be handed over?
The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Rahul Aston - II been delayed?
Yes. The first date filed was April 2026. It now stands at December 2026, 9 months later.
What did buyers actually pay in Rahul Aston - II?
A median of ₹12,341 per square foot of carpet, across 166 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Rahul Aston - II?
48 of 217 were still unsold at the promoter's last filing, in 1, 2, 3 BHK, from 486–841 sq ft of carpet.
Are there complaints against Rahul Aston - II?
1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Rahul Aston - II?
Rahul Construction, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100076854 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Hinjewadi