RERA registered P52100035207 Active
Kumar Prospera - A7 and A8
Hadapsar, Pune · Residential / Group Housing by Kumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV
Official record Updated from the register 10 October 2026. Anything filed since then is not here yet.
In short
Kumar Prospera - A7 and A8 in Hadapsar is MahaRERA-registered (P52100035207) and still under construction, with possession filed for July 2027. Buyers have already registered 177 sales here at a median ₹11,770 per sq ft of carpet — not an asking price. Kumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV is the promoter.
- Sold here at
- ₹11,770
- per sq ft, 177 registered sales
- Available
- 2, 3 BHK
- 7 left · 813–1,173 sq ft
- Now due
- Jul 2027
- a year later than first promised
Where this is
Hadapsar, PMC, Pune, 411028
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 184 flats are filed unit by unit with the authority, the highest on floor 23. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 96 units · 5 available
3 BHK 88 units · 2 available
167 / 184
91% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 96 flats · 5 available
813 sq ft carpet as drawn, from 813–942 sq ft filed in this configuration
- Carpet, filed
- 813 sq ft
- Built-up
- about 976 sq ft
- Super built-up
- about 1,138 sq ft
Every room in this flat
Living and dining about 237 sq ft, Master bedroom about 158 sq ft, Second bedroom about 126 sq ft, Kitchen about 95 sq ft, Bath about 55 sq ft, Balcony about 55 sq ft, Second bath about 47 sq ft, Passage about 39 sq ft.
3 BHK 88 flats · 2 available
1,173 sq ft carpet as drawn
- Carpet, filed
- 1,173 sq ft
- Built-up
- about 1,408 sq ft
- Super built-up
- about 1,642 sq ft
Every room in this flat
Living and dining about 288 sq ft, Master bedroom about 192 sq ft, Second bedroom about 154 sq ft, Third bedroom about 125 sq ft, Kitchen about 115 sq ft, Bath about 67 sq ft, Balcony about 67 sq ft, Second bath about 58 sq ft, Passage about 58 sq ft, Third bath about 48 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹8,954 to ₹25,668 per sq ft |
|---|---|
| Sold and booked | 166 sold, 11 booked |
| Still available | 7 flats, 813–1173 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from July 2026 to July 2027, a year later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Hadapsar |
|---|---|
| Taluka | Haveli |
| Street, as filed | Hadapsar Mundhwa Road |
| Bounded north by | Adjoining Survey No 242 |
| Bounded east by | Boundary |
| Bounded south by | Open Space and Ongoing Project |
| Bounded west by | Ongoing Project |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Kumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV |
|---|---|
| Registered office | 2413, Kumar Capital, East Street, Besides Axis Bank, Camp, Pune 411001 |
| Registered agents | 500 licensed agents may sell this project |
Professionals named on the filing
| Architect | Shilpa Patil CA/2004/32750 |
|---|---|
| Architect | Vishal Deshpande CA 2008/42068 |
| Engineer | Harshad Pendase |
| Engineer | Sunil Mane |
| Chartered Accountant | GMKS & Co. 134685 |
| Chartered Accountant | GMKS & Co. 134685 |
| Chartered Accountant | Supriya Mundada 156545 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report 230406_Continuation Title Opinion.pdf | 6 April 2023 3 older versions on file |
|---|---|
| Promoter's declaration, Form B Form B_Declaration.pdf | 25 June 2025 4 older versions on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100035207 |
| Promoter | Kumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV |
| Project type | Residential / Group Housing · Building development |
| Locality | Hadapsar — Haveli taluka, pincode 411028 |
| Applied on | 26 April 2022 |
| Registered on | 10 May 2022 |
| Completion, as first filed | 01 July 2026 |
| Due | 01 July 2027 a year later |
| Units declared | 184 |
| Units sold | 167 of 184 sold (91%), 17 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 14 August 2026 |
| Application reference | REA52100107275 |
| Current status | Active |
| Record last changed | 27 May 2026 · 4 months ago |
Where the sold count comes from, and whether it holds up. 167 of 184 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 167 of 184 sold, leaving 17. The unit-by-unit list they file separately covers 184 flats and marks 166 sold with 7 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 27 May 2026.
Common questions
- Is Kumar Prospera - A7 and A8 registered with MahaRERA?
- Yes. It is registered as P52100035207, filed on 10 May 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Kumar Prospera - A7 and A8 due to be handed over?
- The promoter has told MahaRERA July 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Kumar Prospera - A7 and A8 been delayed?
- Yes. The first date filed was July 2026. It now stands at July 2027, a year later.
- What did buyers actually pay in Kumar Prospera - A7 and A8?
- A median of ₹11,770 per square foot of carpet, across 177 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Kumar Prospera - A7 and A8?
- 7 of 184 were still unsold at the promoter's last filing, in 2, 3 BHK, from 813–1,173 sq ft of carpet.
- Are there complaints against Kumar Prospera - A7 and A8?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Kumar Prospera - A7 and A8?
- Kumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 10 October 2026. The authority's own page for P52100035207 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Hadapsar
Stock image
- Registered here
- ₹7,397
- On offer
- 2 BHK
- Due
- Oct 2026
- Units
- 130
- Carpet
- 519–567
- Sold at
- ₹40.8 lakh
Stock image
- Due
- Jul 2028
- Units
- —
- Carpet
- —
- Typical unit
- —
Stock image
- Due
- Apr 2027
- Units
- —
- Carpet
- —
- Typical flat
- —