In short

Kumar Primeview E3 in Hadapsar is MahaRERA-registered (P52100077087) and still under construction, with possession filed for July 2029. Buyers have already registered 191 sales here at a median ₹8,236 per sq ft of carpet — not an asking price. About 80% of the 239 units are sold. Kumar Properties & Promoters Private Limited is the promoter.

Stock image, not a photograph of Kumar Primeview E3 Stock image
Where
Hadapsar
pincode 411028
Sold here at
₹8,236
per sq ft, 191 registered sales
Available
2 BHK, Shops
48 left · 350–816 sq ft
Now due
Jul 2029
4 months later than first promised
A stock photograph, not Kumar Primeview E3. We have no picture of this site yet.

Where this is

Hadapsar, PMC, Pune, 411028

Village
Hadapsar
Taluka
Haveli
Pincode
411028

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Unit sizes on file

All 239 units are filed unit by unit with the authority, the highest on floor 29. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 223 units · 32 available

1 unit 586 sq ft 54.44 sq m as filed
51 units 635 sq ft 59.03 sq m as filed
51 units 653 sq ft 60.63 sq m as filed
57 units 672 sq ft 62.41 sq m as filed
58 units 689 sq ft 64.03 sq m as filed
5 units 816 sq ft 75.77 sq m as filed

Shops 16 units · all available

2 units 350 sq ft 32.48 sq m as filed
2 units 352 sq ft 32.66 sq m as filed
2 units 361 sq ft 33.55 sq m as filed
2 units 386 sq ft 35.87 sq m as filed
2 units 392 sq ft 36.39 sq m as filed
2 units 396 sq ft 36.83 sq m as filed
2 units 572 sq ft 53.11 sq m as filed
2 units 583 sq ft 54.17–54.18 sq m as filed
Units sold

191 / 239

Nearly sold out

80% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

2 BHK 223 units · 32 available

689 sq ft carpet as drawn, from 586–816 sq ft filed in this configuration

Carpet, filed
689 sq ft
Built-up
about 827 sq ft
Super built-up
about 965 sq ft
Every room in this unit

Living and dining about 201 sq ft, Master bedroom about 134 sq ft, Second bedroom about 107 sq ft, Kitchen about 80 sq ft, Bath about 47 sq ft, Balcony about 47 sq ft, Second bath about 40 sq ft, Passage about 33 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹8,236 per sq ft of carpet, median of 191 registered sales
Range across those sales ₹7,729 to ₹9,026 per sq ft
Sold and booked 191 sold, 0 booked
Still available 48 units, 350–816 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Mar 2029
Current status Due Jul 2029

Revised projection

The completion date has moved from March 2029 to July 2029, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S. No. 55 Hissa No. 1/2/3 is the plot this project is built on, as filed
Revenue village Hadapsar
TalukaHaveli
Street, as filed Hadapsar
Bounded north by By 18 mtrs wide DP Road
Bounded east by By Podium out of the said Project
Bounded south by By Building No E2
Bounded west by By 18 mtrs wide DP Road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerKumar Properties & Promoters Private Limited
Registered office2413, 3rd Floor, Kumar Capital, East Street, Near Poolgate, Camp, Pune 411001
Registered agents 1 licensed agent may sell this project

Professionals named on the filing

Architect Samir Valimbe
Architect Samir Valimbe CA/92/14618
Engineer Abhijeet Shekhar
Engineer Abhijeet Shekhar
Chartered Accountant Spak & Co. 172292
Chartered Accountant Supriya Abhijeet Mundada 156545
Chartered Accountant Supriya Abhijit Mundada

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

27 May 2024 is when an advocate last certified the title to this land
Title report RERA-Legal title report-PrimeView-E3_compressed.pdf 27 May 2024
Promoter's declaration, Form B Form B - Revised_compressed.pdf 14 May 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100077087
Promoter Kumar Properties & Promoters Private Limited
Project typeResidential / Group Housing · Building development
LocalityHadapsar — Haveli taluka, pincode 411028
Applied on06 May 2024
Registered on23 July 2024
Completion, as first filed31 March 2029
Due31 July 2029 4 months later
Units declared239
Units sold 191 of 239 sold (80%), 48 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 23 July 2024
Application referenceREA52100157923
Current statusActive
Record last changed 16 January 2025 · 20 months ago

Where the sold count comes from, and whether it holds up. 191 of 239 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 239 units and reaches the same answer — 191 sold, every one with money recorded as received against a named unit, and 48 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 16 January 2025.

Common questions

Is Kumar Primeview E3 registered with MahaRERA?
Yes. It is registered as P52100077087, filed on 23 July 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Kumar Primeview E3 due to be handed over?
The promoter has told MahaRERA July 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Kumar Primeview E3 been delayed?
Yes. The first date filed was March 2029. It now stands at July 2029, 4 months later.
What did buyers actually pay in Kumar Primeview E3?
A median of ₹8,236 per square foot of carpet, across 191 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Kumar Primeview E3?
48 of 239 were still unsold at the promoter's last filing, in 2 BHK + shops, from 350–816 sq ft of carpet.
Are there complaints against Kumar Primeview E3?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Kumar Primeview E3?
Kumar Properties & Promoters Private Limited, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100077087 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Hadapsar

Stock image, not a photograph of Rajyog Stock image
Registered here
₹5,789
On offer
1, 2 BHK +2 more
Under construction

Rajyog

Shree Vyankatesh Landmarks · Hadapsar

16 sold
Slipped 4 months
Due
Oct 2027
Units
57
Carpet
257–1,349
Sold at
₹37.5 lakh
P52100077737
Stock image, not a photograph of Ratan Heights Stock image
Nearby
₹10,354–10,461
On offer
1, 2 BHK
Under construction

Ratan Heights

Dipti Harshata Construction · Hadapsar

0 sold
Slipped 4 months
Due
Apr 2029
Units
16
Carpet
409–527
Typical flat
~₹45.9 lakh
P52100049524
Stock image, not a photograph of Ratnaa Residency Stock image
Registered here
₹6,503
On offer
2 BHK
Under construction

Ratnaa Residency

Narmada Promoters and Builders · Hadapsar

53 sold
Slipped 4 months
Due
Apr 2029
Units
15
Carpet
606–691
Sold at
₹44.9 lakh
PR1260002500836