In short
Park Imperial Tower A in Hadapsar is MahaRERA-registered (PR1261012600792) and still under construction, with possession filed for December 2034. No sales are registered in this project yet. Units the same size elsewhere in Hadapsar have registered at ₹12,198 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. Iqoniq shelters llp is the promoter.
- Nearby at
- ₹12,198
- per sq ft, same sizes in Hadapsar
- Available
- 3 BHK
- 151 left · 1,031–1,259 sq ft
- Possession
- Dec 2034
- as filed with MahaRERA
Where this is
Hadapsar, PMC, Pune, 411028
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 151 flats are filed unit by unit with the authority, the highest on floor 26. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
3 BHK 125 units · all available
Configuration not filed 26 units · all available
0 / 151
0% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
3 BHK 125 flats · 125 available
1,036 sq ft carpet as drawn, from 1,031–1,057 sq ft filed in this configuration
- Carpet, filed
- 1,036 sq ft
- Built-up
- about 1,243 sq ft
- Super built-up
- about 1,450 sq ft
Every room in this flat
Living and dining about 255 sq ft, Master bedroom about 170 sq ft, Second bedroom about 136 sq ft, Third bedroom about 110 sq ft, Kitchen about 102 sq ft, Bath about 59 sq ft, Balcony about 59 sq ft, Second bath about 51 sq ft, Passage about 51 sq ft, Third bath about 42 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What flats like these cost nearby
No sale has been registered at Park Imperial Tower A yet. The promoter has filed no agreement values, so nothing below is this project's own price.
| On sale here | Registered in Hadapsar | Which for this size is |
|---|---|---|
| 3 BHK 1,031–1,057 sq ft | ₹12,198/sq ft 1781 sales, 33 projects | ₹1.3 crore–₹1.3 crore middle half ₹10,991–13,186/sq ft |
Each rate is what buyers contracted to pay for the same configuration in Hadapsar, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Hadapsar.
The government's valuation of the unsold flats
| On sale here | Carpet | Valued at no less than |
|---|---|---|
| 3 BHK 125 unsold | 1,031–1,057 sq ft | ₹83.8 lakh–₹89.6 lakh ₹8,194/sq ft |
| Not named 26 unsold | 1,259 sq ft | ₹1 crore ₹7,997/sq ft |
This is the Annual Statement of Rates value the promoter filed against each unsold flat — the state's valuation, not an asking price and not a discount. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Hadapsar |
|---|---|
| Taluka | Haveli |
| Street, as filed | HADPSAR |
| Bounded north by | By C.T.S. no. 4684/canal road/ C.T.S. 4711. |
| Bounded east by | By C.T.S. nos. 4682, 4683. |
| Bounded south by | By C.T.S. nos. 4681, 4685. |
| Bounded west by | By D.P. road, C.T.S. nos. 4708 to 4711 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Iqoniq shelters llp |
|---|---|
| Registered office | 2413, 3rd Floor, Kumar Capital, East Street, Near Poolgate, Camp, Pune 411001 |
Professionals named on the filing
| Architect | Voussoirs CA/92/14618 |
|---|---|
| Engineer | Kumar Properties And Promoters Pvt Ltd NA |
| Chartered Accountant | Supriya Abhijit Mundada 156545 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report title.pdf | 20 April 2026 |
|---|---|
| Conveyance deed Deed of Conveyance 1-15.pdf | 20 April 2026 2 older versions on file |
| Promoter's declaration, Form B FORM B AFFIDAVIT DECLARATION.pdf | 18 April 2026 |
| Annexure A declaration Annexure A Declaration cum Undertaking (2).pdf | 20 April 2026 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PR1261012600792 |
| Promoter | Iqoniq shelters llp |
| Project type | Residential / Group Housing · Building development |
| Locality | Hadapsar — Haveli taluka, pincode 411028 |
| Applied on | 21 April 2026 |
| Registered on | 15 June 2026 |
| Completion, as first filed | 31 December 2034 |
| Due | 31 December 2034 |
| Units declared | 151 |
| Units sold | None sold yet, all 151 on the market |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 15 June 2026 |
| Application reference | ACK18042600365 |
| Current status | Active |
| Record last changed | 15 June 2026 · 3 months ago |
Nothing has sold yet. The promoter's quarterly progress report says none of the 151 flats are gone, and the unit-by-unit list they file separately says the same: all 151 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 15 June 2026.
Common questions
- Is Park Imperial Tower A registered with MahaRERA?
- Yes. It is registered as PR1261012600792, filed on 15 June 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Park Imperial Tower A due to be handed over?
- The promoter has told MahaRERA December 2034. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Park Imperial Tower A been delayed?
- No. December 2034 is the date first filed with the authority and it has not moved since.
- What does a flat in Park Imperial Tower A cost?
- Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Hadapsar have registered at ₹12,198 per square foot of carpet — the neighbourhood, not this building.
- How many flats are left in Park Imperial Tower A?
- 151 of 151 were still unsold at the promoter's last filing, in 3 BHK, from 1,031–1,259 sq ft of carpet.
- Are there complaints against Park Imperial Tower A?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Park Imperial Tower A?
- Iqoniq shelters llp, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for PR1261012600792 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Hadapsar
Stock image
- Registered here
- ₹6,240
- On offer
- 2 BHK
- Due
- Dec 2026
- Units
- 80
- Carpet
- 625–783
- Sold at
- ₹44.5 lakh
Stock image
- Nearby
- ₹10,354–10,578
- On offer
- 1, 2 BHK + shops
- Due
- Apr 2030
- Units
- 151
- Carpet
- 255–540
- Typical unit
- ~₹34.4 lakh
Stock image
- Nearby
- ₹10,354–12,198
- On offer
- 1, 2, 3 BHK + shops
- Due
- Dec 2029
- Units
- 90
- Carpet
- 336–917
- Typical unit
- ~₹82.3 lakh