Z Zomefy

RERA registered PR1260002602720 Active

Namo Casa

Dhanori, Pune · Residential / Group Housing by Namo Realty

Official record Updated from the register 14 November 2026. Anything filed since then is not here yet.

In short

Namo Casa in Dhanori is MahaRERA-registered (PR1260002602720) and still under construction, with possession filed for December 2028. No sales are registered in this project yet. Units the same size elsewhere in Dhanori have registered at ₹7,812 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. Namo Realty is the promoter.

Stock image, not a photograph of Namo Casa Stock image
Where
Dhanori
pincode 411015
Nearby at
₹7,812
per sq ft, same sizes in Dhanori
Available
2 BHK
16 left · 544–548 sq ft
Possession
Dec 2028
as filed with MahaRERA
A stock photograph, not Namo Casa. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Dhanori · Haveli

Dhanori, PMC, Pune, 411015

Village Dhanori
Taluka Haveli
Pincode 411015
Promoter Pin Coordinates 18.589887, 73.900511

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 16 flats are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Configuration Mix & Volume Proportional share of project density
16 Total Licenced Units
Residential Typology • 100.0% of tower

2 BHK Residences

16 Available 16 registered total
Estimated Market Window ₹42.5 lakh – ₹42.8 lakh
Locality Benchmark ₹7,812 / sq ft
Carpet Variations as Filed Span: 544 to 548 sq ft
544 sq ft 50.53 sq m 8 units
548 sq ft 50.9 sq m 8 units
Govt ASR Base: ₹32.2 lakh – ₹32.4 lakh 16 of 16 available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
2 BHK 544 – 548 sq ft (50.53 – 50.9 sq m) ~653 – 658 sq ft ~762 – 767 sq ft 16 left of 16
Units sold

0 / 16

Pre-launch / early phase

0% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 16 flats · 16 available

544 sq ft carpet as drawn, from 544–548 sq ft filed in this configuration

Carpet, filed
544 sq ft
Built-up
about 653 sq ft
Super built-up
about 762 sq ft
Every room in this flat

Living and dining about 158 sq ft, Master bedroom about 106 sq ft, Second bedroom about 85 sq ft, Kitchen about 63 sq ft, Bath about 37 sq ft, Balcony about 37 sq ft, Second bath about 32 sq ft, Passage about 26 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What flats like these cost nearby

No sale has been registered at Namo Casa yet. The promoter has filed no agreement values, so nothing below is this project's own price.

Independent Market Intelligence

Registered Agreement Rates in Dhanori

Based on 2,038 government-stamped sale deeds registered for identical carpet bands across nearby developments.

2 BHK 544–548 sq ft
₹7,812 / sq ft

2,038 registered sale agreements across 40 nearby developments.

Estimated Unit Market Window ₹42.5 lakh – ₹42.8 lakh
Middle Half (IQR) ₹7,013 – ₹8,544 / sq ft
25th percentile: ₹7,013 75th percentile: ₹8,544

Each rate is what buyers contracted to pay for the same configuration in Dhanori, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Dhanori.

The state values these at ₹5,921 per sq ft of carpet — one rate across all 16 still available, which puts the smallest at ₹32.2 lakh and the largest at ₹32.4 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State On Scheduled Baseline
Original Baseline
Dec 2028
Declared at registration
Current Statutory Date
Due
Dec 2028
Identical to original baseline

Stable delivery projection

Stable project schedule. Zero slippage or revision requests reported since initial registration. Construction is recorded against the original baseline date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

25A 9(P) is the plot this project is built on, as filed
Revenue village Dhanori
TalukaHaveli
Street, as filed Survey No.25A/9
Bounded north by By 10 Ft. Road
Bounded east by By Remaining land of Same S. No.
Bounded south by By Remaining land of Same S. No.
Bounded west by By 12 Ft. Road & Property of Mr. Nadar

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerNamo Realty
Registered officeR.H No 40, 40, Hermes Heritage Phase 2, Samrat Ashok Road, Near Sahyadri Hospital, Shastri Nagar, Pune 411014

Professionals named on the filing

Architect Somnath S Kerur LE/PMC/396/26
Engineer Mahadev Jagannath Borade RGE/PMC/STE/0916/15
Engineer Ravindra Ashok Karnavat MISSE-626
Chartered Accountant Pravin Lakhmichand Phulphagar 048549
Chartered Accountant Vishal Vijay Phulphagar 174855

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

2 November 2026 is when an advocate last certified the title to this land
Title report legal title report.pdf 2 November 2026 1 older version on file
Conveyance deed sathbara.pdf 26 October 2026 1 older version on file
Promoter's declaration, Form B Form B Affidavit cum Declaration.pdf 25 September 2026
Annexure A declaration Annexure A Declaration cum Undertaking.pdf 25 September 2026

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPR1260002602720
Promoter Namo Realty
Project typeResidential / Group Housing · Building development
LocalityDhanori — Haveli taluka, pincode 411015
Applied on26 September 2026
Registered on09 November 2026
Completion, as first filed31 December 2028
Due31 December 2028
Units declared16
Units sold None sold yet, all 16 on the market
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 09 November 2026
Application referenceACK25092603438
Current statusActive
Record last changed 09 November 2026 · 5 days ago

Nothing has sold yet. The promoter's quarterly progress report says none of the 16 flats are gone, and the unit-by-unit list they file separately says the same: all 16 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 09 November 2026.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 7 Direct Answers
Is Namo Casa registered with MahaRERA?
Yes. It is registered as PR1260002602720, filed on 09 November 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Namo Casa due to be handed over?
The promoter has told MahaRERA December 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Namo Casa been delayed?
No. December 2028 is the date first filed with the authority and it has not moved since.
What does a flat in Namo Casa cost?
Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Dhanori have registered at ₹7,812 per square foot of carpet — the neighbourhood, not this building.
How many flats are left in Namo Casa?
16 of 16 were still unsold at the promoter's last filing, in 2 BHK, from 544–548 sq ft of carpet.
Are there complaints against Namo Casa?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Namo Casa?
Namo Realty, as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 14 November 2026. The authority's own registry page for PR1260002602720 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Dhanori