RERA registered P52100055453 Active

9 Jagdish

Deccan Gymkhana, Pune · Residential / Group Housing by Trisha Constrotech

Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.

In short

9 Jagdish in Deccan Gymkhana is MahaRERA-registered (P52100055453) and still under construction, with possession filed for March 2027. Buyers have already registered 10 sales here at a median ₹16,272 per sq ft of carpet — not an asking price. About 40% of the 25 units are sold. Trisha Constrotech is the promoter.

Stock image, not a photograph of 9 Jagdish Stock image
Where
Deccan Gymkhana
pincode 411004
Sold here at
₹16,272
per sq ft, 10 registered sales
Available
3 BHK
15 left · 1,240–1,249 sq ft
Possession
Mar 2027
as filed with MahaRERA
A stock photograph, not 9 Jagdish. We have no picture of this site yet.

Where this is

Deccan Gymkhana, Pune, 411004

Village
Pune (M Corp.)
Taluka
Pune City
Pincode
411004

The promoter filed a coordinate that falls outside Pune district, so it is not used here. The link above searches Maps by name and locality instead.

Flat sizes on file

All 25 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

3 BHK 25 units · 15 available

12 units 1240 sq ft 115.2 sq m as filed
13 units 1249 sq ft 116.03 sq m as filed
Units sold

10 / 25

Selling steadily

40% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

3 BHK 25 flats · 15 available

1,249 sq ft carpet as drawn, from 1,240–1,249 sq ft filed in this configuration

Carpet, filed
1,249 sq ft
Built-up
about 1,499 sq ft
Super built-up
about 1,749 sq ft
Every room in this flat

Living and dining about 307 sq ft, Master bedroom about 205 sq ft, Second bedroom about 164 sq ft, Third bedroom about 133 sq ft, Kitchen about 123 sq ft, Bath about 72 sq ft, Balcony about 72 sq ft, Second bath about 61 sq ft, Passage about 61 sq ft, Third bath about 51 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹16,272 per sq ft of carpet, median of 10 registered sales
Range across those sales ₹13,451 to ₹22,491 per sq ft
Sold and booked 9 sold, 1 booked
Still available 15 flats, 1240–1249 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Mar 2027
Current status Due Mar 2027

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

FINAL PLOT NO 35/9, TPS 1, PRABHAT ROAD, VILLAGE ERANDWANE, PUNE 411004 is the plot this project is built on, as filed
Revenue village Pune (M Corp.) · shown on this site as Deccan Gymkhana
TalukaPune City
Street, as filed PRABHAT ROAD
Bounded north by FINAL PLOT NO 35 10
Bounded east by FINAL PLOT NO 31 3 AND 31 4
Bounded south by 20 FEET ROAD
Bounded west by FINAL PLOT NO 35 8

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerTrisha Constrotech
Registered office501 Aditri, Aditri, Pandurang Colony, Near Sahakr Udyan, Erandawane, Pune 411004

Professionals named on the filing

Architect Abhiraj Ravindra Mahadik CA/2021/137119
Architect Sandip Hardikar CA/90/12777
Engineer Mayur Gajanan Saoji
Engineer Umesh Kadam
Chartered Accountant Nitesh Mukadam 157728

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

8 February 2024 is when an advocate last certified the title to this land
Title report Title Report.pdf 8 February 2024
Conveyance deed sale deed index 2.pdf 30 July 2025
Promoter's declaration, Form B FORM B FORMAT.pdf 7 February 2024
Annexure A declaration sale deed index 2.pdf 30 July 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100055453
Promoter Trisha Constrotech
Project typeResidential / Group Housing · Building development
LocalityDeccan Gymkhana — Pune City taluka, pincode 411004
Applied on08 February 2024
Registered on22 March 2024
Completion, as first filed31 March 2027
Due31 March 2027
Units declared25
Units sold 10 of 25 sold (40%), 15 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 22 March 2024
Application referenceREA52100153160
Current statusActive
Record last changed 22 March 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 10 of 25 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 25 flats and reaches the same answer — 9 sold, every one with money recorded as received against a named flat, 1 booked with a price agreed but nothing received yet, and 15 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 22 March 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is 9 Jagdish registered with MahaRERA?
Yes. It is registered as P52100055453, filed on 22 March 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is 9 Jagdish due to be handed over?
The promoter has told MahaRERA March 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has 9 Jagdish been delayed?
No. March 2027 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in 9 Jagdish?
A median of ₹16,272 per square foot of carpet, across 10 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in 9 Jagdish?
15 of 25 were still unsold at the promoter's last filing, in 3 BHK, from 1,240–1,249 sq ft of carpet.
Are there complaints against 9 Jagdish?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building 9 Jagdish?
Trisha Constrotech, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100055453 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Deccan Gymkhana

Stock image, not a photograph of Ankur Stock image
Registered here
₹20,731
On offer
3 BHK
Under construction

Ankur

S K Fortune Developers · Deccan Gymkhana

83 sold
Due
Dec 2026
Units
24
Carpet
1,196–1,197
Sold at
₹2.5 crore
P52100049906