Z Zomefy

RERA registered P52100049906 Active

Ankur

Deccan Gymkhana, Pune · Residential / Group Housing by S K Fortune Developers

Official record Updated from the register 12 September 2026. Anything filed since then is not here yet.

In short

Ankur in Deccan Gymkhana is MahaRERA-registered (P52100049906) and still under construction, with possession filed for December 2026. Buyers have already registered 20 sales here at a median ₹20,731 per sq ft of carpet — not an asking price. About 83% of the 24 units are sold. S K Fortune Developers is the promoter.

Stock image, not a photograph of Ankur Stock image
Where
Deccan Gymkhana
pincode 411004
Sold here at
₹20,731
per sq ft, 20 registered sales
Available
3 BHK
4 left · 1,196–1,197 sq ft
Possession
Dec 2026
as filed with MahaRERA
A stock photograph, not Ankur. We have no picture of this site yet.

Where this is

Deccan Gymkhana, Pune, 411004

Street map of Deccan Gymkhana centred on the coordinate filed for Ankur, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Pune (M Corp.)
Taluka
Pune City
Pincode
411004
Coordinates
18.508643, 73.831409

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 24 flats are filed unit by unit with the authority, the highest on floor 12. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

3 BHK 24 units · 4 available

11 units 1196 sq ft 111.11 sq m as filed
13 units 1197 sq ft 111.21 sq m as filed
Units sold

20 / 24

Nearly sold out

83% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

3 BHK 24 flats · 4 available

1,197 sq ft carpet as drawn, from 1,196–1,197 sq ft filed in this configuration

Carpet, filed
1,197 sq ft
Built-up
about 1,436 sq ft
Super built-up
about 1,676 sq ft
Every room in this flat

Living and dining about 294 sq ft, Master bedroom about 196 sq ft, Second bedroom about 157 sq ft, Third bedroom about 128 sq ft, Kitchen about 118 sq ft, Bath about 69 sq ft, Balcony about 69 sq ft, Second bath about 59 sq ft, Passage about 59 sq ft, Third bath about 49 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹20,731 per sq ft of carpet, median of 20 registered sales
Range across those sales ₹18,337 to ₹21,980 per sq ft
Sold and booked 20 sold, 0 booked
Still available 4 flats, 1196–1197 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2026
Current status Due Dec 2026

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

FINAL PLOT NO-70/13, CTS NO-47/13A,ERANDWANE, TAL-HAVELI, PUNE-411004 is the plot this project is built on, as filed
Revenue village Pune (M Corp.) · shown on this site as Deccan Gymkhana
TalukaPune City
Street, as filed FINAL PLOT NO 70/13, CTS NO-47/13A, ERANDWANE TAL-HAVELI
Bounded north by CANAL ROAD
Bounded east by 20 FEET WIDE ROAD
Bounded south by PLOT NO 47 13B
Bounded west by CANAL ROAD

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerS K Fortune Developers
Registered officeCts No 1233/B, 47, Shiv Sai Palace, Apte Road, Shivajinagar, Pune 411005

Professionals named on the filing

Architect Manoj Tatooskar CA/91/13744
Engineer Rathis Group LE/0052/2023
Chartered Accountant CA Siddhant Bora 614922
Chartered Accountant Spcm And Associates 173544

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

5 March 2024 is when an advocate last certified the title to this land
Title report Ankur_Search_Title_Report_16-02-2024_0001[1].pdf 5 March 2024 1 older version on file
Promoter's declaration, Form B Ankur_Form_B.pdf 10 February 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100049906
Promoter S K Fortune Developers
Project typeResidential / Group Housing · Building development
LocalityDeccan Gymkhana — Pune City taluka, pincode 411004
Applied on10 February 2023
Registered on06 March 2023
Completion, as first filed31 December 2026
Due31 December 2026
Units declared24
Units sold 20 of 24 sold (83%), 4 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 06 March 2023
Application referenceREA52100130823
Current statusActive
Record last changed 06 March 2023 · over 3 years ago 3 years untouched

Where the sold count comes from, and whether it holds up. 20 of 24 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 24 flats and reaches the same answer — 20 sold, every one with money recorded as received against a named flat, and 4 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 06 March 2023.

MahaRERA has not recorded a change to this project's record in 3 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Ankur registered with MahaRERA?
Yes. It is registered as P52100049906, filed on 06 March 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Ankur due to be handed over?
The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Ankur been delayed?
No. December 2026 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Ankur?
A median of ₹20,731 per square foot of carpet, across 20 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Ankur?
4 of 24 were still unsold at the promoter's last filing, in 3 BHK, from 1,196–1,197 sq ft of carpet.
Are there complaints against Ankur?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Ankur?
S K Fortune Developers, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 12 September 2026. The authority's own page for P52100049906 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Deccan Gymkhana