Z Zomefy

RERA registered P52100020228 Active

Silver Touch

Chikhali, Pune · Residential / Group Housing by Silver Touch Developers

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Silver Touch in Chikhali is MahaRERA-registered (P52100020228) and still under construction, with possession filed for December 2026. Buyers have already registered 80 sales here at a median ₹5,909 per sq ft of carpet — not an asking price. About 73% of the 110 units are sold. Silver Touch Developers is the promoter.

Stock image, not a photograph of Silver Touch Stock image
Where
Chikhali
pincode 411062
Sold here at
₹5,909
per sq ft, 80 registered sales
Available
1 BHK
9 left · 330–381 sq ft
Now due
Dec 2026
5.3 years later than first promised
A stock photograph, not Silver Touch. We have no picture of this site yet.

Where this is

Chikhali, PCMC, Pune, 411062

Street map of Chikhali centred on the coordinate filed for Silver Touch, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Pimpri Chinchawad (M Corp.)
Taluka
Haveli
Pincode
411062
Coordinates
18.597494, 73.774095

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 110 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 110 units · 9 available

1 unit 314 sq ft 29.15 sq m as filed
1 unit 326 sq ft 30.33 sq m as filed
90 units 330 sq ft 30.66 sq m as filed
10 units 381 sq ft 35.4 sq m as filed
8 units 430 sq ft 39.95 sq m as filed
Units sold

80 / 110

Selling steadily

73% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 110 flats · 9 available

330 sq ft carpet as drawn, from 314–430 sq ft filed in this configuration

Carpet, filed
330 sq ft
Built-up
about 396 sq ft
Super built-up
about 462 sq ft
Every room in this flat

Living and dining about 124 sq ft, Master bedroom about 82 sq ft, Kitchen about 50 sq ft, Bath about 29 sq ft, Balcony about 29 sq ft, Passage about 16 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹5,909 per sq ft of carpet, median of 80 registered sales
Range across those sales ₹4,848 to ₹8,089 per sq ft
Sold and booked 80 sold, 0 booked
Still available 9 flats, 314–430 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Sep 2021
Current status Due Dec 2026

Revised projection

The completion date has moved from September 2021 to December 2026, 5.3 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

GAT No. 723, 730 is the plot this project is built on, as filed
Revenue village Pimpri Chinchawad (M Corp.) · shown on this site as Chikhali
TalukaHaveli
Street, as filed Chikhali kudalwadi
Bounded north by GAT No 723P
Bounded east by GAT No 752P
Bounded south by GAT No 731P
Bounded west by 9M Road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerSilver Touch Developers
Registered office1358, Jare Traders, Sane Chowk, Near Sai Mandir, Morewasti Chikhali, Pune 411044

Professionals named on the filing

Architect Amol Khandagale 503/19
Engineer Jay Ganesh Associates NA
Chartered Accountant Kaustubh P Gore 178567
Chartered Accountant NPSR & Associates - CA. Vivek Lahoti
Chartered Accountant Prashantsing Mohansing Pardeshi 176541

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

21 February 2019 is when an advocate last certified the title to this land
Title report Search Title Report-compressed.pdf 21 February 2019
Promoter's declaration, Form B Form B - Silver Touch Developers_compressed.pdf 22 March 2019

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100020228
Promoter Silver Touch Developers
Project typeResidential / Group Housing · Building development
LocalityChikhali — Haveli taluka, pincode 411062
Applied on29 March 2019
Registered on29 March 2019
Completion, as first filed01 September 2021
Due31 December 2026 5.3 years later
Units declared110
Units sold 80 of 110 sold (73%), 30 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 25 June 2020
Application referenceREA52100054663
Current statusActive
Record last changed 27 March 2023 · over 3 years ago 3 years untouched

Where the sold count comes from, and whether it holds up. 80 of 110 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 110 flats and reaches the same answer — 80 sold, every one with money recorded as received against a named flat, and 9 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 27 March 2023.

MahaRERA has not recorded a change to this project's record in 3 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Silver Touch registered with MahaRERA?
Yes. It is registered as P52100020228, filed on 29 March 2019, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Silver Touch due to be handed over?
The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Silver Touch been delayed?
Yes. The first date filed was September 2021. It now stands at December 2026, 5.3 years later.
What did buyers actually pay in Silver Touch?
A median of ₹5,909 per square foot of carpet, across 80 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Silver Touch?
9 of 110 were still unsold at the promoter's last filing, in 1 BHK, from 330–381 sq ft of carpet.
Are there complaints against Silver Touch?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Silver Touch?
Silver Touch Developers, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100020228 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Chikhali

Stock image, not a photograph of Indiana Phase 1 Stock image
Registered here
₹6,944
On offer
1, 2, 3 BHK
Under construction

Indiana Phase 1

Five Element Constructions LLP · Chikhali

12 sold
Slipped 4 months
Due
Apr 2028
Units
129
Carpet
436–767
Sold at
₹44.3 lakh
P52100078330