Z Zomefy

RERA registered P52100053001 Active

Lini Homes

Chikhali, Pune · Residential / Group Housing by Vijay Construction Next

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Lini Homes in Chikhali is MahaRERA-registered (P52100053001) and still under construction, with possession filed for April 2030. Buyers have already registered 42 sales here at a median ₹6,225 per sq ft of carpet — not an asking price. About 29% of the 143 units are sold. Vijay Construction Next is the promoter.

Stock image, not a photograph of Lini Homes Stock image
Where
Chikhali
pincode 411062
Sold here at
₹6,225
per sq ft, 42 registered sales
Available
1 BHK, 2 BHK, Office Space, Shops
76 left · 477–1,881 sq ft
Now due
Apr 2030
4 months later than first promised
A stock photograph, not Lini Homes. We have no picture of this site yet.

Where this is

Chikhali, PCMC, Pune, 411062

Village
Chikhali
Taluka
Haveli
Pincode
411062
Coordinates
18.520430, 73.856744

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 143 units are filed unit by unit with the authority, the highest on floor 22. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 4 units · all available

4 units 477 sq ft 44.33 sq m as filed

2 BHK 129 units · 68 available

45 units 639 sq ft 59.4 sq m as filed
83 units 644 sq ft 59.85–59.87 sq m as filed
1 unit 2145 sq ft 199.24 sq m as filed

Office Space 6 units · 2 available

2 units 1215 sq ft 112.84 sq m as filed
2 units 1355 sq ft 125.92 sq m as filed
1 unit 1880 sq ft 174.67 sq m as filed
1 unit 1881 sq ft 174.77 sq m as filed

Shops 4 units · 2 available

1 unit 678 sq ft 62.97 sq m as filed
1 unit 771 sq ft 71.62 sq m as filed
1 unit 1075 sq ft 99.85 sq m as filed
1 unit 1189 sq ft 110.46 sq m as filed
Units sold

42 / 143

Early sales

29% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

1 BHK 4 units · 4 available

477 sq ft carpet as drawn

Carpet, filed
477 sq ft
Built-up
about 572 sq ft
Super built-up
about 668 sq ft
Every room in this unit

Living and dining about 179 sq ft, Master bedroom about 119 sq ft, Kitchen about 72 sq ft, Bath about 42 sq ft, Balcony about 42 sq ft, Passage about 24 sq ft.

2 BHK 129 units · 68 available

644 sq ft carpet as drawn, from 639–2,145 sq ft filed in this configuration

Carpet, filed
644 sq ft
Built-up
about 773 sq ft
Super built-up
about 902 sq ft
Every room in this unit

Living and dining about 188 sq ft, Master bedroom about 125 sq ft, Second bedroom about 100 sq ft, Kitchen about 75 sq ft, Bath about 44 sq ft, Balcony about 44 sq ft, Second bath about 38 sq ft, Passage about 31 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹6,225 per sq ft of carpet, median of 42 registered sales
Range across those sales ₹5,627 to ₹7,022 per sq ft
Sold and booked 36 sold, 6 booked
Still available 76 units, 477–2145 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2029
Current status Due Apr 2030

Revised projection

The completion date has moved from December 2029 to April 2030, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

1193/3 (P) is the plot this project is built on, as filed
Revenue village Chikhali
TalukaHaveli
Street, as filed PINGALE ROAD
Bounded north by LAND OWNED BY AKASH PATIL
Bounded east by GAT NO 1193 OWNED BY PINGALE
Bounded south by 18M WIDE DP ROAD
Bounded west by GAT NO 1193 OWNED BY PINGALE

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerVijay Construction Next
Registered officeGat No 1193, 03, P Square Phase 2, Radha Swami Satsang Road, Near Maruti Temple, Sonawane Wasti, Pune 412114

Professionals named on the filing

Architect Mr Dhiraj Takkekar CA/2010/49896
Engineer Varsha Patil
Chartered Accountant Mr Swapnil J Kothadia And Co 114124

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

16 August 2023 is when an advocate last certified the title to this land
Title report LEGAL TITLE REPORT.pdf 16 August 2023
Promoter's declaration, Form B FORM B VIJAY CONSTRUTION.pdf 19 May 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100053001
Promoter Vijay Construction Next
Project typeResidential / Group Housing · Building development
LocalityChikhali — Haveli taluka, pincode 411062
Applied on31 July 2023
Registered on10 October 2023
Completion, as first filed31 December 2029
Due30 April 2030 4 months later
Units declared143
Units sold 42 of 143 sold (29%), 101 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 10 October 2023
Application referenceREA52100143036
Current statusActive
Record last changed 10 October 2023 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 42 of 143 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 143 units and reaches the same answer — 36 sold, every one with money recorded as received against a named unit, 6 booked with a price agreed but nothing received yet, and 76 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 10 October 2023.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Lini Homes registered with MahaRERA?
Yes. It is registered as P52100053001, filed on 10 October 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Lini Homes due to be handed over?
The promoter has told MahaRERA April 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Lini Homes been delayed?
Yes. The first date filed was December 2029. It now stands at April 2030, 4 months later.
What did buyers actually pay in Lini Homes?
A median of ₹6,225 per square foot of carpet, across 42 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Lini Homes?
76 of 143 were still unsold at the promoter's last filing, in 1, 2 BHK +2 more, from 477–1,881 sq ft of carpet.
Are there complaints against Lini Homes?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Lini Homes?
Vijay Construction Next, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100053001 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Chikhali

Stock image, not a photograph of Ganesh Siddhi Phase 3 Stock image
Nearby
₹6,932–7,948
On offer
1, 2 BHK + shops
Under construction

Ganesh Siddhi Phase 3

S B Patil Spaces And Infra Pvt Ltd · Chikhali

0 sold
Due
Jun 2027
Units
235
Carpet
258–567
Typical unit
~₹40.6 lakh
P52100045411