Z Zomefy

RERA registered P52100080267 Active

Skyi Park Phase II

Bhukum, Pune · Residential / Group Housing by Enerrgia Skyi Ventures

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Skyi Park Phase II in Bhukum is MahaRERA-registered (P52100080267) and still under construction, with possession filed for November 2030. Buyers have already registered 9 sales here at a median ₹8,210 per sq ft of carpet — not an asking price. About 11% of the 82 units are sold. 1 complaint sits on the filing. Enerrgia Skyi Ventures is the promoter.

Stock image, not a photograph of Skyi Park Phase II Stock image
Where
Bhukum
pincode 412115
Sold here at
₹8,210
per sq ft, 9 registered sales
Available
2, 3 BHK
68 left · 665–820 sq ft
Now due
Nov 2030
4 months later than first promised
A stock photograph, not Skyi Park Phase II. We have no picture of this site yet.

Where this is

Bhukum, PMRDA, Pune, 412115

Street map of Bhukum centred on the coordinate filed for Skyi Park Phase II, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Bhukum
Taluka
Mulshi
Pincode
412115
Coordinates
18.494589, 73.726863

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 82 flats are filed unit by unit with the authority, the highest on floor 14. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 62 units · 48 available

56 units 665 sq ft 61.75 sq m as filed
6 units 820 sq ft 76.18 sq m as filed

3 BHK 20 units · all available

20 units 820 sq ft 76.18 sq m as filed
Units sold

9 / 82

Early sales

11% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 62 flats · 48 available

665 sq ft carpet as drawn, from 665–820 sq ft filed in this configuration

Carpet, filed
665 sq ft
Built-up
about 798 sq ft
Super built-up
about 931 sq ft
Every room in this flat

Living and dining about 194 sq ft, Master bedroom about 129 sq ft, Second bedroom about 103 sq ft, Kitchen about 77 sq ft, Bath about 45 sq ft, Balcony about 45 sq ft, Second bath about 39 sq ft, Passage about 32 sq ft.

3 BHK 20 flats · 20 available

820 sq ft carpet as drawn

Carpet, filed
820 sq ft
Built-up
about 984 sq ft
Super built-up
about 1,148 sq ft
Every room in this flat

Living and dining about 202 sq ft, Master bedroom about 134 sq ft, Second bedroom about 108 sq ft, Third bedroom about 87 sq ft, Kitchen about 81 sq ft, Bath about 47 sq ft, Balcony about 47 sq ft, Second bath about 40 sq ft, Passage about 40 sq ft, Third bath about 34 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹8,210 per sq ft of carpet, median of 9 registered sales
Range across those sales ₹8,124 to ₹9,053 per sq ft
Sold and booked 9 sold, 0 booked
Still available 68 flats, 665–820 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jul 2030
Current status Due Nov 2030

Revised projection

The completion date has moved from July 2030 to November 2030, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Gat No 294 (P) is the plot this project is built on, as filed
Revenue village Bhukum
TalukaMulshi
Street, as filed Gat No 294 (P), at Bhukum
Bounded north by 15 M Wide Road
Bounded east by Open Plot
Bounded south by Gat No 293
Bounded west by Open Plot

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerEnerrgia Skyi Ventures
Registered office274/1, 1, Skyi Songbirds, Four Season Road, Pwc Club, Behind Daulat Lawns, Pune 412115

Professionals named on the filing

Architect Dhananjay S. Deshmukh CA/2013/58471
Architect PGS and Associates -
Engineer Nitin Ghadge
Engineer Sandip Rangdal & Asso Structural Consultant PMC-457A
Chartered Accountant A S Jinturkar & Co 163038

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
SM12500252 Dec 2025 Order passed Dec 2025

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

3 May 2025 is when an advocate last certified the title to this land
Title report 1 Copy of the legal title report (67).pdf 3 May 2025
Promoter's declaration, Form B 1 Declaration in FORM B (2).pdf 3 May 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100080267
Promoter Enerrgia Skyi Ventures
Project typeResidential / Group Housing · Building development
LocalityBhukum — Mulshi taluka, pincode 412115
Applied on03 May 2025
Registered on15 May 2025
Completion, as first filed31 July 2030
Due30 November 2030 4 months later
Units declared82
Units sold 9 of 82 sold (11%), 73 still unsold
Complaints1 on record with MahaRERA
Certificate on file Corrected certificate, issued 07 September 2026
Application referenceREA52100168965
Current statusActive
Record last changed 22 July 2026 · 2 months ago

Where the sold count comes from, and whether it holds up. 9 of 82 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 82 flats and reaches the same answer — 9 sold, every one with money recorded as received against a named flat, and 68 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 22 July 2026.

Common questions

Is Skyi Park Phase II registered with MahaRERA?
Yes. It is registered as P52100080267, filed on 15 May 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Skyi Park Phase II due to be handed over?
The promoter has told MahaRERA November 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Skyi Park Phase II been delayed?
Yes. The first date filed was July 2030. It now stands at November 2030, 4 months later.
What did buyers actually pay in Skyi Park Phase II?
A median of ₹8,210 per square foot of carpet, across 9 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Skyi Park Phase II?
68 of 82 were still unsold at the promoter's last filing, in 2, 3 BHK, from 665–820 sq ft of carpet.
Are there complaints against Skyi Park Phase II?
1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Skyi Park Phase II?
Enerrgia Skyi Ventures, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100080267 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Bhukum

Stock image, not a photograph of Asmi Pride Stock image
Registered here
₹4,991
On offer
1, 2 BHK
Under construction

Asmi Pride

M/S Icon Developers · Bhukum

68 sold
Slipped 1.5 years
Due
Dec 2026
Units
168
Carpet
433–698
Sold at
₹22.1 lakh
P52100028299