In short

Fusion Towers Phase IV in Bhoirwadi is MahaRERA-registered (P52100049419) and still under construction, with possession filed for December 2026. Buyers have already registered 148 sales here at a median ₹9,781 per sq ft of carpet — not an asking price. About 85% of the 175 units are sold. Rama Synergy Spaces is the promoter.

Stock image, not a photograph of Fusion Towers Phase IV Stock image
Where
Bhoirwadi
pincode 411057
Sold here at
₹9,781
per sq ft, 148 registered sales
Available
2 BHK
27 left · 494–633 sq ft
Now due
Dec 2026
a year later than first promised
A stock photograph, not Fusion Towers Phase IV. We have no picture of this site yet.

Where this is

Bhoirwadi, PMRDA, Pune, 411057

Street map of Bhoirwadi centred on the coordinate filed for Fusion Towers Phase IV, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Bhoirwadi
Taluka
Mulshi
Pincode
411057
Coordinates
18.587581, 73.682939

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 175 flats are filed unit by unit with the authority, the highest on floor 14. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 175 units · 27 available

26 units 494 sq ft 45.85 sq m as filed
28 units 495 sq ft 45.95 sq m as filed
16 units 560 sq ft 51.99 sq m as filed
28 units 580 sq ft 53.85 sq m as filed
12 units 583 sq ft 54.12 sq m as filed
19 units 625 sq ft 58.1 sq m as filed
24 units 628 sq ft 58.38 sq m as filed
10 units 632 sq ft 58.72 sq m as filed
12 units 633 sq ft 58.84 sq m as filed
Units sold

148 / 175

Nearly sold out

85% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 175 flats · 27 available

495 sq ft carpet as drawn, from 494–633 sq ft filed in this configuration

Carpet, filed
495 sq ft
Built-up
about 594 sq ft
Super built-up
about 693 sq ft
Every room in this flat

Living and dining about 144 sq ft, Master bedroom about 96 sq ft, Second bedroom about 77 sq ft, Kitchen about 58 sq ft, Bath about 34 sq ft, Balcony about 34 sq ft, Second bath about 29 sq ft, Passage about 24 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹9,781 per sq ft of carpet, median of 148 registered sales
Range across those sales ₹6,975 to ₹13,064 per sq ft
Sold and booked 139 sold, 9 booked
Still available 27 flats, 494–633 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2025
Current status Due Dec 2026

Revised projection

The completion date has moved from December 2025 to December 2026, a year later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S. No. 41/A/5, 41/A/14, 41/A/15, 41/A/16 is the plot this project is built on, as filed
Revenue village Bhoirwadi
TalukaMulshi
Street, as filed MIDC Main Road
Bounded north by Phase II
Bounded east by Adj S No 21
Bounded south by 15 M wide internal Road
Bounded west by F building and open space

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerRama Synergy Spaces
Registered office10th Floor, Rama Equator, Morwadi, Near Pcmc, Pimpri, Pune 411018
Registered agents 210 licensed agents may sell this project

Professionals named on the filing

Architect ABA - Amit Bhatt Architects
Architect ABA - Amit Bhatt Architects
Architect Vka
Architect Vka Architecture CA/84/8465
Engineer Akshay Nigade EN16-32269
Engineer Deepali Vilas Phulpagar
Engineer J.W. Consultants LLP
Engineer J.W. Consultants LLP
Engineer Nawed Anjum Narool Huda
Chartered Accountant CA Madhusudan Jhanwar
Chartered Accountant CA Madhusudan Jhanwar
Chartered Accountant L. B. Laddha & Co
Chartered Accountant L. B. Laddha & Co
Chartered Accountant L. B. Laddha & Co 010550
Chartered Accountant Madhusudan Jhanwar 121450

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

25 January 2023 is when an advocate last certified the title to this land
Title report Letter regarding updated Survey Number FT_compressed.pdf 25 January 2023 3 older versions on file
Promoter's declaration, Form B Declaration Form B_FT PH IV.pdf 18 January 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100049419
Promoter Rama Synergy Spaces
Project typeResidential / Group Housing · Building development
LocalityBhoirwadi — Mulshi taluka, pincode 411057
Applied on21 January 2023
Registered on08 February 2023
Completion, as first filed31 December 2025
Due31 December 2026 a year later
Units declared175
Units sold 148 of 175 sold (85%), 27 still unsold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 18 August 2026
Application referenceREA52100129442
Current statusActive
Record last changed 26 May 2026 · 4 months ago

Where the sold count comes from, and whether it holds up. 148 of 175 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 175 flats and reaches the same answer — 139 sold, every one with money recorded as received against a named flat, 9 booked with a price agreed but nothing received yet, and 27 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 26 May 2026.

Common questions

Is Fusion Towers Phase IV registered with MahaRERA?
Yes. It is registered as P52100049419, filed on 08 February 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Fusion Towers Phase IV due to be handed over?
The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Fusion Towers Phase IV been delayed?
Yes. The first date filed was December 2025. It now stands at December 2026, a year later.
What did buyers actually pay in Fusion Towers Phase IV?
A median of ₹9,781 per square foot of carpet, across 148 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Fusion Towers Phase IV?
27 of 175 were still unsold at the promoter's last filing, in 2 BHK, from 494–633 sq ft of carpet.
Are there complaints against Fusion Towers Phase IV?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Fusion Towers Phase IV?
Rama Synergy Spaces, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100049419 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects near Bhoirwadi