RERA registered P52100019797 Completed

Fusion Towers Phase Ii

Bhoirwadi, Pune · Residential / Group Housing by Rama Synergy Spaces

Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.

In short

Fusion Towers Phase Ii in Bhoirwadi is MahaRERA-registered (P52100019797) and was handed over in December 2022. Buyers have already registered 107 sales here at a median ₹8,675 per sq ft of carpet — not an asking price. About 97% of the 110 units are sold. 2 complaints sit on the filing. Rama Synergy Spaces is the promoter.

Stock image, not a photograph of Fusion Towers Phase Ii Stock image
Where
Bhoirwadi
pincode 411057
Sold here at
₹8,675
per sq ft, 107 registered sales
Available
2 BHK
3 left · 509–515 sq ft
Possession
Dec 2022
as filed with MahaRERA
A stock photograph, not Fusion Towers Phase Ii. We have no picture of this site yet.

Where this is

Bhoirwadi, PMRDA, Pune, 411057

Village
Bhoirwadi
Taluka
Mulshi
Pincode
411057
Coordinates
18.587658, 73.683657

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 110 flats are filed unit by unit with the authority, the highest on floor 14. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 110 units · 3 available

6 units 506 sq ft 47.0 sq m as filed
20 units 509 sq ft 47.25 sq m as filed
28 units 513 sq ft 47.65 sq m as filed
28 units 515 sq ft 47.81 sq m as filed
28 units 518 sq ft 48.12 sq m as filed
Units sold

107 / 110

Nearly sold out

97% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 110 flats · 3 available

513 sq ft carpet as drawn, from 506–518 sq ft filed in this configuration

Carpet, filed
513 sq ft
Built-up
about 616 sq ft
Super built-up
about 718 sq ft
Every room in this flat

Living and dining about 149 sq ft, Master bedroom about 100 sq ft, Second bedroom about 80 sq ft, Kitchen about 60 sq ft, Bath about 35 sq ft, Balcony about 35 sq ft, Second bath about 30 sq ft, Passage about 25 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹8,675 per sq ft of carpet, median of 107 registered sales
Range across those sales ₹7,393 to ₹10,455 per sq ft
Sold and booked 107 sold, 0 booked
Still available 3 flats, 506–518 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2022
Current status Handed over Dec 2022

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Survey No. 41/A/14, 41/A/15, 41/A/16 and 41/A/5, Plot A1 is the plot this project is built on, as filed
Revenue village Bhoirwadi
TalukaMulshi
Street, as filed MIDC Main Road
Bounded north by By S No 41-5 Plot no B1
Bounded east by By S No 21 and Balance phase of Fusion Towers
Bounded south by Balance phase of Fusion Towers
Bounded west by Part of Fusion Towers Phase 1

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerRama Synergy Spaces
Registered office10th Floor, Rama Equator, Morwadi, Near Pcmc, Pimpri, Pune 411018

Professionals named on the filing

Architect Amit Bhat Architects
Architect VKa architecture 2002/29235
Engineer Akshay Nigade EN16-32269
Engineer J.W. Consultants LLP 20
Chartered Accountant L. B. Laddha & Co 010550
Chartered Accountant L. B. Laddha & Co 030324
Chartered Accountant Madhusudan Jhanwar 121450

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

2 cases against this project, 2 with an order on record, filed between Mar 2024 and Aug 2025. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12502941 Aug 2025 Order passed Aug 2025
CC005000000310541 Mar 2024 Order passed Mar 2024

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

20 February 2019 is when an advocate last certified the title to this land
Title report Title Report dt 15 09 18.pdf 20 February 2019
Promoter's declaration, Form B Form B.pdf 26 July 2024 1 older version on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100019797
Promoter Rama Synergy Spaces
Project typeResidential / Group Housing · Building development
LocalityBhoirwadi — Mulshi taluka, pincode 411057
Applied on25 February 2019
Registered on05 March 2019
Completion, as first filed30 December 2022
Handed over30 December 2022
Units declared110
Units sold 107 of 110 sold (97%), 3 still unsold
Complaints2 on record with MahaRERA
Certificate on file Original registration certificate, issued 20 January 2023
Application referenceREA52100053304
Current statusCompleted
Record last changed 13 August 2024 · over 2 years ago

Where the sold count comes from, and whether it holds up. 107 of 110 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 110 flats and reaches the same answer — 107 sold, every one with money recorded as received against a named flat, and 3 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 13 August 2024.

Common questions

Is Fusion Towers Phase Ii registered with MahaRERA?
Yes. It is registered as P52100019797, filed on 05 March 2019, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
Has Fusion Towers Phase Ii been handed over?
Yes. The completion date on the register is December 2022.
Has Fusion Towers Phase Ii been delayed?
No. December 2022 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Fusion Towers Phase Ii?
A median of ₹8,675 per square foot of carpet, across 107 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Fusion Towers Phase Ii?
3 of 110 were still unsold at the promoter's last filing, in 2 BHK, from 509–515 sq ft of carpet.
Are there complaints against Fusion Towers Phase Ii?
2 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Fusion Towers Phase Ii?
Rama Synergy Spaces, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100019797 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.