Anand Vihar- B

Baramati, Pune · Mixed by Bhagawati Infrastructure

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Anand Vihar- B in Baramati is MahaRERA-registered (PM1260002500178) and still under construction, with possession filed for October 2028. No sales are registered in this project yet. Units the same size elsewhere in Baramati have registered at ₹3,501–4,667 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. Bhagawati Infrastructure is the promoter.

Stock image, not a photograph of Anand Vihar- B Stock image
Where
Baramati
pincode 413102
Nearby at
₹3,501–4,667
per sq ft, same sizes in Baramati
Available
2 BHK, 3 BHK, Office Space, Shops
19 left · 145–1,780 sq ft
Now due
Oct 2028
4 months later than first promised
A stock photograph, not Anand Vihar- B. We have no picture of this site yet.

Where this is

Baramati, Pune, 413102

Street map of Baramati centred on the coordinate filed for Anand Vihar- B, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Baramati (M Cl)
Taluka
Baramati
Pincode
413102
Coordinates
18.162682, 74.579307

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 40 units are filed unit by unit with the authority, the highest on floor 5. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 8 units · 4 available

4 units 881 sq ft 81.87 sq m as filed
4 units 951 sq ft 88.34 sq m as filed

3 BHK 8 units · 4 available

4 units 1159 sq ft 107.67 sq m as filed
4 units 1174 sq ft 109.04 sq m as filed

Office Space 11 units · 5 available

1 unit 221 sq ft 20.54 sq m as filed
1 unit 231 sq ft 21.44 sq m as filed
2 units 271 sq ft 25.19 sq m as filed
1 unit 279 sq ft 25.89 sq m as filed
2 units 292 sq ft 27.1 sq m as filed
1 unit 335 sq ft 31.08 sq m as filed
1 unit 361 sq ft 33.57 sq m as filed
2 units 447 sq ft 41.55–41.56 sq m as filed

Shops 13 units · 6 available

2 units 145 sq ft 13.5 sq m as filed
1 unit 207 sq ft 19.2 sq m as filed
6 units 216 sq ft 20.1 sq m as filed
1 unit 352 sq ft 32.7 sq m as filed
1 unit 1094 sq ft 101.61 sq m as filed
1 unit 1130 sq ft 104.95 sq m as filed
1 unit 1780 sq ft 165.37 sq m as filed
Units sold

0 / 40

Pre-launch / early phase

0% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

2 BHK 8 units · 4 available

881 sq ft carpet as drawn, from 881–951 sq ft filed in this configuration

Carpet, filed
881 sq ft
Built-up
about 1,057 sq ft
Super built-up
about 1,233 sq ft
Every room in this unit

Living and dining about 257 sq ft, Master bedroom about 171 sq ft, Second bedroom about 137 sq ft, Kitchen about 103 sq ft, Bath about 60 sq ft, Balcony about 60 sq ft, Second bath about 51 sq ft, Passage about 43 sq ft.

3 BHK 8 units · 4 available

1,159 sq ft carpet as drawn, from 1,159–1,174 sq ft filed in this configuration

Carpet, filed
1,159 sq ft
Built-up
about 1,391 sq ft
Super built-up
about 1,623 sq ft
Every room in this unit

Living and dining about 285 sq ft, Master bedroom about 190 sq ft, Second bedroom about 152 sq ft, Third bedroom about 124 sq ft, Kitchen about 114 sq ft, Bath about 66 sq ft, Balcony about 66 sq ft, Second bath about 57 sq ft, Passage about 57 sq ft, Third bath about 48 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What units like these cost nearby

No sale has been registered at Anand Vihar- B yet. The promoter has filed no agreement values, so nothing below is this project's own price.

₹3,501–4,667 per sq ft of carpet, median of 476 registered sales of the same configurations in Baramati
On sale here Registered in Baramati Which for this size is
2 BHK 881–951 sq ft ₹3,501/sq ft 410 sales, 38 projects ₹30.8 lakh–₹33.3 lakh middle half ₹3,098–4,160/sq ft
3 BHK 1,159–1,174 sq ft ₹4,667/sq ft 66 sales, 12 projects ₹54.1 lakh–₹54.8 lakh middle half ₹3,499–5,037/sq ft

Office Space, Shops are also on sale here, and Baramati has not registered enough sales of those to quote a rate for them.

Each rate is what buyers contracted to pay for the same configuration in Baramati, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Baramati.

The government's valuation of the unsold units

On sale here Carpet Valued at no less than
2 BHK 4 unsold 881 sq ft ₹21.1 lakh ₹2,389/sq ft
3 BHK 4 unsold 1,174 sq ft ₹28 lakh ₹2,389/sq ft
Office Space 5 unsold 271–447 sq ft ₹6.6 lakh–₹11 lakh ₹2,449/sq ft
Shops 6 unsold 145–1,780 sq ft ₹4.2 lakh–₹50.9 lakh ₹2,860/sq ft

This is the Annual Statement of Rates value the promoter filed against each unsold unit — the state's valuation, not an asking price and not a discount. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Timeline audit

Original proposed Jun 2028
Current status Due Oct 2028

Revised projection

The completion date has moved from June 2028 to October 2028, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

SURVEY NO - 272, PLOT NO - 3,4, AT - BARAMATI, TAL - BARAMATI, DIST- PUNE is the plot this project is built on, as filed
Revenue village Baramati (M Cl) · shown on this site as Baramati
TalukaBaramati
Street, as filed Gat No 272 Plot No 3 and 4
Bounded north by Plot No 2
Bounded east by Plot No 15 16 17 18
Bounded south by Plot No 5
Bounded west by Baramati Tandulwadi Road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerBhagawati Infrastructure
Registered officeS R No 275/2/A/1, Plot No 5 And 6, Anandtirth Bunglow, Pragatinagar, Pune 413102

Professionals named on the filing

Architect Prasad Laxman Gaikwad STATE/R/2026/APL/24351
Engineer Prasad Laxman Gaikwad STATE/R/2023/APL/07234
Chartered Accountant D A Taware and Associates 139736
Chartered Accountant Hitesh Rajendra Chhajed 132959
Advocate Vijay Gopalrao Taware

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

19 May 2025 is when an advocate last certified the title to this land
Title report Format_A_-_Search Report.pdf 19 May 2025
Conveyance deed Purchase Deed Uplaod.pdf 11 June 2025
Promoter's declaration, Form B Form B New.pdf 12 June 2025 1 older version on file
Annexure A declaration Annex A - Decl cum undertaking.pdf 19 May 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPM1260002500178
Promoter Bhagawati Infrastructure
Project typeMixed · Building development
LocalityBaramati — Baramati taluka, pincode 413102
Applied on23 May 2025
Registered on01 July 2025
Completion, as first filed30 June 2028
Due30 October 2028 4 months later
Units declared40
Units sold None sold yet, all 40 on the market
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 01 July 2025
Application referenceACK19052500516
Current statusActive
Record last changed 01 July 2025 · 15 months ago

Nothing has sold yet. The promoter's quarterly progress report says none of the 40 units are gone, and the unit-by-unit list they file separately says the same: all 40 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 01 July 2025.

Common questions

Is Anand Vihar- B registered with MahaRERA?
Yes. It is registered as PM1260002500178, filed on 01 July 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Anand Vihar- B due to be handed over?
The promoter has told MahaRERA October 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Anand Vihar- B been delayed?
Yes. The first date filed was June 2028. It now stands at October 2028, 4 months later.
What does a unit in Anand Vihar- B cost?
Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Baramati have registered at ₹3,501–4,667 per square foot of carpet — the neighbourhood, not this building.
How many units are left in Anand Vihar- B?
19 of 40 were still unsold at the promoter's last filing, in 2, 3 BHK +2 more, from 145–1,780 sq ft of carpet.
Are there complaints against Anand Vihar- B?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Anand Vihar- B?
Bhagawati Infrastructure, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for PM1260002500178 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Baramati

Stock image, not a photograph of Dyaneshwari Paradise Stock image
Registered here
₹3,529
On offer
1, 2 BHK + shops
Under construction

Dyaneshwari Paradise

Sandip Laxman Shende · Baramati

6 sold
Slipped 4 months
Due
Jun 2027
Units
80
Carpet
139–643
Sold at
₹22.5 lakh
P52100053938