RERA registered P52100078817 Active
Adarsh Residency
Baramati, Pune · Residential / Group Housing by Shivshree Developers
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Adarsh Residency in Baramati is MahaRERA-registered (P52100078817) and still under construction, with possession filed for February 2027. No sales are registered in this project yet. Units the same size elsewhere in Baramati have registered at ₹3,501–3,507 per sq ft of carpet — the neighbourhood, not this building. About 3% of the 31 units are sold. Shivshree Developers is the promoter.
- Nearby at
- ₹3,501–3,507
- per sq ft, same sizes in Baramati
- Available
- 2 BHK, Row Houses
- 18 left · 656–816 sq ft
- Now due
- Feb 2027
- 4 months later than first promised
Where this is
Baramati, Pune, 413102
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Flat sizes on file
All 31 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 28 units · 16 available
Row Houses 3 units · 2 available
1 / 31
3% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 28 flats · 16 available
656 sq ft carpet as drawn
- Carpet, filed
- 656 sq ft
- Built-up
- about 787 sq ft
- Super built-up
- about 918 sq ft
Every room in this flat
Living and dining about 191 sq ft, Master bedroom about 127 sq ft, Second bedroom about 102 sq ft, Kitchen about 76 sq ft, Bath about 45 sq ft, Balcony about 45 sq ft, Second bath about 38 sq ft, Passage about 32 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What flats like these cost nearby
No sale has been registered at Adarsh Residency yet. 1 agreement has been filed, which is too few to divide into a rate anyone should act on.
| On sale here | Registered in Baramati | Which for this size is |
|---|---|---|
| 2 BHK 656 sq ft | ₹3,501/sq ft 410 sales, 38 projects | ₹23 lakh middle half ₹3,098–4,160/sq ft |
| Row Houses 816–1,765 sq ft | ₹3,507/sq ft 20 sales, 5 projects | ₹28.6 lakh–₹61.9 lakh middle half ₹2,965–4,678/sq ft |
Each rate is what buyers contracted to pay for the same configuration in Baramati, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Baramati.
The state values these at ₹2,795 per sq ft of carpet — one rate across all 18 still available, which puts the smallest at ₹18.4 lakh and the largest at ₹22.8 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Revised projection
The completion date has moved from October 2026 to February 2027, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Baramati (M Cl) · shown on this site as Baramati |
|---|---|
| Taluka | Baramati |
| Street, as filed | Ring Road |
| Bounded north by | Remaining Land in Sr No 257 |
| Bounded east by | Remaining Land In Sr No 257 |
| Bounded south by | Plot No 2 |
| Bounded west by | Open Space and Road |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Shivshree Developers |
|---|---|
| Registered office | Room No 122, Gunawadi Road, Mahada Colony, Baramati, Pune 413102 |
Professionals named on the filing
| Architect | Avishkar Architects CAPBC/R/2018/APL/00087 |
|---|---|
| Engineer | Harishchandra Vilas Kokane CABPC/R/2023/APL/00890 |
| Chartered Accountant | Hitesh Chhajed And Associates 132959 |
| Chartered Accountant | S N P S & Co LLP 160043 |
| Advocate | Satish Dada Mahanvar |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Legal Title Report.pdf | 17 October 2024 |
|---|---|
| Promoter's declaration, Form B Form B Builder.pdf | 17 October 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100078817 |
| Promoter | Shivshree Developers |
| Project type | Residential / Group Housing · Building development |
| Locality | Baramati — Baramati taluka, pincode 413102 |
| Applied on | 17 October 2024 |
| Registered on | 13 January 2025 |
| Completion, as first filed | 30 October 2026 |
| Due | 28 February 2027 4 months later |
| Units declared | 31 |
| Units sold | 1 of 31 sold (3%), 30 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 14 January 2025 |
| Application reference | REA52100165192 |
| Current status | Active |
| Record last changed | 13 January 2025 · 20 months ago |
Where the sold count comes from, and whether it holds up. 1 of 31 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 31 flats and reaches the same answer — 1 sold, every one with money recorded as received against a named flat, and 18 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 13 January 2025.
Common questions
- Is Adarsh Residency registered with MahaRERA?
- Yes. It is registered as P52100078817, filed on 13 January 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Adarsh Residency due to be handed over?
- The promoter has told MahaRERA February 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Adarsh Residency been delayed?
- Yes. The first date filed was October 2026. It now stands at February 2027, 4 months later.
- What does a flat in Adarsh Residency cost?
- Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Baramati have registered at ₹3,501–3,507 per square foot of carpet — the neighbourhood, not this building.
- How many flats are left in Adarsh Residency?
- 18 of 31 were still unsold at the promoter's last filing, in 2 BHK + row houses, from 656–816 sq ft of carpet.
- Are there complaints against Adarsh Residency?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Adarsh Residency?
- Shivshree Developers, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100078817 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Baramati
Stock image
- Registered here
- ₹3,396
- On offer
- 2 BHK
- Due
- Mar 2028
- Units
- 80
- Carpet
- 433–574
- Sold at
- ₹15.1 lakh
Stock image
- Registered here
- ₹3,660
- On offer
- 2, 3, 4 BHK
- Due
- Sep 2029
- Units
- 45
- Carpet
- 1,093–1,827
- Sold at
- ₹49 lakh
Stock image
- Registered here
- ₹2,767
- On offer
- 2 BHK +2 more
- Due
- Dec 2028
- Units
- 43
- Carpet
- 147–871
- Sold at
- ₹18.6 lakh