Z Zomefy

RERA registered P52100050379 Active

Tejelevia Building C

Baner, Pune · Residential / Group Housing by Tejraj Realtors LLP

Official record Updated from the register 12 September 2026. Anything filed since then is not here yet.

In short

Tejelevia Building C in Baner is MahaRERA-registered (P52100050379) and still under construction, with possession filed for December 2028. Buyers have already registered 108 sales here at a median ₹11,344 per sq ft of carpet — not an asking price. About 93% of the 116 units are sold. Tejraj Realtors LLP is the promoter.

Stock image, not a photograph of Tejelevia Building C Stock image
Where
Baner
pincode 411045
Sold here at
₹11,344
per sq ft, 108 registered sales
Available
4 BHK
2 left · 1,439 sq ft
Possession
Dec 2028
as filed with MahaRERA
A stock photograph, not Tejelevia Building C. We have no picture of this site yet.

Where this is

Baner, PMC, Pune, 411045

Street map of Baner centred on the coordinate filed for Tejelevia Building C, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Pune (M Corp.)
Taluka
Pune City
Pincode
411045
Coordinates
18.560455, 73.783695

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 116 flats are filed unit by unit with the authority, the highest on floor 29. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 6 units · none available

6 units 288 sq ft 26.75 sq m as filed

2 BHK 52 units · none available

23 units 549 sq ft 51.01 sq m as filed
6 units 608 sq ft 56.47 sq m as filed
23 units 619 sq ft 57.48 sq m as filed

3 BHK 6 units · none available

6 units 1167 sq ft 108.42 sq m as filed

4 BHK 52 units · 2 available

52 units 1439 sq ft 133.69 sq m as filed
Units sold

108 / 116

Nearly sold out

93% absorption rate

Visual area guide See what the filed sizes feel like 4 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 6 flats · none available

288 sq ft carpet as drawn

Carpet, filed
288 sq ft
Built-up
about 346 sq ft
Super built-up
about 403 sq ft
Every room in this flat

Living and dining about 108 sq ft, Master bedroom about 72 sq ft, Kitchen about 43 sq ft, Bath about 25 sq ft, Balcony about 25 sq ft, Passage about 14 sq ft.

2 BHK 52 flats · none available

549 sq ft carpet as drawn, from 549–619 sq ft filed in this configuration

Carpet, filed
549 sq ft
Built-up
about 659 sq ft
Super built-up
about 769 sq ft
Every room in this flat

Living and dining about 160 sq ft, Master bedroom about 107 sq ft, Second bedroom about 85 sq ft, Kitchen about 64 sq ft, Bath about 37 sq ft, Balcony about 37 sq ft, Second bath about 32 sq ft, Passage about 27 sq ft.

3 BHK 6 flats · none available

1,167 sq ft carpet as drawn

Carpet, filed
1,167 sq ft
Built-up
about 1,400 sq ft
Super built-up
about 1,634 sq ft
Every room in this flat

Living and dining about 287 sq ft, Master bedroom about 191 sq ft, Second bedroom about 153 sq ft, Third bedroom about 124 sq ft, Kitchen about 115 sq ft, Bath about 67 sq ft, Balcony about 67 sq ft, Second bath about 57 sq ft, Passage about 57 sq ft, Third bath about 48 sq ft.

4 BHK 52 flats · 2 available

1,439 sq ft carpet as drawn

Carpet, filed
1,439 sq ft
Built-up
about 1,727 sq ft
Super built-up
about 2,015 sq ft
Every room in this flat

Living and dining about 320 sq ft, Master bedroom about 213 sq ft, Second bedroom about 171 sq ft, Third bedroom about 139 sq ft, Kitchen about 128 sq ft, Fourth bedroom about 128 sq ft, Bath about 75 sq ft, Balcony about 75 sq ft, Passage about 75 sq ft, Second bath about 64 sq ft, Third bath about 53 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹11,344 per sq ft of carpet, median of 108 registered sales
Range across those sales ₹5,109 to ₹21,079 per sq ft
Sold and booked 108 sold, 0 booked
Still available 2 flats, 288–1439 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2028
Current status Due Dec 2028

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

72 4 73 74 75 2 1 Plot No 31 32 is the plot this project is built on, as filed
Revenue village Pune (M Corp.) · shown on this site as Baner
TalukaPune City
Street, as filed Baner
Bounded north by S No 73 Pvt Plot No 1
Bounded east by S No 74 and 75 Part
Bounded south by 24 Mtr Road
Bounded west by S No 72 Part 4

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerTejraj Realtors LLP
Registered office102, Bonita, V Deshmukh Path, Off Ghole Road, Shivajinagar, Pune 411005

Professionals named on the filing

Architect Deepali S Agarwal 39491
Engineer Ganesh Pillay
Engineer Rajendra Bhasme
Engineer Suresh Fulari
Engineer Yuvraj Kamble
Chartered Accountant Drp & Co LLP 133042
Chartered Accountant P B Shah 036382
Chartered Accountant Ritesh Chandrakant Gujar 153429
Chartered Accountant V.S. Potdar & Co 227050

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

10 March 2023 is when an advocate last certified the title to this land
Title report Titel Search report.pdf 10 March 2023
Promoter's declaration, Form B Form B Developer.pdf 13 March 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100050379
Promoter Tejraj Realtors LLP
Project typeResidential / Group Housing · Building development
LocalityBaner — Pune City taluka, pincode 411045
Applied on10 March 2023
Registered on05 April 2023
Completion, as first filed24 December 2028
Due24 December 2028
Units declared116
Units sold 108 of 116 sold (93%), 8 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 05 April 2023
Application referenceREA52100133719
Current statusActive
Record last changed 06 August 2026 · 39 days ago

Where the sold count comes from, and whether it holds up. 108 of 116 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 116 flats and reaches the same answer — 108 sold, every one with money recorded as received against a named flat, and 2 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 06 August 2026.

Common questions

Is Tejelevia Building C registered with MahaRERA?
Yes. It is registered as P52100050379, filed on 05 April 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Tejelevia Building C due to be handed over?
The promoter has told MahaRERA December 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Tejelevia Building C been delayed?
No. December 2028 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Tejelevia Building C?
A median of ₹11,344 per square foot of carpet, across 108 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Tejelevia Building C?
2 of 116 were still unsold at the promoter's last filing, in 4 BHK, from 1,439 sq ft of carpet.
Are there complaints against Tejelevia Building C?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Tejelevia Building C?
Tejraj Realtors LLP, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 12 September 2026. The authority's own page for P52100050379 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Baner

Stock image, not a photograph of Pinewood Phase II Stock image
Registered here
₹8,944
On offer
1, 2, 3 BHK
Under construction

Pinewood Phase II

Sainath Buildcon · Baner

39 sold
Due
Dec 2027
Units
98
Carpet
351–1,358
Sold at
₹1.1 crore
P52100055098